Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14831-14840 of 17447 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
6997 | Project ID: 6997 DEA: 073P3004 EFIS: 0700020176 MINOR: 07A3123 | 07-VEN-23-0.3/T1.5 | RHMA-G OVERLAY AND DIGOUTS. | 08/17/2021 | 2 (07/09/2021) | Details CEM-3701 Report | |
7020 | Project ID: 7020 DEA: 07273504 EFIS: 0700005113 | 07-LA-47,110,710-var | 08/19/2021 | 2 (06/01/2012) | Details CEM-3701 Report | ||
7033 | Project ID: 7033 DEA: 073P4604 EFIS: 0700020418 | 07-LA-60-1.2/2.0 | 1 (12/18/2012) | Details CEM-3701 Report | |||
7047 | Project ID: 7047 EFIS: 1100000484 MINOR: 11A1918 | 11--- | 1 (11/01/2010) | Details CEM-3701 Report | |||
7141 | Project ID: 7141 DEA: 041F7304 EFIS: 0412000403 | 04-CC-80- | replace finger joint assemblies on Carquinez bridge | 1 (02/29/2012) | Details CEM-3701 Report | ||
7184 | Project ID: 7184 DEA: 10415804 EFIS: 1000000431 | 10-MER-99-0.0/4.6 | 08/03/2018 | 1 (11/20/2012) | Details CEM-3701 Report | ||
7187 | Project ID: 7187 DEA: 04014044 EFIS: 0400000038 | 04-ALA-80- | 04-014041 SFOBB Maintenance Complex "" Paint Shop, Vehicle Maintenance, Electrical Maintenance "ยข Building project near the SFOBB toll plaza in Oakland. Project consists of three phases. Currently in PS&E phase with 50% plans in. | 05/18/2021 | 1 (02/21/2012) | Details CEM-3701 Report | |
7191 | Project ID: 7191 DEA: 11377804 EFIS: 1100000520 MINOR: 11A1915 | 11-SD-8-12.4 | Install three Chevron Signs on the WB 8 to NB 125 connector. | 1 (11/01/2010) | Details CEM-3701 Report | ||
7194 | Project ID: 7194 DEA: 120L6204 EFIS: 1200020190 MINOR: 12A1393 | 12-ORA-5,55,91,57,133-Var | Modify existing CCTV cameras mounting arm assembly on existing 60 and 90 foot poles at various locations on routes 5,55,57,91, and 133. | 09/30/2013 | NOT VERIFIED | Details CEM-3701 Report | |
7217 | Project ID: 7217 EFIS: 1200000372 MINOR: 12A1379 | 12-ORA-39- | Upgrade Lighting | 09/30/2014 | 1 (03/26/2013) | Details CEM-3701 Report |