Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13721-13730 of 18841 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 993963 | Project ID: 993963 DEA: 081M6004 EFIS: 0821000145 | 08-RIV-74-80.5/82 | Repair fire damaged roadway | 12/06/2022 | 1 (12/05/2022) | Details CEM-3701 Report | |
| 994046 | Project ID: 994046 DEA: 071XP104 EFIS: 0720000124 | 07-LA-5,14,210-R42.6-47.9 / R24.8-27.0 / R0.0-1.9 | Repair fire damaged wire mesh, perform rock scaling, stabilize burnt slopes, restore burned landscape & EC | 10/06/2022 | 1 (10/06/2022) | Details CEM-3701 Report | |
| 210512 | Project ID: 210512 DEA: 074X4404 EFIS: 0715000294 | 07-LA-710-21.3, 21.3 | Repair fire related damage, pavement, barrier wall, fencing, and landscaping | South of Atlantic Blvd in the City of Bell within Los Angeles County | 08/16/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 994043 | Project ID: 994043 DEA: 042AC504 EFIS: 0420000118 | 04-SOL-80-0.3-1.0 | Repair fire-damaged electrical equipment | 08/15/2022 | 1 (08/15/2022) | Details CEM-3701 Report | |
| 213094 | Project ID: 213094 DEA: 071XG504 | 07-VEN-150,33,101,150-2.8/8 (33), VAR | Repair fire-damaged MBGR and guardrail terminal systems, replace all burned wood posts with metal posts, upgrade to MGS as needed with vegetation control and replace fire damaged crash cushions. | VEN-150,33 & 101 | 04/09/2019 | 1 (06/21/2018) | Details CEM-3701 Report |
| 213095 | Project ID: 213095 DEA: 071XG704 | 07-VEN-33-13.2/30.5 | Repair fire-damaged MBGR and guardrail terminal systems, replace all burned wood posts with metal posts, upgrade to MGS as needed with vegetation control and replace fire damaged crash cushions. | 02/07/2020 | 1 (02/07/2020) | Details CEM-3701 Report | |
| 993979 | Project ID: 993979 DEA: 071XG604 EFIS: 0718000210 | 07-VEN-150-19.9/32.7 | Repair fire-damaged MBGR and guardrail terminal systems, replace all burned wood posts with metal posts, upgrade to MGS as needed with vegetation control and replace fire damaged crash cushions. | 10/06/2022 | 1 (10/06/2022) | Details CEM-3701 Report | |
| 212976 | Project ID: 212976 DEA: 071XG204 | 07-LA-405-34.0/35.9 | Repair fire-damaged slopes, clean drainage systems and to protect the slopes from post-fire erosion. REPAIR FIRE DAMAGE FROM SKIRBALL FIRE | 08/30/2019 | NOT VERIFIED | Details CEM-3701 Report | |
| 213039 | Project ID: 213039 DEA: 071XG404 | 07-LA-5,5,126-VAR | Repair fire-damaged slopes, remove fire-damaged wood posts, repair MBGR, signs and to protect the support slopes from post-fire erosion. | 06/17/2021 | 1 (06/17/2021) | Details CEM-3701 Report | |
| 213038 | Project ID: 213038 DEA: 071XG304 | 07-LA-210,210,118-VAR | Repair fire-damaged slopes, repair MBGR, replace signs and to protect the support slopes from post-fire erosion. | 02/15/2019 | NOT VERIFIED | Details CEM-3701 Report |
