Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17281-17290 of 17758 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
210177Project ID: 210177
DEA: 060S1904
EFIS: 0614000118
06-TUL-198-R3.8/6.7CONSTRUCT INDIVIDUAL SLAB REPLACEMENT.TULARE COUNTY IN VISALIA FROM 0.1 MILE EAST OF ROUTE 99/198 SEPARATION TO AKERS STREET UNDERCROSSING02/23/20161 (02/05/2015)Details CEM-3701 Report
995005Project ID: 995005
DEA: 060X7004
EFIS: 0619000009
06-TUL-63-5.8/L8.0COLD PLANE PAVEMENT, PLACE RHMA-G, MODIFY LIGHTING AND SIGNAL SYSTEM.TULARE COUNTY IN VISALIA FROM 0.2 MILE SOUTH OF CALDWELL AVENUE TO ROUTE 63/198 SEPARATION 1 (07/27/2023)Details CEM-3701 Report
211747Project ID: 211747
DEA: 060R0504
EFIS: 0614000001
06-TUL-198-R4.2/R4.9,6.8/R8.3CONSTRUCT CONCRETE MEDIAN BARRIER, GUARDRAIL AND MESSAGE SIGN.TULARE COUNTY IN VISALIA FROM 0.6 MILE WEST OF ROAD 80 OVERCROSSING TO ROAD 80 OVERCROSSING AND FROM AKERS STREET UNDERCROSSING TO 0.2 MILE EAST OF COUNTY CENTER DRIVE OVERCROSSING08/28/20181 (10/04/2016)Details CEM-3701 Report
212903Project ID: 212903
DEA: 060U7204
EFIS: 0616000026
06-TUL-198-R10.4/R11.2WIDEN SHOULDER AND CONSTRUCT RUMBLE STRIP.TULARE COUNTY IN VISALIA FROM BURKE STREET OVERCROSSING TO 0.5 MILE EAST OF BEN MADDOX WAY OVERCROSSING06/26/20191 (04/10/2018)Details CEM-3701 Report
3124Project ID: 3124
DEA: 060F0004
EFIS: 0600000062
06-TUL-198-R9.5/R9.7WIDEN OFF-RAMP AND CONSTRUCT RETAINING WALL.TULARE COUNTY IN VISALIA FROM CONYER STREET OVERCROSSING TO WATSON STREET11/28/20121 (05/17/2012)Details CEM-3701 Report
3360Project ID: 3360
DEA: 060M4304
06-TUL-63-8.0/9.2;19.8/R30.0SLURRY SEAL ON EXISTING PAVEMENT.TULARE COUNTY IN VISALIA FROM MINERAL KING AVENUE TO SWEET AVENUE AND IN AND NEAR CUTLER AND OROSI FROM 0.3 MILE SOUTH OF AVENUE 388 TO FRESNO COUNTY LINE12/13/20121 (03/28/2011)Details CEM-3701 Report
993683Project ID: 993683
DEA: 060W3904
EFIS: 0617000204
06-TUL-63,198-L8.8RH/L9.2RH,R9.2/R9.7HMA, MODIFY SIGNAL AND LIGHTING SYSTEMS.TULARE COUNTY IN VISALIA ON ROUTE 198 FROM CONYER STREET OVERCROSSING TO WATSON STREET AND ON ROUTE 63 FROM WILLIS STREET TO COURT STREET06/27/20231 (04/04/2022)Details CEM-3701 Report
3453Project ID: 3453
DEA: 06448104
06-TUL-245-0.0/12.0PLACE RUBBERIZED HOT MIX ASPHALT (TYPE G) ON EXISTING PAVEMENT.TULARE COUNTY IN WOODLAKE FROM ROUTE 198 TO ROUTE 20112/13/20121 (11/08/2010)Details CEM-3701 Report
208621Project ID: 208621
DEA: 060P7204
EFIS: 0612000247
06-TUL-245-16.0/21.0,26.0/33.0PLACE HOT MIX ASPHALT ON EXISTING PAVEMENT.TULARE COUNTY NEAR BADGER FROM 0.2 MILE NORTH OF AVENUE 404 TO 2.6 SOUTH OF DRUM VALLEY ROAD AND FROM 2.4 MILES NORTH OF DRUM VALLEY ROAD TO FRESNO COUNTY LINE10/19/20201 (12/19/2014)Details CEM-3701 Report
209192Project ID: 209192
DEA: 060Q7704
EFIS: 0613000253
06-TUL-43-0.0/9.5REPAIR PAVEMENT AND OVERLAY WITH HMA SUPERPAVE (TYPE A).TULARE COUNTY NEAR CORCORAN FROM KERN COUNTY LINE TO 1.9 MILES NORTH OF AVENUE 5602/06/20151 (12/19/2014)Details CEM-3701 Report