Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17201-17210 of 17630 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993191 | Project ID: 993191 Permit Numbers: 0620NMC0847 | 06---23.66 | Removal and re-installation of traffic signal system, replacement of traffic signal pull boxes, removal and re-installation of conduits and cables to incorporate a left turn indication on Tulare Street. Replacement of traffic signal loop detectors, conduits and cables. Installation of pedestrian pu | Tulare Street, Fresno | 1 (08/23/2021) | Details CEM-3701 Report | |
215044 | Project ID: 215044 Permit Numbers: 04206DP1416 0418NRD1503 0419NRT3359 0420NRW1236 0420NRD1452 | 04---5 | Installation of Class ll bicycle facilities in both directions along Tunnel Road/Caldecott Lane,Concrete sidewalk and ADA pedestrian ramps on north side of Tunnel Road/Caldescott Lane and retaining walls to accommodate installation of sidewalk between approximately 540 ft. east of Hill Drive to SR2 | tunnel Road/Caldecott Lane, Oakland | 04/27/2023 | 1 (11/02/2020) | Details CEM-3701 Report |
214676 | Project ID: 214676 DEA: 100X1504 EFIS: 1012000157 MINOR: 10A2141 | 10--120-32.5 | FERRETTI ROAD DRAINAGE RESTORATION | Tuo County | 01/03/2023 | 1 (02/13/2020) | Details CEM-3701 Report |
214489 | Project ID: 214489 DEA: 101L6204 EFIS: 1020000041 | 10-TUO-49-23.63 | Replace damaged culverts | TUO SR 49 | 03/22/2023 | 1 (03/24/2020) | Details CEM-3701 Report |
209499 | Project ID: 209499 DEA: 100V4904 EFIS: 1000020502 | 10-TUO-92,82-R3.1,R3.9 | CONSTRUCT ROCK SLOPE PROTECTION. | TUOLMNE COUNTY NEAR SONORA AT 0.1 MILE EAST OF SULLIVAN CREEK BRIDGE AND AT 0.6 MILE WEST OF PEACEFUL OAK ROAD | 02/23/2016 | 1 (08/07/2014) | Details CEM-3701 Report |
214302 | Project ID: 214302 DEA: 100E9604 EFIS: 1013000254 | 10-TUO,TUO-120-32.5/R56.5 | COLD PLANE, PLACE HMA, REPLACE RAILING AND SIGNS. | TUOLUMNE AND MARIPOSA COUNTIES NEAR BUCK MEADOWS FROM FERRETTI ROAD TO YOSEMITE NATIONAL PARK BOUNDARY | 08/04/2021 | 1 (08/02/2019) | Details CEM-3701 Report |
212699 | Project ID: 212699 DEA: 103A7304 EFIS: 1013000050 | 10-TUO,STA-108,120-L0.0/L2.8,11.2/T18.2,R0.0/R24.1 | COLD PLANE AC PAVEMENT AND PLACE RUBBERIZED HOT MIX ASPHALT. | TUOLUMNE AND STANISLAUS COUNTIES NEAR SONORA ON ROUTE 108 FROM YOSEMITE JUNCTION TO MONTEZUMA ROAD AND ON ROUTE 120 FROM 0.2 MILE WEST OF LANCASTER ROAD TO MOCCASIN CREEK BRIDGE | 07/09/2019 | 1 (12/13/2018) | Details CEM-3701 Report |
213586 | Project ID: 213586 DEA: 100Y7904 EFIS: 1015000006 | 10-TUO-120-48.8 | SLOPE REPAIR | TUOLUMNE COUNTY ABOUT 5 MILES EAST OF BUCK MEADOWS AT 2 MILES EAST OF SOUTH FORK TUOLUMNE RIVER BRIDGE | 08/02/2019 | 1 (12/20/2018) | Details CEM-3701 Report |
213515 | Project ID: 213515 DEA: 101C5404 EFIS: 1015000029 | 10-TUO-108,120-L0.0/L0.4,11.6/12.2 | WIDEN INTERSECTION AND INSTALL SIGNAL LIGHTS. | TUOLUMNE COUNTY ABOUT 5.8 MILES WEST OF JAMESTOWN ON ROUTE 108 FROM ROUTE 120 TO 0.4 MILE EAST OF ROUTE 120 AND ON ROUTE 120 FROM 0.2 MILE NORTH OF O'BYRNES FERRY ROAD TO 0.1 MILE EAST OF ROUTE 108 | 01/22/2020 | 1 (12/20/2018) | Details CEM-3701 Report |
6946 | Project ID: 6946 DEA: 100S2404 EFIS: 1000000228 | 10-TUO-108-58.8 | CONSTRUCT SOLDIER PILE WALL | TUOLUMNE COUNTY ABOUT 8.5 MILES EAST OF DARDANELLE AT 0.9 MILES EAST OF KENNEDY MEADOWS ROAD | 10/28/2013 | 1 (06/11/2012) | Details CEM-3701 Report |