Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13821-13830 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
2082 | Project ID: 2082 DEA: 04270514 | 04-SCL-680-M | REPLACE EXISTING MEDIAN BARRIER | IN SANTA CLARA COUNTY IN SAN JOSE AND MILPITAS FROM THE ROUTE 280 AND 101 JUNCTION TO CALAVERAS ROAD | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
208589 | Project ID: 208589 DEA: 033F4104 EFIS: 0312000283 | 03-PLA-49,80,193-0.0/0.9 | REPLACE EXISTING METAL BEAM GUARDRAIL WITH CONCRETE BARRIER RAIL. | NEAR AUBURN AND COLFAX, ON ROUTES 49, 80, AND 193 AT VARIOUS LOCATIONS. | 12/04/2014 | 1 (02/11/2013) | Details CEM-3701 Report |
213308 | Project ID: 213308 DEA: 080P4904 EFIS: 0813000125 | 08-RIV-60,91,215-12.2,21.7,R43.2,R12.0 | REPLACE EXISTING METAL BEAM GUARDRAIL WITH CONCRETE BARRIER. | RIVERSIDE COUNTY IN RIVERSIDE AND MORENO VALLEY AT 60/91/215 SEPARATION AND AT 60/215 SEPARATION. | 03/25/2020 | 1 (03/25/2020) | Details CEM-3701 Report |
993282 | Project ID: 993282 DEA: 032H5004 EFIS: 0317000120 | 03-NEV-80-R5.5/R5.8 | REPLACE EXISTING METAL ROOF. | STATE HIGHWAY IN NEVADA COUNTY APPROXIMATELY 10 MILES WEST OF TRUCKEE AT DONNER SUMMIT SAFETY ROADSIDE REST AREA | 05/24/2023 | 1 (10/01/2021) | Details CEM-3701 Report |
6553 | Project ID: 6553 DEA: 120G3704 | 12-ORA-241-15.5/39.0 | REPLACE EXISTING METAL SPACER BLOCKS WITH WOOD BLOCKS ON EXIST MBGRS | ORANGE COUNTY FROM OSO PARKWAY TO ROUTE 241/91 SEPARATION | 08/22/2012 | 1 (08/22/2012) | Details CEM-3701 Report |
3311 | Project ID: 3311 DEA: 060K7604 | 06-KER-119-31.1 | REPLACE EXISTING PAVEMENT WITH HMA AND JPCP PAVEMENTS. | KERN COUNTY IN BAKERSFIELD AT CAMPAGNONI STREET | 12/13/2012 | 1 (04/25/2011) | Details CEM-3701 Report |
2379 | Project ID: 2379 DEA: 044A6104 | 04-SOL-80-22.0/30.6 | REPLACE EXISTING PCC PAVEMENT | 09/20/2012 | 1 (09/20/2012) | Details CEM-3701 Report | |
4442 | Project ID: 4442 DEA: 074S5104 | 07-LA-5-28.9/37.4 | REPLACE EXISTING PCC SLABS AT VARIOUS LOCATIONS | 08/04/2010 | 1 (08/04/2010) | Details CEM-3701 Report | |
212104 | Project ID: 212104 DEA: 112M9504 EFIS: 1116000113 | 11-SD-52,805-0.0/2.0,21.6/25.7 | REPLACE EXISTING PCC SLABS WITH RAPID STRENGTH CONCRETE, SPALL REPAIR. | SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 52 FROM 0.3 MILE WEST OF ROUTE 52/5 SEPARATION TO 0.3 MILE WEST OF GENESEE AVENUE UNDERCROSSING AND ON ROUTE 805 FROM 0.1 MILE SOUTH OF BALBOA AVENUE OVERCROSSING TO 0.3 MILE NORTH OF NOBEL DRIVE OVERCROSSING | 08/20/2018 | 1 (06/29/2017) | Details CEM-3701 Report |
1540 | Project ID: 1540 EFIS: 0000001155 Permit Numbers: 0407NSN0058 | 04-ALA-61-20.8/21.77 | REPLACE EXISTING PEDESTRIAN SIGNAL HEADS W/ NEW COUNT DOWN AND PEDESTRIANS HEADS,AUBILE SIGNALS,DETECTABLE WARNING DEVICES | 05/04/2011 | NOT VERIFIED | Details CEM-3701 Report |