Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15681-15690 of 17257 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
212502Project ID: 212502
Permit Numbers: 0414NMC2455 04176DP1189 0418NRT0270
04-ALA-580-29.4/29.4The project,in general,consists of the installation of marked crosswalks,curb ramps;and modification of the existing traffic signal system,strom drain system,and pavement markings.Redwood Road, Castro Valley01/18/20191 (06/07/2017)Details CEM-3701 Report
213464Project ID: 213464
Permit Numbers: 04156MC1658 0417NRD1957
04-ALA-238-2.5/2.5The proposed improvements include rough grading,installation of curb,gutter,5' sidewalk,underground electrical/gas/telecom utilities,potable waterline crossing,sanitary sewer pipeline crossing,street trees,two street lights,and landscaping.38861 Mission Boulevard, Fremont08/22/20181 (06/28/2018)Details CEM-3701 Report
212940Project ID: 212940
Permit Numbers: 04176DP2479 0417NSN1238
04-SM-114-5.7-5.8The proposed improvements within Caltrans right-of-way include median modifications, traffic signal modifications and signing and striping improvements. These proposed improvements are intended to address immediate safety issues presented by the recent hiMenlo Park11/30/00-11 (12/05/2017)Details CEM-3701 Report
215052Project ID: 215052
Permit Numbers: 0420NMC0936 04206DP1418 0420NRD1499
04-MRN-101-14.7The proposed project includes installation of ADA curb ramps, full width grinding, hot mix asphalt overlay, adjusting utility irons, traffic signal loops, and striping on Lucas Valley Road/Smith Ranch Road from Highway 101 to Redwood Highway.Smith Ranch/Lucas Valley, San Rafael05/26/20221 (10/26/2020)Details CEM-3701 Report
3030Project ID: 3030
Permit Numbers: 0608NSN1013
06-FRE-33-61.18/61.18The proposed project includes the widening of State Route 33. In conjunction with said widening, striping, signage, pavement and concrete walk/returns are to be constructed. The installation of traffic signals are proposed at the intersection of Bass AvSR33, Mendota04/27/20182 (11/25/2014)Details CEM-3701 Report
210183Project ID: 210183
Permit Numbers: 04146DP2269 0413NMC2337
04-SM-101-3.5/3.5The proposed project will include widening the northbound off-ramp on the western side of the approach to accommodate an additional right-turn lane.Route 101, Menlo Park09/14/20181 (02/06/2015)Details CEM-3701 Report
213625Project ID: 213625
DEA: 11428504
EFIS: 1117000090
COOP: 118435
Permit Numbers: 11176DP0844
11-SD-75-12.65-13.15The proposed SR-75 and Hooper Boulevard intersection improvement project (PROJECT) will be part of the offsite improvements for P-947 Coastal Campus Entry Control Point Project beginning at STA 12+87 and ending at STA 33+53SR-75 and Hooper Boulevard Intersection 2 (09/12/2018)Details CEM-3701 Report
993108Project ID: 993108
Permit Numbers: 0421NMC2009
04---47.7/47.9The proposed widening of the NB 101 off-ramp at Moffett Blvd includes the following improvements within Caltrans right-of-way; constructing an additional NB right-turn lane, replacement MVP, and sidewalk and curb ramp, concrete barrier installation, modification of traffic signal and detector loopsNorthbound Off-Ramp at Moffett Blvd, Mountain View03/27/20231 (07/16/2021)Details CEM-3701 Report
6858Project ID: 6858
DEA: 043A7734
Permit Numbers: 0412NRT0901 0412NRT0913 0411NDP1529 0410NMC0139
04-CC--0/5The purpose of the I-80 Integrated Corridor Mobility (ICM) Traffic Signal Light Synchronization project (TLSP) is to assist in monitoring, and managing the traffic flow along the I-80 and State Route 123 corridor.I-80 AND SR 123, Var08/16/20131 (12/21/2012)Details CEM-3701 Report
214924Project ID: 214924
DEA: 080M9004
EFIS: 0812000248
COOP: 081695
08-RIV-111-18.0/19.0The purpose of the project is to provide a grade separated crossing over the existing UPRR, SR-111 and Hammond Road in the Mecca Community that will provide the following benefits: provide a secondary access point to the Community of Mecca.The project is in Riverside County from 0.47 miles east of State Route 86 to 0.45 miles west of Johnson Street. 2 (04/22/2020)Details CEM-3701 Report