Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14761-14770 of 16334 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
215124Project ID: 215124
Permit Numbers: 0419NMC1857 04206DP1617 0420NRT1325
04---2.48The City of Vallejo will install high visibilty yellow crosswalks,CALTRANS DIB 82-06 compliant curb ramps,reconstruct ADA compliant driveways, modify signal and lighting, install loop detectors and pedestrian push button assemblies,install traffic bulb-outs surface utility adjustments, install storSonoma Boulevard, Vallejo 2 (08/21/2020)Details Personnel CEM-3701 Report
210689Project ID: 210689
DEA: 041J5604
EFIS: 0413000206
COOP: 042595
04-SM-101-6.3/20.8The extension of HOV Lanes in both directionsOn U.S. 101 from Whipple Avenue to I-380 in San Mateo County 2 (05/12/2017)Details Personnel CEM-3701 Report
993414Project ID: 993414
DEA: 081H1604
EFIS: 0816000168
COOP: 081705
08-SBD-10-The I-10 Alabama Street Improvement Project includes widening Alabama Street in the northbound direction to accommodate a right turn pocket at the I-10 eastbound on-ramp  2 (11/17/2021)Details Personnel CEM-3701 Report
215272Project ID: 215272
DEA: 031J7204
EFIS: 0321000053
03-COL,COL YOL-16,16 128-VariousThe major itmes of work include culverts replacement/cleaning erosion control measures. Fence replacement, ditch clearing, traffic control, and incidental work. 07/22/20211 (11/30/2020)Details Personnel CEM-3701 Report
210464Project ID: 210464
DEA: 04264054
EFIS: 0415000120
COOP: 042552
04-MRN-101-The Marin-Sonoma Narrows (MSN) High Occupancy Vehicle (HOV) Widening ProjectOff State Highway System- along U.S. 101, south of the Route 37 interchange in the City of Novato (Marin County), and ending north of the Corona Road Overcrossing in the City of Petaluma 1 (08/19/2019)Details Personnel CEM-3701 Report
209832Project ID: 209832
Permit Numbers: 04116MC1661
04-SCL-85-5.9/5.9The Modification of the northeast corner of the Hwy NB 85 offramp AT Almaden Expressway and associated work consists of asphalt paving,curb and gutter,sidewalk,signal modifications, joint trench and a new riser pole and guy.Almaden Expressway, San Jose09/14/20181 (10/06/2014)Details Personnel CEM-3701 Report
209833Project ID: 209833
Permit Numbers: 0412NMC1622
04-SCL-85-5.9/5.9The modification of the northest corner of the NB HWY 85 offramp at Almaden Expressway and adding a fourth lane transitions.Almaden Expressway, San Jose08/21/20181 (10/06/2014)Details Personnel CEM-3701 Report
211185Project ID: 211185
Permit Numbers: 04156DP0887 04146CS0327 04156RW2568 04156RT2624
04-SCL-82-13.1/13.1The off-site improvements include the removal and replacement of the sidewalk,curb,gutter,and driveway.2611- 2655 El Camino Real, Santa Clara01/18/20191 (02/01/2016)Details Personnel CEM-3701 Report
215568Project ID: 215568
DEA: 044H4404
EFIS: 0413000251
04-CC-4-33.4/0The overcrossing will include a multi-span bridge with a column in the Highway 4 median. Bridge approaches will be constructed on earthen embankments. The path will range from 12 to 16 feet in width.The Mokelumne Trail Bicycle/Pedestrian Overcrossing project will construct a pedestrian and bicycle bridge that spans Highway 4 – closing a gap along the Mokelumne Trail, and providing safe access for bicyclists and pedestrians. 2 (03/11/2021)Details Personnel CEM-3701 Report
993214Project ID: 993214
Permit Numbers: 0420NSN2101 0421NRT2638
04-ALA--1.575The Pedestrian Hybrid Beacon (Federal Aid Project No. HSIPL 5008 (151), City project no. PW1604) includes the installation of a Pedestrian Hybrid Beacon at Davis Street and Davis Street and Carpentier Street.Davis St., San Leandro 1 (09/02/2021)Details Personnel CEM-3701 Report