Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17291-17300 of 17771 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
3203Project ID: 3203
DEA: 060G9504
06-TUL-63-R8.0/22.3CONSTRUCT CONCRETE CURB RAMPS AND MODIFY SIGNAL AND LIGHTING.TULARE COUNTY IN VISALIA AND CUTLER AT VARIOUS LOCATIONS FROM MOONEY BOULEVARD TO OROSI DRIVE12/13/20121 (04/27/2011)Details CEM-3701 Report
3273Project ID: 3273
DEA: 060J9404
06-TUL-198-R8.7/R9.0COLD PLANE ASPHALT CONCRETE PAVEMENT AND CONSTRUCT CONCRETE CURB.TULARE COUNTY IN VISALIA AT ROUTE 63/198 SEPARATION08/25/20111 (11/04/2011)Details CEM-3701 Report
209911Project ID: 209911
DEA: 060H6304
EFIS: 0600000132
06-TUL-198-R12.0CONSTRUCT PEDESTRIAN OVERCROSSINGTULARE COUNTY IN VISALIA AT SOUTH VISTA AVENUE PEDESTRIAN OVERCROSSING04/24/20181 (12/29/2014)Details CEM-3701 Report
210177Project ID: 210177
DEA: 060S1904
EFIS: 0614000118
06-TUL-198-R3.8/6.7CONSTRUCT INDIVIDUAL SLAB REPLACEMENT.TULARE COUNTY IN VISALIA FROM 0.1 MILE EAST OF ROUTE 99/198 SEPARATION TO AKERS STREET UNDERCROSSING02/23/20161 (02/05/2015)Details CEM-3701 Report
995005Project ID: 995005
DEA: 060X7004
EFIS: 0619000009
06-TUL-63-5.8/L8.0COLD PLANE PAVEMENT, PLACE RHMA-G, MODIFY LIGHTING AND SIGNAL SYSTEM.TULARE COUNTY IN VISALIA FROM 0.2 MILE SOUTH OF CALDWELL AVENUE TO ROUTE 63/198 SEPARATION 1 (07/27/2023)Details CEM-3701 Report
211747Project ID: 211747
DEA: 060R0504
EFIS: 0614000001
06-TUL-198-R4.2/R4.9,6.8/R8.3CONSTRUCT CONCRETE MEDIAN BARRIER, GUARDRAIL AND MESSAGE SIGN.TULARE COUNTY IN VISALIA FROM 0.6 MILE WEST OF ROAD 80 OVERCROSSING TO ROAD 80 OVERCROSSING AND FROM AKERS STREET UNDERCROSSING TO 0.2 MILE EAST OF COUNTY CENTER DRIVE OVERCROSSING08/28/20181 (10/04/2016)Details CEM-3701 Report
212903Project ID: 212903
DEA: 060U7204
EFIS: 0616000026
06-TUL-198-R10.4/R11.2WIDEN SHOULDER AND CONSTRUCT RUMBLE STRIP.TULARE COUNTY IN VISALIA FROM BURKE STREET OVERCROSSING TO 0.5 MILE EAST OF BEN MADDOX WAY OVERCROSSING06/26/20191 (04/10/2018)Details CEM-3701 Report
3124Project ID: 3124
DEA: 060F0004
EFIS: 0600000062
06-TUL-198-R9.5/R9.7WIDEN OFF-RAMP AND CONSTRUCT RETAINING WALL.TULARE COUNTY IN VISALIA FROM CONYER STREET OVERCROSSING TO WATSON STREET11/28/20121 (05/17/2012)Details CEM-3701 Report
3360Project ID: 3360
DEA: 060M4304
06-TUL-63-8.0/9.2;19.8/R30.0SLURRY SEAL ON EXISTING PAVEMENT.TULARE COUNTY IN VISALIA FROM MINERAL KING AVENUE TO SWEET AVENUE AND IN AND NEAR CUTLER AND OROSI FROM 0.3 MILE SOUTH OF AVENUE 388 TO FRESNO COUNTY LINE12/13/20121 (03/28/2011)Details CEM-3701 Report
993683Project ID: 993683
DEA: 060W3904
EFIS: 0617000204
06-TUL-63,198-L8.8RH/L9.2RH,R9.2/R9.7HMA, MODIFY SIGNAL AND LIGHTING SYSTEMS.TULARE COUNTY IN VISALIA ON ROUTE 198 FROM CONYER STREET OVERCROSSING TO WATSON STREET AND ON ROUTE 63 FROM WILLIS STREET TO COURT STREET06/27/20231 (04/04/2022)Details CEM-3701 Report