Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15931-15940 of 18258 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214773Project ID: 214773
DEA: 081C6604
EFIS: 0812000341
08-RIV-215-R9.0/R16.0SEDIMENT CONTROL AND STABILIZATION MEASURES.RIVERSIDE COUNTY IN AND NEAR MURRIETA AND MENIFEE FROM 0.8 MILE NORTH OF ROUTE 15 TO 0.5 MILE NORTH OF SCOTT ROAD OVERCROSSING03/23/20211 (07/29/2020)Details CEM-3701 Report
212989Project ID: 212989
DEA: 081C6204
08-RIV-111-0.0/10.5SEDIMENT STABILIZATION AND EROSION CONTROLRIVERSIDE COUNTY FROM IMPERIAL COUNTY LINE TO 1.0 MILE EAST OF CLEVELAND STREET06/23/20211 (04/09/2018)Details CEM-3701 Report
211904Project ID: 211904
DEA: 081C6004
08-SBD-71-R6.9/R7.8SEDIMENT STABILIZATION, EROSION CONTROLSAN BERNARDINO COUNTY IN CHINO AND CHINO HILLS FROM 0.4 MILE SOUTH OF PINE AVENUE TO 0.2 MILE NORTH OF EUCLID AVENUE01/06/20201 (01/07/2019)Details CEM-3701 Report
211888Project ID: 211888
DEA: 081C6104
08-RIV-15-45.6/47.3SEDIMENT STABILIZATION/EROSION CONTROLIN RIVERSIDE COUNTY IN NORCO FROM 6TH STREET OVERCROSSING TO 0.2 MILE SOUTH OF 68TH STREET OVERCROSSING09/02/20201 (12/31/2018)Details CEM-3701 Report
763Project ID: 763
Permit Numbers: 0307NMC0479
03---SEE 032A2724 09/17/2014NOT VERIFIEDDetails CEM-3701 Report
3648Project ID: 3648
Permit Numbers: 07086DP1390
07-LA-1-36.35See Permit #0706-NSN-1363 (same job)See Permit #0706-NSN-1363 (same job)07/31/2018NOT VERIFIEDDetails CEM-3701 Report
6194Project ID: 6194
DEA: 11286204
EFIS: 1100000334
11-IMP-111-R6 - R6.5See Permit #1108-NMC-0516See Permit #1108-NMC-0516 2 (11/01/2010)Details CEM-3701 Report
5258Project ID: 5258
DEA: 08443924
EFIS: 0800000696
08-SBD-210-18.7-20.7Segment 10, Riverside Ave. Over crossing  1 (03/08/2007)Details CEM-3701 Report
214756Project ID: 214756
DEA: 050N7AU4
EFIS: 0520000030
05-SB-101-1.4/4.8Segment 4A - Carpinteria: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, epoxy coated rebar, precast box culverts, precast RCP.CARPINTERIA FROM 0.2 MILE SOUTH OF BAILARD AVENUE OVERCROSSING TO 0.7 MILE SOUTH OF SOUTH PADARO LANE09/27/20221 (03/09/2020)Details CEM-3701 Report
215081Project ID: 215081
DEA: 024H4204
EFIS: 0218000117
MINOR: 02A1886
02-SIS-96-60.76Seiad MS Fuel Facility 08/14/20231 (08/03/2020)Details CEM-3701 Report