Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15901-15910 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
6509 | Project ID: 6509 DEA: 120E0804 Permit Numbers: 1207NMC0258 | 12-ORA-405-11.0/11.2 | SUSAN STREET OFFRAMP OVERHEAD SIGN | 07/28/2010 | NOT VERIFIED | Details CEM-3701 Report | |
7786 | Project ID: 7786 DEA: 031A43A4 EFIS: 0313000005 | 03-SUT-99-10.9/14.7 | Sutter 99 Feather River Bridge : Widen to provide four lane segment | SUTTER COUNTY NEAR NICOLAUS FROM POWER LINE ROAD TO 0.1 MILE SOUTH OF LAUREL AVENUE | 11/30/2017 | 1 (10/02/2012) | Details CEM-3701 Report |
212535 | Project ID: 212535 DEA: 031A9204 EFIS: 0300020608 | 03-SUT-20-5-11.3 | SUTTER BYPASS WIDENING AND REHAB | NEAR YUBA CITY FROM SUTTER BYPASS TO 0.1 MILE WEST OF LYTLE ROAD. | 12/01/2021 | 1 (07/23/2018) | Details CEM-3701 Report |
214134 | Project ID: 214134 Permit Numbers: 0519NCS0156 05196DP0549 0519NRT0813 0519NRT0814 0519NRT0812 | 05---25.267 | Sycamore Drive Pedestrian Improvements Project, which includes ADA curb ramps and sidewalk, new curb and gutter, slurry seal and a new crosswalk. | Highway 246, Buellton | 10/29/2020 | 1 (09/30/2019) | Details CEM-3701 Report |
994287 | Project ID: 994287 DEA: 044G08A4 EFIS: 0421000306 COOP: 042891 | 04-SOL-I-80,I-505- | SYSTEM INTEGRATION OF MANAGED LANES | WESTBOUND AND EASTBOUND INTERSTATE 80 (I-80) FROM WEST OF RED TOP ROAD TO EAST OF INTERSTATE 505 (I-505) IN SOLANO COUNTY | 2 (09/23/2022) | Details CEM-3701 Report | |
213226 | Project ID: 213226 DEA: 010A7604 EFIS: 0100020337 Permit Numbers: 0117NOP0577 0118NDP0005 | 01-MEN-101-R23.33-R23.58 | Talmage Road Interchange | The north-south project limits extend from the SB off-ramp at approximately U.S. 101 PM R23.58 to the SB on-ramp at approximately U.S. 101 PM R23.33. The east-west project limits extend from western edge of the existing Talmage Road (S.R.) | 09/06/2019 | NOT VERIFIED | Details CEM-3701 Report |
211377 | Project ID: 211377 DEA: 120K1604 EFIS: 1213000148 | 12-ORA-5-23.94 | Technology Drive Extension | RTE 5 Irvine-extend Technology Dr | 1 (04/07/2016) | Details CEM-3701 Report | |
348 | Project ID: 348 DEA: 01497704 | 01-MEN-1-2.35/2.50 | TEMP ROADWAY RETREAT PROJECT AND RESTORE RETAINING WALLS | 03/11/2011 | 1 (11/12/2009) | Details CEM-3701 Report | |
7394 | Project ID: 7394 DEA: 031F6004 EFIS: 0300020566 | 03-ED-193-23.4 | TEMP SIGNAL SYSTEM; CONSTRUCT GABION, DRAINAGE AND PAVE. | EL DORADO COUNTY NEAR PLACERVILLE 2.0 MILES NORTH OF THE SOUTH FORK AMERICAN RIVER BRIDGE | 04/08/2013 | 1 (08/22/2012) | Details CEM-3701 Report |
210722 | Project ID: 210722 DEA: 051G5204 EFIS: 0515000043 MINOR: 05A1776 | 05-SLO-L5710- | Templeton Bunker | 1 (08/18/2015) | Details CEM-3701 Report |