Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15671-15680 of 17277 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
215568Project ID: 215568
DEA: 044H4404
EFIS: 0413000251
04-CC-4-33.4/0The overcrossing will include a multi-span bridge with a column in the Highway 4 median. Bridge approaches will be constructed on earthen embankments. The path will range from 12 to 16 feet in width.The Mokelumne Trail Bicycle/Pedestrian Overcrossing project will construct a pedestrian and bicycle bridge that spans Highway 4 – closing a gap along the Mokelumne Trail, and providing safe access for bicyclists and pedestrians. 2 (03/11/2021)Details CEM-3701 Report
993214Project ID: 993214
Permit Numbers: 0420NSN2101 0421NRT2638
04-ALA--1.575The Pedestrian Hybrid Beacon (Federal Aid Project No. HSIPL 5008 (151), City project no. PW1604) includes the installation of a Pedestrian Hybrid Beacon at Davis Street and Davis Street and Carpentier Street.Davis St., San Leandro 1 (09/02/2021)Details CEM-3701 Report
214101Project ID: 214101
Permit Numbers: 0417NMC1910
04-SM-82-9.35-10.07The Peninsula Corridor Joint Powers Board (JPB), which operates the San Francisco Bay Area's Caltrain passenger rail intends to extend 28th Avenue and 31st Avenue west of El Camino Real (SR 82) in the same location as existing driveway access points... 08/13/20212 (08/28/2019)Details CEM-3701 Report
214172Project ID: 214172
Permit Numbers: 0417NMC1910 04196DP0966
04-SM-82-9.35/10.07The Peninsula Corridor Joint Powers Board (JPB), which operates the San Francisco Bay Area's Caltrain passenger rail intends to extend 28th Avenue and 31st Avenue west of El Camino Real (SR 82) in the same location as existing driveway access points...S. El Camino Real, San Mateo03/16/20211 (05/22/2019)Details CEM-3701 Report
214953Project ID: 214953
DEA: 063HT024
EFIS: 0617000190
06-KER-VAR-The Project consists of 21 miles of trackway for the High?Speed Rail through the counties of Tulare and Kern in the vicinity of Wasco, California. It includes several grade separated crossings, a pedestrian crossing, and a non-standard structure.Counties of Tulare and Kern at SR43/SR46 2 (05/05/2020)Details CEM-3701 Report
3385Project ID: 3385
EFIS: 0000001155
Permit Numbers: 0610NUT0022
06-TUL-190-10.91/10.91The Project consists of the construction of two parallel reinforced concrete box culverts across State Route 190 that will have a combined design flow of 150 CFS. The contractor will USA construction area and pothole all existing utilities, provide trafficSR180, Porterville07/30/20182 (12/05/2014)Details CEM-3701 Report
212922Project ID: 212922
EFIS: 0415000339
Permit Numbers: 0417NOP1834 04176DP2017 04176DP2005
04-SM-82-6/6.8the Project improvements within Caltrans right-of-way include enhancing pedestrian facilities by widening existing sidewalks, utility adjustments, improving lighting, modifying drainage, installing crosswalk, and reconstructing curb ramps at Holly St., San Carlos Ave., and Cherry St...El Camino Real, San Carlos01/22/20201 (05/30/2018)Details CEM-3701 Report
993713Project ID: 993713
DEA: 11430334
EFIS: 1121000129
11-SD-5-0.3/36The project includes anchor, core, and satellite assets consisting of: pavement preservation; bridge preservation; drainage system restoration; transportation management systems; overhead sign structures and sign panels replacement.I-5 corridor from the Camino de la Plaza Overcrossing near the San Ysidro Land Port of Entry to 0.3 miles south of the Via de la Valle Undercrossing in San Diego, and on SR-905 at Milepost 12 1 (04/08/2022)Details CEM-3701 Report
210059Project ID: 210059
Permit Numbers: 04146DP2018 04126MC0315 0414NRD2083 04146RW0303
04-SON--32.8/32.9The project includes construction of a private road entrance,a left turn lane and appropriate transitions.15401 Sonoma hwy, Sonoma09/14/20181 (11/20/2014)Details CEM-3701 Report
1767Project ID: 1767
EFIS: 0000001155
Permit Numbers: 0410NMC1262
04-SM-82-24.6/24.9The project includes the widening and architectural treatment of the east sidewalk.Route 82- Mission Street, Daly City09/14/2018NOT VERIFIEDDetails CEM-3701 Report