Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15841-15850 of 16337 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
2967 | Project ID: 2967 DEA: 05448104 | 05-SB-101-R8.1 | WIDEN FREEWAY | IN SANTA BARBARA COUNTY NEARSUMMERLAND FROM 0.2 KM WEST OFEVANS AVENUE UNDERCROSSING TO 0.2 KM EAST OF SHEFFIELD DRIVE UNDERCROSSING | 08/10/2010 | 1 (08/10/2010) | Details Personnel CEM-3701 Report |
215425 | Project ID: 215425 DEA: 06360244 EFIS: 0613000005 | 06-TUL-99-30.6/35.2 | Widen Freeway & Bridge Construction (Concrete Bridge) | 1 (11/01/2021) | Details Personnel CEM-3701 Report | ||
6581 | Project ID: 6581 DEA: 120G9604 | 12-ORA-55-R7.8/R9.4 | WIDEN FREEWAY AND BRIDGE AND CONSTRUCT RETAINING/TIEBACK WALL. | ORANGE COUNTY, IN SANTA ANA, FROM 0.2 MILE SOUTH OF DYER ROAD UNDERCROSSING TO EDINGER AVENUE UNDERCROSSING | 08/22/2013 | 1 (06/06/2011) | Details Personnel CEM-3701 Report |
2071 | Project ID: 2071 DEA: 04263724 | 04-CC-80-15.3/21.9 | Widen Freeway And Bridge, Retaining Wall And Tos - Construct Eb HOV | 03/27/2013 | 1 (05/24/2011) | Details Personnel CEM-3701 Report | |
5931 | Project ID: 5931 DEA: 110301U4 | 11-SD-5-R 28.3 | WIDEN FREEWAY AND BRIDGES | IN SAN DIEGO COUNTY AT VARIOUSLOCATIONS | 07/28/2010 | NOT VERIFIED | Details Personnel CEM-3701 Report |
6545 | Project ID: 6545 DEA: 120G0404 | 12-ORA,RIV-91-15.9/18.9,0.0/2.9 | WIDEN FREEWAY AND BRIDGES FOR ROUTE 91/71 SEPARATION AND NEW CONNECTOR | IN ORANGE AND RIVERSIDE COUNTIES IN ANAHEIM AND YORBA LINDA NEAR CORONA FROM 1.0 MILE EAST OF ROUTE 91/241 SEPARATION TO 0.8 MILE EAST OF ROUTE 91/71 SEPARATION AND IN CHINO HILL STATE PARK | 12/02/2011 | 1 (12/02/2011) | Details Personnel CEM-3701 Report |
3448 | Project ID: 3448 DEA: 06442614 | 06-FRE-99-26.7/30.6 | WIDEN FREEWAY AND BRIDGES FROM 4 TO 6 LANES. | FRESNO COUNTY IN FRESNO FROM 0.2 MILE NORTH OF ASHLAN AVENUE OVERCROSSING TO 0.1 MILE NORTH OF GRANTLAND AVENUE UNDERCROSSING | 02/03/2012 | 1 (01/12/2011) | Details Personnel CEM-3701 Report |
3449 | Project ID: 3449 DEA: 06442614 EFIS: 0600000971 | 06-FRE-99-26.7/30.6 | Widen freeway and bridges from 4 to 6 lanes. | In Fresno Co. In Fresno From 0.2 Miles North Of Ashlan Ave. Overcrossing To 0.1 Miles North Of Grandtland Ave. Undercrossing | 07/28/2020 | 1 (08/12/2010) | Details Personnel CEM-3701 Report |
2038 | Project ID: 2038 DEA: 042409U4 | 04-SOL-80-12.9/20.8 | WIDEN FREEWAY AND BRIDGES, REHAB PAVEMENT AND UPGRADE MEDIAN BARRIER | 07/29/2011 | 1 (07/29/2011) | Details Personnel CEM-3701 Report | |
6428 | Project ID: 6428 DEA: 12071624 EFIS: 1200000036 | 12-ORA-22,405-R0.7/R2.9,20.4/22.3 | Widen freeway and construct bridges, retaining walls, and sound walls. | ORANGE COUNTY IN GARDEN GROVE, WESTMINSTER AND SEAL BEACH ON ROUTE 405 FROM 0.2 MILE SOUTH OF BOLSA CHICA ROAD OVERCROSSING TO 0.4 MILE SOUTH OF SEAL BEACH BOULEVARD OVERCROSSING AND ON ROUTE 22 FROM 2.0 MILES EAST OF BOLSA CHICA ROAD OVERCROSSING TO ROUT | 05/11/2015 | 1 (09/11/2012) | Details Personnel CEM-3701 Report |