Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
209902Project ID: 209902
DEA: 041G7004
EFIS: 0400020169
Permit Numbers: 0414NMC0687 04146DP1506
04-SF-80-5.5/5.5This project will re-construction the WB I-80 Fremont off-Ramp by Creating a tee -intersection with Fremont st. and eliminating the the current free flowing Fremont Street dual left- turns at the end of the off-ramp.Fremont St., San Francisco08/22/20182 (10/09/2014)Details Personnel CEM-3701 Report
215088Project ID: 215088
Permit Numbers: 0719NMC1895 0720NRW0051 07206DP1554
07---4.771/-1This project will restrict through movements for the north-south traffic by directing the northbound and southbound Junipero Avenue traffic to the east or west only. The project will include the removal of the through pavement markings and replace with left-right only pavement markings and the instJunipero Avenue, Long Beach, Signall Hill10/06/20221 (08/17/2020)Details Personnel CEM-3701 Report
7541Project ID: 7541
DEA: 041G9414
EFIS: 0400021104
Permit Numbers: 0412NMC1060 0413NRD0313
04-CC-4-28.6/30.5This project will widen SR4 from to eight lanes,plus auxiliary lanes,in each direction with concrete pavement from Hillcrest Avenue to SR 160.Hillcrest Ave / SR4 Interchange, Antioch11/04/20162 (12/10/2012)Details Personnel CEM-3701 Report
208573Project ID: 208573
Permit Numbers: 0412NRW2131 0411NSN1865 04136DP0031
04-CC-80-1.67/1.67This proposal involves the modification of the traffic signal at the intersection of Potrero Ave/i-80 EB off -ramp/East shore Blvd.i-80 Ramps at Potrero Ave., El Cerrito09/14/20181 (02/13/2013)Details Personnel CEM-3701 Report
215821Project ID: 215821
Permit Numbers: 0421NOP0353
04---1.9This Vehicle occupancy detection (VOD) pilot project is an extension of existing Bay Area toll authority (BATA)San Francisco Oakland Bay Bridge (SFOBB) TOLLING OPERATION.SFOBB Toll Plaza, Oakland NOT VERIFIEDDetails Personnel CEM-3701 Report
3133Project ID: 3133
DEA: 060F2104
06-TUL-99-4.8/8.7Thrie beam barrier to be constructed 04/21/20111 (07/23/2007)Details Personnel CEM-3701 Report
994021Project ID: 994021
DEA: 010J4504
EFIS: 0011900041
01-HUM-101-80.80Tide Gate Repair 06/27/2022NOT VERIFIEDDetails Personnel CEM-3701 Report
210904Project ID: 210904
DEA: 081G5604
08-SBD-15,15-Var, VARTie into adjacent Recycled water transmission linesVarious : In Sbd on routes 210,15 in city of Rancho Cucamonga06/23/20211 (03/20/2018)Details Personnel CEM-3701 Report
212209Project ID: 212209
DEA: 040G2524
EFIS: 0400020536
Permit Numbers: 0417NOP0768
04-SF-80-4.9/5.9TJPA Bus Storage FacilityBridge No. 34C-008603/11/20202 (03/14/2017)Details Personnel CEM-3701 Report
215002Project ID: 215002
DEA: 041K6704
EFIS: 0416000284
04-ALA-980-1.2/1.2TMC NETWORK HARDWARE LIFECYCLE REPLACEMENT  1 (10/19/2020)Details Personnel CEM-3701 Report