Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15191-15200 of 17888 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212245 | Project ID: 212245 DEA: 024F8604 EFIS: 0213000043 | 02-TRI-36-26.7/27.1 | ROADWAY REALIGNMENT AND NEW BRIDGE CONSTRUCTION | TRINITY COUNTY ABOUT 9 MILES EAST OF FOREST GLEN FROM 0.6 MILE WEST TO 0.1 MILE WEST OF ROUTE 3 | 05/23/2022 | 1 (03/21/2017) | Details CEM-3701 Report |
209393 | Project ID: 209393 DEA: 081F0404 EFIS: 0814000150 | 08-SBD-395-38.3,42.7 | Roadway reconfigurations and repair damaged existing Type A asphalt concrete dike | From 1.8 mi north of Kramer Hills to 3.3 mi south of junction 395/58 in County of San Bernardino | 11/25/2014 | 1 (08/28/2023) | Details CEM-3701 Report |
210091 | Project ID: 210091 DEA: 010E9004 EFIS: 0115000044 | 01-MEN-101-36.0/38.9 | Roadway Reconstruction and Drainage/Slope Repair | Near Willits from 0.5/3.4 mile south of Ridgewood Ranch Road | 04/27/2018 | 1 (12/19/2014) | Details CEM-3701 Report |
989 | Project ID: 989 DEA: 032C8604 EFIS: 0300000310 | 03-PLA,NEV-80-56.1/66.3 | Roadway Reconstruction With Pcc Pavement And Hma Overlay. | 01/30/2015 | 1 (09/04/2012) | Details CEM-3701 Report | |
213959 | Project ID: 213959 DEA: 100T9104 EFIS: 1000000306 COOP: 10345,10446 | 10-STA-99-R4.1/F4.9 | Roadway reconstruction, including roadway and ramp widening and new traffic signals. The work also include retaining walls, ground anchor walls, detention basins, HMA paving, storm drain, and drainage basins. First day: 4/29/19, Completion: 6/2/20 | State Highway 99 in Stanislaus County In the City of Turlock from 0.4 mile south to 0.4 mile north of Fulkerth Road Undercrossing. | 07/23/2021 | 2 (02/21/2019) | Details CEM-3701 Report |
995282 | Project ID: 995282 Permit Numbers: 0420NMC2245 | 04-SM-84-25.9-26.1 | Roadway reconstruction; bike lane enhancement; sign & striping improvement; traffic signal modification; utility relocation/modification; drainage mod.; lighting improvements; and construct Bicycle and Pedestrian Bridge (BPOC) over Atherton Channel. | On State Highway 04-SM-84, Post Mile 25.9-26.1, in the City of Menlo Park. | 1 (10/27/2023) | Details CEM-3701 Report | |
602 | Project ID: 602 DEA: 02381104 | 02-SIS-5-R011.3/R017.2 | ROADWAY REHAB | 03/11/2011 | 1 (07/11/2007) | Details CEM-3701 Report | |
5568 | Project ID: 5568 DEA: 100G7704 | 10-STA-33-.5/1.5,12.5/14.5 | ROADWAY REHAB | 04/08/2011 | 1 (09/16/2009) | Details CEM-3701 Report | |
212673 | Project ID: 212673 DEA: 024E5704 EFIS: 0200020325 | 02--- | Roadway Rehab | 03/26/2021 | 1 (08/30/2017) | Details CEM-3701 Report | |
212618 | Project ID: 212618 DEA: 044G0564 EFIS: 0417000154 | 04-ALA-680-M2.4/M12.4 | ROADWAY REHAB, BRIDGE REPLACEMENT, RET. WALLS, TOLL SYSTEMS | FREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING | 12/08/2022 | 1 (10/16/2017) | Details CEM-3701 Report |