Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17251-17260 of 17288 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1125 | Project ID: 1125 DEA: 033E0704 | 03-YOL-5-0.8/2.5 | REMOVE AC, PLACE HMA AND POLYESTER CONCRETE, AND INSTALL JOINT SEALS. | YOLO COUNTY ON ROUTE 5 FROM 0.8 MILE WEST OF SACRAMENTO/YOLO COUNTY LINETO 5.8 MILES EAST OF ROUTE 5/113 SEPARATION | 04/20/2012 | 1 (11/01/2010) | Details CEM-3701 Report |
7222 | Project ID: 7222 DEA: 034M3804 | 03-YOL-50,80-0.0/2.6,8.9/R11.3 | REPLACE PAVEMENT DELINEATION | YOLO COUNTY ON ROUTE 50 FROM THE ROUTE 50/80 CONNECTOR SEPARATION TO THE SACRAMENTO RIVER VIADUCT AND ON ROUTE 80 FROM 0.3 MILE WEST OF ENTERPRISE BOULEVARD TO THE SACRAMENTO RIVER BRYTE BEND BRIDGE | 01/04/2013 | 1 (05/07/2012) | Details CEM-3701 Report |
1236 | Project ID: 1236 DEA: 033M7404 | 03-YOL,PLA-80,65-Various | PLACE OVERLAYS ON BRIDGE DECKS | YOLO COUNTY ON ROUTE 80 AT VARIOUS LOCATIONS AND IN PLACER COUNTY ON ROUTE 65 AT HARDING BOULEVARD OVERCROSSING | 11/28/2012 | 1 (11/28/2012) | Details CEM-3701 Report |
213026 | Project ID: 213026 DEA: 031G1304 | 03-PLA,SAC,YOL-80-var | REPLACE STRIPING | YOLO, SACRAMENTO, AND PLACER COUNTIES FROM SOLANO COUNTY LINE TO 0.2 MILE EAST OF ROUTE 80/174 SEPARATION | 01/08/2019 | NOT VERIFIED | Details CEM-3701 Report |
5530 | Project ID: 5530 EFIS: 0000001155 Permit Numbers: 1008NSN0162 | 10-STA-132-27.68/27.68 | Widen State Highway 132 to accommodate the eastbound/westbound lanes at the intersection of Western Avenue for the installation of the signal light. Work will also include signing, striping, curb, gutter, sidewalk, handicap ramps, drain inlets, property d | Yosemite Blvd., Waterford | 02/24/2014 | NOT VERIFIED | Details CEM-3701 Report |
215744 | Project ID: 215744 DEA: 033H93U4 EFIS: 0321000091 | 03-YUB,BUT-70-25.5/25.8,0.0/3.8 | WIDEN ROADWAY & SHOULDER, ADD TURN LANES & CONSTRUCT BRIDGE. | YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD | 1 (05/20/2021) | Details CEM-3701 Report | |
213152 | Project ID: 213152 DEA: 032F5904 EFIS: 0300020624 | 03-YUB,NEV-20-20.1/21.7, 0.0/0.1 | CURVE REALIGNMENT AND SHOULDER WIDENING | YUBA AND NEVADA COUNTIES NEAR SMARTSVILLE FROM 0.5 MILE WEST OF MCGANNEY LANE TO MOONEY FLAT ROAD | 12/06/2021 | 1 (04/24/2018) | Details CEM-3701 Report |
214080 | Project ID: 214080 DEA: 031G2904 EFIS: 0318000111 | 03-SIE,YUB-49-0.0/4.6,6.4/9.4 | PLACE RUBBERIZED HOT MIX ASPHALT BONDED WEARING COURSE OVERLAY. | YUBA AND SIERRA COUNTIES FROM 1.0 MILE NORTH OF CAMPTOWNVILLE ROAD TO FIDDLE CREEK BRIDGE | 05/05/2020 | 1 (04/29/2019) | Details CEM-3701 Report |
740 | Project ID: 740 EFIS: 0000001155 Permit Numbers: 03056SN0226 | 03-SUT-20-12.6/12.7 | Traffic Signal at Rte 20 @ Township | YUBA CITY | 12/17/2012 | NOT VERIFIED | Details CEM-3701 Report |
209945 | Project ID: 209945 DEA: 033F0004 EFIS: 0312000028 | 03-YUB-20-13.3/20.3 | RHMA OVERLAY, REPLACE GUARDRAIL | YUBA COUNTY ABOUT 12 MILES EAST OF MARYSVILLE FROM MARYSVILLE ROAD TO 0.3 MILE EAST OF LOWER SMARTSVILLE ROAD | 02/23/2016 | 1 (12/29/2014) | Details CEM-3701 Report |