Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13511-13520 of 16960 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
1204Project ID: 1204
DEA: 033M3404
03-SAC-5-0.7/30.1Replace Joint Seals, Resurface Decks with Methacrylate and Polyester.SACRAMENTO COUNTY AT VARIOUS LOCATIONS FROM MIDDLE SLOUGH BRIDGE TO ROUTE 5/99 CONNECTOR SEPARATION07/06/20111 (07/06/2011)Details CEM-3701 Report
4404Project ID: 4404
DEA: 074L9904
07-LA-210-R32.8/R46.3REPLACE JOINT SEALS, SPPROACH SLABS,APPLY METHACRYLATE 08/04/20101 (08/04/2010)Details CEM-3701 Report
208756Project ID: 208756
DEA: 080R6604
EFIS: 0812000131
08-RIV,SBD-15,60,66,91,210,215-VarREPLACE JOINT SEALS, TREAT BRIDGE DECKS AND REPLACE APPROACH SLABSRIVERSIDE AND SAN BERNARDINO COUNTIES AT VARIOUS LOCATIONS04/04/20141 (08/01/2013)Details CEM-3701 Report
211935Project ID: 211935
DEA: 101F2604
EFIS: 1016000081
10-CAL,MER-4,33,59,99,152-VarREPLACE JOINT SEALS, TREAT BRIDGE DECKS, AND REPLACE APPROACH SLABS.CALAVERAS AND MERCED COUNTIES AT VARIOUS LOCATIONS01/24/2018NOT VERIFIEDDetails CEM-3701 Report
208699Project ID: 208699
DEA: 071W2504
EFIS: 0700021200
07-LA-10,60-14.3/18.0,0.0/0.3REPLACE JOINT SEALS.LOS ANGELES COUNTY IN LOS ANGELES ON ROUTE 10 FROM HOOVER STREET UNDERCROSSING TO LOS ANGELES RIVER BRIDGE AND OVERHEAD AND ON ROUTE 60 FROM LOS ANGELES RIVER BRIDGE AND OVERHEAD TO BOYLE AVENUE OVERCROSSING07/31/20141 (08/06/2013)Details CEM-3701 Report
1046Project ID: 1046
DEA: 032M2304
03-BUT,SUT-70-VARReplace joint seals; apply methacrylate. 03/22/20111 (03/22/2011)Details CEM-3701 Report
213490Project ID: 213490
DEA: 081K2004
EFIS: 0818000208
08-SBD,SBD-215-3.72Replace joints 06/23/20211 (06/23/2021)Details CEM-3701 Report
213654Project ID: 213654
DEA: 060T20U4
EFIS: 0619000008
06-KER-99-L0.0/11.2REPLACE JPCP LANES WITH CONTINUOUSLY REINFORCED CONCRETE PAVEMENT.KERN COUNTY NEAR WHEELER RIDGE FROM 0.8 MILE SOUTH OF ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING11/23/20211 (12/27/2018)Details CEM-3701 Report
210216Project ID: 210216
DEA: 044G6104
04-SCL-87-9.0/9.2REPLACE K-RAIL AND GUARDRAIL WITH TYPE 60 CONCRETE BARRIER.SANTA CLARA COUNTY IN SAN JOSE AT THE NORTHBOUND ROUTE 87 TO NORTHBOUND ROUTE 101 CONNECTOR RAMP09/28/20161 (03/05/2015)Details CEM-3701 Report
215675Project ID: 215675
DEA: 022J1604
EFIS: 0221000035
02-SHA-89-29.1/29.4, 29.1 - 29.4Replace Lake Britton bridge rail damaged by collision.Lake Britton Bridge09/27/20211 (04/08/2021)Details CEM-3701 Report