Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14391-14400 of 15902 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993108Project ID: 993108
Permit Numbers: 0421NMC2009
04---47.7/47.9The proposed widening of the NB 101 off-ramp at Moffett Blvd includes the following improvements within Caltrans right-of-way; constructing an additional NB right-turn lane, replacement MVP, and sidewalk and curb ramp, concrete barrier installation, modification of traffic signal and detector loopsNorthbound Off-Ramp at Moffett Blvd, Mountain View 1 (07/16/2021)Details Personnel CEM-3701 Report
6858Project ID: 6858
DEA: 043A7734
Permit Numbers: 0412NRT0901 0412NRT0913 0411NDP1529 0410NMC0139
04-CC--0/5The purpose of the I-80 Integrated Corridor Mobility (ICM) Traffic Signal Light Synchronization project (TLSP) is to assist in monitoring, and managing the traffic flow along the I-80 and State Route 123 corridor.I-80 AND SR 123, Var08/16/20131 (12/21/2012)Details Personnel CEM-3701 Report
214924Project ID: 214924
DEA: 080M9004
EFIS: 0812000248
COOP: 081695
08-RIV-111-18.0/19.0The purpose of the project is to provide a grade separated crossing over the existing UPRR, SR-111 and Hammond Road in the Mecca Community that will provide the following benefits: provide a secondary access point to the Community of Mecca.The project is in Riverside County from 0.47 miles east of State Route 86 to 0.45 miles west of Johnson Street. 2 (04/22/2020)Details Personnel CEM-3701 Report
210469Project ID: 210469
DEA: 042J1504
EFIS: 0414000432
04-CC-4,80,580,680-VarTHE REPLACEMENT OF OVERHEAD SIGNS WITH HIGH-PERFORMANCE REFLECTIVE SIGNS, REMOVAL OF EXISTING SIGNAGE LIGHTING, AND REMOVAL OF GANTRY CATWALKS ON SIGN-GANTRY STRUCTURES, WITHIN VARIOUS COUNTIESIN CONTRA COSTA COUNTY AT VARIOUS LOCATIONS12/21/20171 (03/20/2017)Details Personnel CEM-3701 Report
209466Project ID: 209466
DEA: 041J6504
EFIS: 0414000313
04-SOL-84-12.09The required temporary repairs include replacing deteriorated timber planks and stringers, placing corrugated metal over the existing timber deck system, and replacing asphalt concrete surfacing.Near Rio Vista at the Miner Slough Bridge05/26/20161 (03/31/2014)Details Personnel CEM-3701 Report
8159Project ID: 8159
Permit Numbers: 0412NMC0383 04136DP0013 0413NRW0185
04-ALA-123-4.4/4.43The San Pablo and Marin Avenue intersection consists of the following improvements:1. ADA compliant curb ramps.2. High visibility crosswalk in all four reaches of the intersection.3. Modified signal timing and equipment for eastbound bike/ped phase.4. AddSan Pablo Avenue , Albany10/21/20141 (11/28/2012)Details Personnel CEM-3701 Report
214677Project ID: 214677
DEA: 081F2604
EFIS: 0814000194
COOP: 081696
08-SBD-60-R7.83/R7.91The scope features right turn pockets, additional left turn pockets onto ramps from Archibald Avenue , widen ramps to accommodate additional lane and the enhancements of sidewalks,crosswalks amd curb rampsSR-60 and Archibald Avenue between East Oak Hill and Monticello Place08/19/20212 (01/30/2020)Details Personnel CEM-3701 Report
210489Project ID: 210489
DEA: 080F6314
EFIS: 0813000220
08-SBD-395-11.2/16.6The scope of project is widening approximately 5 miles of US 395 from two lanes to four lanes, repave existing lanes, modify five signals, upgrade ADA access, add turn lanes, add sound walls, and extend bridgeProject Limits are PM 11.2 from 16.6 and US 395.08/19/20212 (01/03/2019)Details Personnel CEM-3701 Report
993919Project ID: 993919
DEA: 071XW704
EFIS: 0722000254
07-LA/LA-103-1.59/1.59, 8.29/8.29The scope of work will be to repair damages to bridge structures, repair da maged slopes, construct hardscape to deter repeated damage to the State Highway System and to repair other damages to State assets 08/25/20221 (08/25/2022)Details Personnel CEM-3701 Report
212302Project ID: 212302
DEA: 080C70U4
EFIS: 0815000189
COOP: 081646
08-SBD-210-PM R 25The SR 210 Base Line Interchange project, in the City of Highland, includes widening of the Base Line overcrossing at the SR 210, along with additional ramp widening improvements for the northbound on-ramp, northbound off-ramp and southbound on-ramps.SR210 Lane Addition work proposes to improve SR 210 within the cities of Highland, Redlands, San Bernardino and unincorporated sections of San Bernardino County, 2 (01/15/2020)Details Personnel CEM-3701 Report