Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15801-15810 of 17605 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
2791 | Project ID: 2791 DEA: 050Q0304 | 05-MON-101-96.1 | STABILIZE ERODED SLOPE AREA | In Monterey County near Pruedale at San Miguel Canyon Road Overcrossing | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
995523 | Project ID: 995523 DEA: 101S0104 EFIS: 1024000010 MINOR: 10A2594 | 10--- | Stabilize existing utilities, clear damaged landscaping, repair eroded embankment slope, remove sediment | 03/22/2024 | 1 (12/11/2023) | Details CEM-3701 Report | |
23 | Project ID: 23 DEA: 010A8904 EFIS: 0100020418 | 01-MEN-101-35.6/35.8 | Stabilize Roadway | 04/09/2013 | 1 (04/04/2011) | Details CEM-3701 Report | |
63 | Project ID: 63 DEA: 01388504 | 01-HUM-101-22.9 | STABILIZE ROADWAY | IN HUMBOLDT COUNTY NEAR REDCREST AT VARIOUS LOCATIONS | 01/23/2013 | 1 (01/23/2013) | Details CEM-3701 Report |
208932 | Project ID: 208932 DEA: 010B3004 EFIS: 0112000114 | 01-DN-101-21.9 | STABILIZE ROADWAY | DEL NORTE COUNTY 8.3 MILES NORTH OF WILSON CREEK BRIDGE | 08/30/2018 | 1 (06/14/2013) | Details CEM-3701 Report |
211174 | Project ID: 211174 DEA: 010G0304 | 01-DN-101-21.23, 21.23 | Stabilize Roadway | In Del Norte County near Crescent City at 0.22 miles north of Cushing Creek Viaduct 01-0076 | 12/21/2020 | 1 (01/03/2017) | Details CEM-3701 Report |
21 | Project ID: 21 DEA: 010A8704 EFIS: 0100020413 | 01-MEN-101-4.8/5.3 | Stabilize roadway and Dewater | Squaw Rock Sidehill Viaduct | 04/09/2013 | 1 (03/31/2011) | Details CEM-3701 Report |
2755 | Project ID: 2755 DEA: 050P3504 | 05-SLO-1-73.8 | Stabilize Roadway And Drainage Structures. | In San Luis Obispo County near Ragged Point 2.4 miles North of San Carpoforo Creek Bridge | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
2937 | Project ID: 2937 DEA: 051A2704 EFIS: 0500020329 | 05-MON-1-59.7/59.9 | Stabilize roadway and install temporary traffic signal | .1 mile north of Rocky Creek Bridge | 06/21/2013 | 1 (03/23/2011) | Details CEM-3701 Report |
7242 | Project ID: 7242 DEA: 01474414 EFIS: 0112000162 | 01-HUM-299-8.4/8.6 | STABILIZE ROADWAY, REALIGN ROADWAY, IMPROVE DRAINAGE, REPLACE CULVERTS | NEAR BLUE LAKE , AT 1.8 MILE EAST OF BUCKLEY RD. AND 0.1 MILE EAST OF THREE CREEKS RD | 12/19/2014 | 1 (06/11/2012) | Details CEM-3701 Report |