Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15691-15700 of 17778 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214669 | Project ID: 214669 DEA: 07325504 EFIS: 0716000085 | 07-LA-605- | Slab Replacement and Shoulder Resurfacing | 1 (07/12/2021) | Details CEM-3701 Report | ||
209239 | Project ID: 209239 DEA: 060P3804 EFIS: 0612000151 | 06-TUL-99-9.0/10.6 | SLAB REPLACEMENT WITH RAPID STRENGTH CONCRETE OR HOT MIX ASPHALT. | TULARE COUNTY NEAR PIXLEY FROM 0.7 MILE SOUTH OF AVENUE 76 UNDERCROSSING TO 1.7 MILES SOUTH OF AVENUE 96 OVERCROSSING | 04/24/2018 | 1 (12/19/2014) | Details CEM-3701 Report |
209211 | Project ID: 209211 DEA: 112M4304 EFIS: 1100020429 | 11-SD-8-6.3/9.0 | SLAB REPLACEMENT, COLD PLANE AND PLACE HMA. | SAN DIEGO COUNTY IN SAN DIEGO AND LA MESA FROM FAIRMOUNT AVENUE UNDERCROSSING TO 0.6 MILE WEST OF LAKE MURRAY BOULEVARD OVERCROSSING | 10/21/2014 | 1 (07/15/2014) | Details CEM-3701 Report |
212577 | Project ID: 212577 DEA: 11408704 EFIS: 1112000017 | 11-SD-8-9.0/15.3 | SLAB REPLACEMENT, COLD PLANE, GRIND PAVEMENT AND REPLACE GUARDRAIL. | SAN DIEGO COUNTY FROM 0.6 MILE WEST OF LAKE MURRAY BOULEVARD OVERCROSSING IN SAN DIEGO TO JOHNSON AVENUE UNDERCROSSING IN EL CAJON | 12/09/2019 | 1 (01/19/2018) | Details CEM-3701 Report |
215587 | Project ID: 215587 DEA: 081L6804 EFIS: 0820000138 | 08-RIV-91,15-7.5/13.4,8.2/23.9 | SLAB REPLACEMENT, PLACE SLURRY SEAL AND REPLACE AC SURFACING. | RIVERSIDE COUNTY IN AND NEAR CORONA AND MURRIETA ON ROUTE 91 FROM ROUTE 15/91 SEPARATION TO 0.4 MILE EAST OF TYLER STREET AND ON ROUTE 15 FROM 1.5 MILES NORTH OF WINCHESTER ROAD TO NICHOLS ROAD | 08/16/2023 | 1 (06/23/2021) | Details CEM-3701 Report |
211109 | Project ID: 211109 DEA: 060T5204 | 06-TUL-99-6.0/13.0 | Slab replacements | Near Pixley, from 0.2 mile South of the Ave 48 OC to 0.2 miles North of the Ave 100 OC | 08/02/2023 | 1 (04/11/2019) | Details CEM-3701 Report |
211131 | Project ID: 211131 DEA: 060V0404 | 06-KER,KER/KIN-5-82.9/85.75/0.0,9.0, VAR | Slab Replacements | In Kern /Kings County near Kettleman City from 9.9 miles N of the Rte 5/46 Jct to 7.6 miles S of the Rte 5/41 Jct. | 04/24/2018 | NOT VERIFIED | Details CEM-3701 Report |
211894 | Project ID: 211894 DEA: 060W0004 EFIS: 0617000100 | 06-FRE-99-0.9/6.5 | Slab replacements w AC | 08/02/2023 | 1 (06/05/2018) | Details CEM-3701 Report | |
215265 | Project ID: 215265 DEA: 010K7904 EFIS: 0121000010 | 01-DN-199-27.5/36.4, 27.5 - 36.4 | Slater Fire | 09/22/2021 | 1 (11/05/2020) | Details CEM-3701 Report | |
215381 | Project ID: 215381 DEA: 022J1104 EFIS: 0221000029 | 02-SIS-96-37/52, 37 - 52 | Slater fire drainage improvement | 09/30/2021 | 1 (12/24/2020) | Details CEM-3701 Report |