Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14071-14080 of 17257 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993938Project ID: 993938
DEA: 044W9504
EFIS: 0422000216
04-SF-ALA,SF,ALA-80-SF PM 7.8/ALA PM 7.4, SF 7.8/ALA 7.4Replace the current SFOBB-YBI 12 kV Power Transfer Switch (PST), replace two existing UPS to industrial UPS maintain electrical system, and replace three station batteries  1 (07/05/2022)Details CEM-3701 Report
995343Project ID: 995343
DEA: 072XF404
EFIS: 0723000124
07-LA-210-15.4/15.4Replace the damaged corrugated metal pipe, repair the damage to the surrounding drainage systems, fill the void in the sinkhole and replace the structural section of the shoulder.  1 (11/27/2023)Details CEM-3701 Report
208938Project ID: 208938
DEA: 060M4204
EFIS: 0600000964
06-FRE-41,180-R24.5/24.8,R57.9/R58.6REPLACE THE EXISTING METAL BEAM GUARD RAIL WITH CONCRETE BARRIER .FRESNO COUNTY IN FRESNO ON ROUTE 41 FROM THE ROUTE 180/41 CONNECTOR TO OLIVE AVENUE UNDERCROSSING AND ON ROUTE 180 FROM BLACKSTONE AVENUE UNDERCROSSING TO ROUTE 180/41 CONNECTOR.12/08/20201 (06/11/2014)Details CEM-3701 Report
212913Project ID: 212913
DEA: 071XG004
EFIS: 0718000157
07-VEN-150-20, 10.16, PM 20.16Replace the existing reinforced concrete box with a precast reinforced concrete box and repair roadway 06/03/20201 (01/11/2018)Details CEM-3701 Report
6857Project ID: 6857
EFIS: 0000001155
Permit Numbers: 0407NSN1169
04-ALA-185-3.2/3.7Replace the existing street light.Unlisted, San Leandro08/31/2018NOT VERIFIEDDetails CEM-3701 Report
6464Project ID: 6464
EFIS: 0000001155
Permit Numbers: 1208NSN0551
12-ORA-1-11.9/11.9REPLACE THE EXISTING TRAFFIC SIGNAL SYSTEM AND INSTALL A NEW 5-PHASE TRAFFIC SIGNAL SYSTEM WITH PROTECTED LEFT-TURN AT THE SR-1 (PCH) AT EL MORO ELEMENTARY SCHOOL/STATE PARK ENTRANCE IN UNICORP/ORANGE COUNTY. All performed work shall be in accordance withSR-1 (PCH) at El Moro Entrance, Unicorp. Orange C ounty09/08/2016NOT VERIFIEDDetails CEM-3701 Report
2125Project ID: 2125
DEA: 042A0704
EFIS: 0400020592
04-SCL-101-33.0/ 33.0REPLACE THE GIRDERS BETWEEN BENT 3 AND ABUTMENT 5.  1 (05/03/2011)Details CEM-3701 Report
211068Project ID: 211068
DEA: 080N5504
EFIS: 0800020102
08-SBD-40-R105.2/R106.5REPLACE THE LEFT WATSON WASH BRIDGE N0. 0805L 08/09/20181 (05/10/2016)Details CEM-3701 Report
995352Project ID: 995352
DEA: 043Y0004
EFIS: 0423000187
04-SCL-280-R4.57/R4.57Replace the pumps and size electrical controllers and conduits as soon as possible before more rainstorms  1 (12/11/2023)Details CEM-3701 Report
209332Project ID: 209332
DEA: 081E2604
EFIS: 0813000198
08-RIV-86-R4.24/R5.24Replace the superstructure of Kings Storm water Channel Bridge (Rt)In Riverside County ,west of Salton Sea near Kings Storm water Channel Right Bridge (56-0778R)04/07/20151 (04/28/2014)Details CEM-3701 Report