Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17281-17290 of 17758 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
210177 | Project ID: 210177 DEA: 060S1904 EFIS: 0614000118 | 06-TUL-198-R3.8/6.7 | CONSTRUCT INDIVIDUAL SLAB REPLACEMENT. | TULARE COUNTY IN VISALIA FROM 0.1 MILE EAST OF ROUTE 99/198 SEPARATION TO AKERS STREET UNDERCROSSING | 02/23/2016 | 1 (02/05/2015) | Details CEM-3701 Report |
995005 | Project ID: 995005 DEA: 060X7004 EFIS: 0619000009 | 06-TUL-63-5.8/L8.0 | COLD PLANE PAVEMENT, PLACE RHMA-G, MODIFY LIGHTING AND SIGNAL SYSTEM. | TULARE COUNTY IN VISALIA FROM 0.2 MILE SOUTH OF CALDWELL AVENUE TO ROUTE 63/198 SEPARATION | 1 (07/27/2023) | Details CEM-3701 Report | |
211747 | Project ID: 211747 DEA: 060R0504 EFIS: 0614000001 | 06-TUL-198-R4.2/R4.9,6.8/R8.3 | CONSTRUCT CONCRETE MEDIAN BARRIER, GUARDRAIL AND MESSAGE SIGN. | TULARE COUNTY IN VISALIA FROM 0.6 MILE WEST OF ROAD 80 OVERCROSSING TO ROAD 80 OVERCROSSING AND FROM AKERS STREET UNDERCROSSING TO 0.2 MILE EAST OF COUNTY CENTER DRIVE OVERCROSSING | 08/28/2018 | 1 (10/04/2016) | Details CEM-3701 Report |
212903 | Project ID: 212903 DEA: 060U7204 EFIS: 0616000026 | 06-TUL-198-R10.4/R11.2 | WIDEN SHOULDER AND CONSTRUCT RUMBLE STRIP. | TULARE COUNTY IN VISALIA FROM BURKE STREET OVERCROSSING TO 0.5 MILE EAST OF BEN MADDOX WAY OVERCROSSING | 06/26/2019 | 1 (04/10/2018) | Details CEM-3701 Report |
3124 | Project ID: 3124 DEA: 060F0004 EFIS: 0600000062 | 06-TUL-198-R9.5/R9.7 | WIDEN OFF-RAMP AND CONSTRUCT RETAINING WALL. | TULARE COUNTY IN VISALIA FROM CONYER STREET OVERCROSSING TO WATSON STREET | 11/28/2012 | 1 (05/17/2012) | Details CEM-3701 Report |
3360 | Project ID: 3360 DEA: 060M4304 | 06-TUL-63-8.0/9.2;19.8/R30.0 | SLURRY SEAL ON EXISTING PAVEMENT. | TULARE COUNTY IN VISALIA FROM MINERAL KING AVENUE TO SWEET AVENUE AND IN AND NEAR CUTLER AND OROSI FROM 0.3 MILE SOUTH OF AVENUE 388 TO FRESNO COUNTY LINE | 12/13/2012 | 1 (03/28/2011) | Details CEM-3701 Report |
993683 | Project ID: 993683 DEA: 060W3904 EFIS: 0617000204 | 06-TUL-63,198-L8.8RH/L9.2RH,R9.2/R9.7 | HMA, MODIFY SIGNAL AND LIGHTING SYSTEMS. | TULARE COUNTY IN VISALIA ON ROUTE 198 FROM CONYER STREET OVERCROSSING TO WATSON STREET AND ON ROUTE 63 FROM WILLIS STREET TO COURT STREET | 06/27/2023 | 1 (04/04/2022) | Details CEM-3701 Report |
3453 | Project ID: 3453 DEA: 06448104 | 06-TUL-245-0.0/12.0 | PLACE RUBBERIZED HOT MIX ASPHALT (TYPE G) ON EXISTING PAVEMENT. | TULARE COUNTY IN WOODLAKE FROM ROUTE 198 TO ROUTE 201 | 12/13/2012 | 1 (11/08/2010) | Details CEM-3701 Report |
208621 | Project ID: 208621 DEA: 060P7204 EFIS: 0612000247 | 06-TUL-245-16.0/21.0,26.0/33.0 | PLACE HOT MIX ASPHALT ON EXISTING PAVEMENT. | TULARE COUNTY NEAR BADGER FROM 0.2 MILE NORTH OF AVENUE 404 TO 2.6 SOUTH OF DRUM VALLEY ROAD AND FROM 2.4 MILES NORTH OF DRUM VALLEY ROAD TO FRESNO COUNTY LINE | 10/19/2020 | 1 (12/19/2014) | Details CEM-3701 Report |
209192 | Project ID: 209192 DEA: 060Q7704 EFIS: 0613000253 | 06-TUL-43-0.0/9.5 | REPAIR PAVEMENT AND OVERLAY WITH HMA SUPERPAVE (TYPE A). | TULARE COUNTY NEAR CORCORAN FROM KERN COUNTY LINE TO 1.9 MILES NORTH OF AVENUE 56 | 02/06/2015 | 1 (12/19/2014) | Details CEM-3701 Report |