Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14071-14080 of 14333 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActionsSample
      
208592Project ID: 208592
DEA: 024E5204
EFIS: 0200020317
02-SHA-44-R21.0/R21.4WIDEN ROADWAY FOR LEFT TURN LANESHASTA COUNTY ABOUT 6 MILES WEST OF SHINGLETOWN FROM 0.2 MILE WEST TO 0.3 MILE EAST OF BLACK BUTTE ROAD01/02/20151 (02/28/2013)DetailsPersonnelView Sample
209041Project ID: 209041
DEA: 042A4304
EFIS: 0400000822
04-SCL-9-2.5/7.0WIDEN ROADWAY FOR REALIGNMENT, SOIL NAIL WALLS AND SOLDIER PILE WALL.SANTA CLARA COUNTY AT VARIOUS LOCATIONS FROM 2.0 MILES EAST OF HEATHER HEIGHTS ROAD TO 0.1 MILE WEST OF HANKONE GARDENS08/21/20181 (10/11/2013)DetailsPersonnelView Sample
5644Project ID: 5644
DEA: 100M9401
MINOR: 10A1021
10-TUO-49-1.95/2.02WIDEN ROADWAY FOR SLOW VEHICLE TURNOUT ON NB RTE 49 IN TUO CO. 04/17/2011NOT VERIFIEDDetailsPersonnelView Sample
3821Project ID: 3821
DEA: 07127274
EFIS: 0700000133
07-LA-138-102.0/106.2WIDEN ROADWAY FROM 2 TO 4 LANES WITH HMA OVER AB.LOS ANGELES COUNTY IN LLANO FROM 0.5 KM WEST OF 165TH STREET EAST TO 0.6 KM WEST OF 190TH STREET EAST07/31/20181 (03/05/2012)DetailsPersonnelView Sample
6401Project ID: 6401
DEA: 12043214
12-ORA-74-13.3WIDEN ROADWAY HWY 74 AND BRIDGES,RETAINING WALLIN ORANGE COUNTY NEAR SAN JUAN HOTSPRINGS FROM SAN JUAN CANYONBRIDGE TO RIVERSIDE COUNTY LINE07/28/2010NOT VERIFIEDDetailsPersonnelView Sample
4601Project ID: 4601
EFIS: 0000001155
Permit Numbers: 08056MC0402 08066RW0545 08056MC0402 08076RT0519
08-RIV-79-R7.76WIDEN ROADWAY ON RTE 79, INSTALL NEW TRAFFIC SIGNAL & DRAINAGE OUTLET 07/29/2010NOT VERIFIEDDetailsPersonnelView Sample
4075Project ID: 4075
DEA: 07266704
07-VEN-118-R43.3/R52.3WIDEN ROADWAY WITH CONCRETE OVER LCB AND INSTALL CONCRETE BARRIERTapo Canyon Rd. Widen(TIF)08/05/20111 (01/06/2012)DetailsPersonnelView Sample
214991Project ID: 214991
DEA: 044G2104
EFIS: 0412000310
04-NAP-121-0.5/1WIDEN ROADWAY WITH HMA & REPLACE CULVERT WITH STRUCTURAL CONC BRIDGE.NAPA COUNTY NEAR NAPA FROM 0.2 MILE SOUTH TO 0.3 MILE NORTH OF HUICHICA CREEK BRIDGE 1 (10/19/2020)DetailsPersonnelView Sample
210495Project ID: 210495
DEA: 010A5204
EFIS: 0100020425
01-HUM-299-R21.1/R21.5WIDEN ROADWAY WITH HMA AND AB, CONSTRUCT MSE AND MGSHUMBOLDT COUNTY ABOUT 16 MILES EAST OF BLUE LAKE FROM 0.5 TO 0.9 MILE EAST OF CHEZEM ROAD06/27/20171 (09/23/2015)DetailsPersonnelView Sample
7881Project ID: 7881
DEA: 013986A4
EFIS: 0112000298
01-LAK-53-WIDEN ROADWAY WITH HMA OVER ABIN LAKE COUNTY IN AND NEAR CLEARLAKE FROM 0.1 MILE SOUTH OF 40TH AVENUE/LAKESHORE DRIVE TO ROUTE 20/53 JUNCTION01/30/20151 (07/22/2013)DetailsPersonnelView Sample