Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14771-14780 of 17751 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
6637 | Project ID: 6637 DEA: 120H4104 | 12-ORA-39-17.3 | RESURFACE EXISTING ROADWAY | IN ORANGE AND LOS ANGELES COUNTIESIN LA MIRADA AND LA HABRA FROMROSECRANS AVENUE TO ROUTE 90 | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |
2709 | Project ID: 2709 DEA: 050N4904 | 05-SLO-1-25.7,34.4 | RESURFACE EXISTING ROADWAY WITH HMA (OG) AND SLURRY SEAL | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
211314 | Project ID: 211314 DEA: 051F3404 EFIS: 0513000102 | 05-SCR-236-0.1/17.7 | RESURFACE EXISTING ROADWAY WITH HMA (TYPE A) AND RHMA-G. | SANTA CRUZ COUNTY AT AND NEAR BOULDER CREEK FROM PINE STREET TO OLD MILL ROAD | 03/13/2018 | 1 (10/26/2016) | Details CEM-3701 Report |
213827 | Project ID: 213827 DEA: 051K3904 EFIS: 0518000169 | 05-SB-246-R16.7/R20.7 | RESURFACE EXISTING ROADWAY WITH RHMA (GAP GRADED). | SANTA BARBARA COUNTY ABOUT 6 MILES WEST OF BUELLTON FROM HAPGOOD ROAD (EAST) TO 0.5 MILE EAST OF SANTA ROSA CREEK BRIDGE | 12/30/2019 | 1 (08/20/2019) | Details CEM-3701 Report |
5656 | Project ID: 5656 DEA: 100N2104 | 10-STA,SJ-5-0.0/45.2,0.0/0.5 | Resurface existing roadway with rubberized asphalt concrete (type G) | 01/19/2011 | 1 (01/19/2011) | Details CEM-3701 Report | |
3251 | Project ID: 3251 DEA: 060J3904 | 06-TUL-99-27.6/33.3 | RESURFACE HIGHWAY W/ RUBBERIZED HOT MIX | 04/21/2011 | 1 (04/22/2008) | Details CEM-3701 Report | |
3255 | Project ID: 3255 DEA: 060J4304 | 06-MAD-145,233-VAR | RESURFACE HIGHWAY W/ RUBBERIZED HOT MIX | 04/21/2011 | 1 (04/30/2008) | Details CEM-3701 Report | |
5750 | Project ID: 5750 DEA: 100S2804 | 10-SJ-5-R13.8/25.4 | RESURFACE HIGHWAY W/ RUBBERIZED HOT MIX | San Joaquin County in and near Lathrop and Stockton from Paradise Cut Overflow Bridge to Route 5/4 Separation. | 11/23/2009 | 1 (12/07/2009) | Details CEM-3701 Report |
3259 | Project ID: 3259 DEA: 060J4704 | 06-FRE-33-0.0/49.5 | RESURFACE HIGHWAY W/ RUBBERIZED HOT MIX ASPHALT | 04/21/2011 | 1 (04/22/2008) | Details CEM-3701 Report | |
3228 | Project ID: 3228 DEA: 060H8804 | 06-KIN,TUL-43,63-VAR | RESURFACE HIGHWAY WITH RUBBERIZED HOT MIX ASPHALT | 04/21/2011 | 1 (04/15/2008) | Details CEM-3701 Report |