Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
995483 | Project ID: 995483 DEA: 99123456 | 99--- | THIS PROJECT WAS ADDED FOR E3101 DEVELOPMENT AND TESTING PURPOSES. DATA SUBMITTED FOR THIS PROJECT MUST NOT BE USED FOR ANY OTHER PURPOSES. | THIS PROJECT WAS ADDED FOR E3101 DEVELOPMENT AND TESTING PURPOSES. DATA SUBMITTED FOR THIS PROJECT MUST NOT BE USED FOR ANY OTHER PURPOSES. | NOT VERIFIED | Details CEM-3701 Report | |
994428 | Project ID: 994428 Permit Numbers: 04226DP2264 | 04-SCL-- | This project will add a guardrail and concrete barrier on the left edge of pavement of the ramp exit as it approaches the intersection at Moorpark Ave. | Moorpark Ave, San Jose CA | 1 (08/07/2023) | Details CEM-3701 Report | |
994317 | Project ID: 994317 DEA: 040K0304 EFIS: 0416000016 COOP: 042808 | 04-SCL-680-1.4/2.3 | THIS PROJECT WILL CONSTRUCT SOUNDWALLS ALONG INTERSTATE 680 (I-680) | BETWEEN CAPITOL EXPRESSWAY AND MUELLER AVENUE IN SAN JOSE. | 2 (10/06/2022) | Details CEM-3701 Report | |
993600 | Project ID: 993600 Permit Numbers: 0421NMC1750 0422NRD0223 04226DP0044 | 04-ALA--2.45 | This project will install a new traffic signal at the San Pablo Avenue (CALTRANS Route 123)/Parker Street intersection. The project will also install a new controller at the northwest corner, within the CALTRANS right-of-way. The new traffic signal would | San Pablo/Parker, Berkeley | 1 (03/09/2022) | Details CEM-3701 Report | |
209902 | Project ID: 209902 DEA: 041G7004 EFIS: 0400020169 Permit Numbers: 0414NMC0687 04146DP1506 | 04-SF-80-5.5/5.5 | This project will re-construction the WB I-80 Fremont off-Ramp by Creating a tee -intersection with Fremont st. and eliminating the the current free flowing Fremont Street dual left- turns at the end of the off-ramp. | Fremont St., San Francisco | 08/22/2018 | 2 (10/09/2014) | Details CEM-3701 Report |
215088 | Project ID: 215088 Permit Numbers: 0719NMC1895 0720NRW0051 07206DP1554 | 07---4.771/-1 | This project will restrict through movements for the north-south traffic by directing the northbound and southbound Junipero Avenue traffic to the east or west only. The project will include the removal of the through pavement markings and replace with left-right only pavement markings and the inst | Junipero Avenue, Long Beach, Signall Hill | 10/06/2022 | 1 (08/17/2020) | Details CEM-3701 Report |
7541 | Project ID: 7541 DEA: 041G9414 EFIS: 0400021104 Permit Numbers: 0412NMC1060 0413NRD0313 | 04-CC-4-28.6/30.5 | This project will widen SR4 from to eight lanes,plus auxiliary lanes,in each direction with concrete pavement from Hillcrest Avenue to SR 160. | Hillcrest Ave / SR4 Interchange, Antioch | 11/04/2016 | 2 (12/10/2012) | Details CEM-3701 Report |
208573 | Project ID: 208573 Permit Numbers: 0412NRW2131 0411NSN1865 04136DP0031 | 04-CC-80-1.67/1.67 | This proposal involves the modification of the traffic signal at the intersection of Potrero Ave/i-80 EB off -ramp/East shore Blvd. | i-80 Ramps at Potrero Ave., El Cerrito | 09/14/2018 | 1 (02/13/2013) | Details CEM-3701 Report |
215821 | Project ID: 215821 Permit Numbers: 0421NOP0353 | 04---1.9 | This Vehicle occupancy detection (VOD) pilot project is an extension of existing Bay Area toll authority (BATA)San Francisco Oakland Bay Bridge (SFOBB) TOLLING OPERATION. | SFOBB Toll Plaza, Oakland | NOT VERIFIED | Details CEM-3701 Report | |
3133 | Project ID: 3133 DEA: 060F2104 | 06-TUL-99-4.8/8.7 | Thrie beam barrier to be constructed | 04/21/2011 | 1 (07/23/2007) | Details CEM-3701 Report |