Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14241-14250 of 16001 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1216 | Project ID: 1216 DEA: 033M4904 | 03-BUT-70-28.2 | SPOT PREPARE AND PAINT BRIDGE | 12/17/2012 | 1 (05/12/2009) | Details Personnel CEM-3701 Report | |
5901 | Project ID: 5901 DEA: 103A7404 | 10-STA-108-022.4/026.5 | SR 108 REHABILITATION | 05/16/2011 | 1 (05/16/2011) | Details Personnel CEM-3701 Report | |
208916 | Project ID: 208916 EFIS: 1000000296 MINOR: 10A1514 | 10-AMA-12-VAR | SR 12/49 ADA CURB RAMPS INSTALLATION | IN AMADOR, CALAVERAS AND TUOLUMNE COUNTIES AT VARIOUS LOCATIONS | 12/06/2019 | 1 (06/05/2013) | Details Personnel CEM-3701 Report |
213919 | Project ID: 213919 DEA: 100P2004 EFIS: 1000000182 COOP: 100487 Permit Numbers: 1019NMC0209 | 10-SJ-120-R3.4 to PM R5.2 | SR 120 / Union Road Interchange. Construction of 4 new bridges and widening 47 feet of the overcrossing, reconstruction of all the ramps, auxiliary lanes on both sides of SR 120, Overhead sign and new traffic signals and lighting. | SR 120 from Airport Way to Union Road and from Union Road to Main Street | 08/04/2021 | 2 (07/31/2019) | Details Personnel CEM-3701 Report |
993389 | Project ID: 993389 DEA: 101J5405 EFIS: 1018000185 MINOR: 10A2284 | 10--120-6.15/6.15 | SR 120 and 205 Iron Fence | SR 120 and 205 | 1 (11/01/2021) | Details Personnel CEM-3701 Report | |
208944 | Project ID: 208944 DEA: 07187224 EFIS: 0700000189 | 07-LA-126-R6.8/R9.2 | SR 126/Commerce Center Drive Interchange Project | Northwest of the City of Santa Clarita in unincorporated Los Angeles County | 08/19/2021 | 1 (08/01/2013) | Details Personnel CEM-3701 Report |
214482 | Project ID: 214482 DEA: 10403503 EFIS: 1000000424 COOP: 104075 | 10-STA-132-R11.3/R14.7 | SR 132 West, Freeway / Expressway Phase 1; The Project consists of 4 bridges and 5 retaining walls. Two of the retaining walls include sound walls as part of the development system. This project also includes roadway improvements, landscaping and utiliti. | freeway/express way at a new alignment along the adopted State Route 132 route south of Kansas Avenue from Dakota Avenue to east of SR 99 at the Needham Street Bridge Overcrossing | 03/04/2022 | 2 (10/14/2019) | Details Personnel CEM-3701 Report |
6485 | Project ID: 6485 DEA: 120A9314 | 12-ORA-133-12.6 | SR 133 East Leg Widening Project. One lane is being added to the median side to both the NB & SB SR 133. MBGR will be installed as a median barrier along the entire length of the project | 2.5 miles in length and is located between the I-5 freeway and the SR 241 on the SR 133. | 07/28/2010 | 1 (07/28/2010) | Details Personnel CEM-3701 Report |
4751 | Project ID: 4751 EFIS: 0000001155 Permit Numbers: 08086MC0702 | 08-SBd-142-4.4 | SR 142 CHINO HILLS PARKWAY AND PEYTON DRIVE | 12/27/2010 | NOT VERIFIED | Details Personnel CEM-3701 Report | |
210016 | Project ID: 210016 DEA: 05316001 EFIS: 0500000497 | 05-MON-156- | SR 156 West Corridor Project - P3. Convert 2-lane to 4-lane freeway from Castroville to 101/156 interchange on US-101. Replace 101/156 interchange with more extensive interchange. New interchange at Castroville Blvd and Rt 156. | 05-MON-156-PM R1.6/T5.2 ,? 05-MON-101-PM 94.6/96.8 | 1 (09/27/2019) | Details Personnel CEM-3701 Report |