Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15881-15890 of 17771 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1000815 | Project ID: 1000815 DEA: 040X2604 EFIS: 0424000084 | 04-SCL-280-3.83 | Southwest Pump Plant Repairs: Replace existing pumps including mechanical and electrical elements. | SCL-280-R3.38 Southwest Expressway OC Pump Plant 37 0259W. | NOT VERIFIED | Details CEM-3701 Report | |
995068 | Project ID: 995068 DEA: 11431994 | 11-SD-5-16.1 | SPALL REPAIRS, BRIDGE REMOVAL (PORTION), POLYESTER CONCRETE OVERLAY. | SAN DIEGO COUNTY AT 5/163 SEPARATION BRIDGE | 1 (06/11/2024) | Details CEM-3701 Report | |
995063 | Project ID: 995063 DEA: 112N1084 EFIS: 1121000057 | 11-SD-5-6.1,R22.9 | SPALL REPAIRS, PLACE JOINT SEALS, & PLACE POLYESTER CONCRETE OVERLAY. | SAN DIEGO COUNTY ON ROUTE 5 IN CHULA VISTA AT PALOMAR STREET OVERCROSSING AND IN SAN DIEGO AT DE ANZA OFF-RAMP UNDERCROSSING | 09/17/2024 | 1 (02/12/2024) | Details CEM-3701 Report |
6924 | Project ID: 6924 DEA: 11077604 EFIS: 1100000739 | 11-SD-5-R36.3/R37.4 | SPECIAL PORTLAND CEMENT CONCRETE GRIND FOR NOISE REDUCTION | SAN DIEGO COUNTY IN SAN DIEGO AND SOLANA BEACH FROM VIA DE LA VALLE UNDERCROSSING TO LOMAS SANTA FE DRIVE UNDERCROSSING | 09/18/2012 | 1 (09/20/2012) | Details CEM-3701 Report |
88889 | Project ID: 88889 DEA: CEMENT1 EFIS: CEMENT1 | 59--- | Special project for Caltrans cement lab. | NOT VERIFIED | Details CEM-3701 Report | ||
8801 | Project ID: 8801 DEA: AML-CEM EFIS: AML-CEM | 59--- | Special project for Cementitious Materials for use in Concrete Authorized Material List (AML) | NOT VERIFIED | Details CEM-3701 Report | ||
77777 | Project ID: 77777 DEA: CHEM-STOCK EFIS: CHEM-STOCK | 59--- | Special project for Chem Lab stock material. Object Code: 1025. J2 DEA: 912680. | NOT VERIFIED | Details CEM-3701 Report | ||
88885 | Project ID: 88885 DEA: Geotechnical Investigations EFIS: Geotechnical Investigations | 59--- | Special project for geotechnical investigations. | NOT VERIFIED | Details CEM-3701 Report | ||
22222 | Project ID: 22222 DEA: MAINTENANCE EFIS: MAINTENANCE | 59--- | Special project for materials used in maintenance projects. | NOT VERIFIED | Details CEM-3701 Report | ||
88887 | Project ID: 88887 DEA: PC-Barrier-STOCK EFIS: PC-Barrier-STOCK | 59--- | Special project for precast barrier rail stock material. | NOT VERIFIED | Details CEM-3701 Report |