Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16051-16060 of 17877 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993885 | Project ID: 993885 DEA: 060V1304 EFIS: 0616000095 MINOR: 06A2801 | 06-KER-99-R39.1 | SR99 Northbound On and Off Ramps | at Merced Avenue | 10/05/2023 | 1 (07/06/2022) | Details CEM-3701 Report |
210321 | Project ID: 210321 DEA: 060H2404 EFIS: 0600020559 COOP: 061611 | 06-FRE-99-16.9/17.3 | SR99/ Cedar North Avenue Interchange | In Fresno County | 1 (06/14/2019) | Details CEM-3701 Report | |
2342 | Project ID: 2342 DEA: 04449604 | 04-SOL-80-R9.8 | STABILIIZE LANDSLIDE | IN SOLANO COUNTY IN AND NEARFAIRFIELD AT 0.3 KM EAST OF LYNCH ROAD UNDERCROSSING | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
4352 | Project ID: 4352 DEA: 074K6304 | 07-VEN-33- 7.8 | STABILIZE & REPAIR A STORM DAMAGED ROADWAY | IN VENTURE COUNTY, VENTURA 33 FROM PM 7.8 NORTHEAST TO PM 8.0, BOARDER OF THE OAK VIEW VILLAGE. DIR'S EMERGENCY F.A. CONTRACT | 09/27/2010 | 1 (09/28/2010) | Details CEM-3701 Report |
213495 | Project ID: 213495 DEA: 042J5504 EFIS: 0414000528 | 04-SON-101-33.5 | STABILIZE ABUTMENTS AND EMBANKMENT SLOPE BY INJECTION GROUT. | SONOMA COUNTY IN HEALDSBURG AT GRANT UNDERCROSSING | 04/22/2020 | 1 (10/16/2018) | Details CEM-3701 Report |
210121 | Project ID: 210121 DEA: 051G0504 EFIS: 0514000091 | 05-MON-1,001-VAR | Stabilize active rockfall; repair failed culvert | At various locations on Rte. 1 | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report |
4063 | Project ID: 4063 DEA: 07258604 | 07-LA-5,60,101,605-VAR | Stabilize And Pave Slope Areas. | 06/29/2012 | 1 (06/29/2012) | Details CEM-3701 Report | |
212049 | Project ID: 212049 DEA: 010G9104 EFIS: 0011700073 | 01-HUM-299-19.15/19.35 | Stabilize and Reconstruct roadway. | 01/07/2019 | 1 (10/03/2017) | Details CEM-3701 Report | |
10057 | Project ID: 10057 DEA: 051A9304 EFIS: 0512000042 | 05-SBT-101-.7 | Stabilize and Reconstruct Slope | Near Prunedale at .2 mile north of Cole Rd | 08/27/2018 | 1 (01/04/2016) | Details CEM-3701 Report |
995336 | Project ID: 995336 DEA: 072XE004 EFIS: 0723000090 | 07-LA-1-40.07/40.55 | Stabilize and reconstruct the side slope using native material, place geofabric against the side slope and on the base of the RSP, reconstruct the RSP with various sized rocks, remove and replace the damaged drainage pipes, replace the Hot Mix Asphalt (HMA) shoulder, replace the HMA Dike, cold plane | 1 (01/22/2024) | Details CEM-3701 Report |