Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17201-17210 of 17630 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993191Project ID: 993191
Permit Numbers: 0620NMC0847
06---23.66Removal and re-installation of traffic signal system, replacement of traffic signal pull boxes, removal and re-installation of conduits and cables to incorporate a left turn indication on Tulare Street. Replacement of traffic signal loop detectors, conduits and cables. Installation of pedestrian puTulare Street, Fresno 1 (08/23/2021)Details CEM-3701 Report
215044Project ID: 215044
Permit Numbers: 04206DP1416 0418NRD1503 0419NRT3359 0420NRW1236 0420NRD1452
04---5Installation of Class ll bicycle facilities in both directions along Tunnel Road/Caldecott Lane,Concrete sidewalk and ADA pedestrian ramps on north side of Tunnel Road/Caldescott Lane and retaining walls to accommodate installation of sidewalk between approximately 540 ft. east of Hill Drive to SR2tunnel Road/Caldecott Lane, Oakland04/27/20231 (11/02/2020)Details CEM-3701 Report
214676Project ID: 214676
DEA: 100X1504
EFIS: 1012000157
MINOR: 10A2141
10--120-32.5FERRETTI ROAD DRAINAGE RESTORATIONTuo County01/03/20231 (02/13/2020)Details CEM-3701 Report
214489Project ID: 214489
DEA: 101L6204
EFIS: 1020000041
10-TUO-49-23.63Replace damaged culvertsTUO SR 4903/22/20231 (03/24/2020)Details CEM-3701 Report
209499Project ID: 209499
DEA: 100V4904
EFIS: 1000020502
10-TUO-92,82-R3.1,R3.9CONSTRUCT ROCK SLOPE PROTECTION.TUOLMNE COUNTY NEAR SONORA AT 0.1 MILE EAST OF SULLIVAN CREEK BRIDGE AND AT 0.6 MILE WEST OF PEACEFUL OAK ROAD02/23/20161 (08/07/2014)Details CEM-3701 Report
214302Project ID: 214302
DEA: 100E9604
EFIS: 1013000254
10-TUO,TUO-120-32.5/R56.5COLD PLANE, PLACE HMA, REPLACE RAILING AND SIGNS.TUOLUMNE AND MARIPOSA COUNTIES NEAR BUCK MEADOWS FROM FERRETTI ROAD TO YOSEMITE NATIONAL PARK BOUNDARY08/04/20211 (08/02/2019)Details CEM-3701 Report
212699Project ID: 212699
DEA: 103A7304
EFIS: 1013000050
10-TUO,STA-108,120-L0.0/L2.8,11.2/T18.2,R0.0/R24.1COLD PLANE AC PAVEMENT AND PLACE RUBBERIZED HOT MIX ASPHALT.TUOLUMNE AND STANISLAUS COUNTIES NEAR SONORA ON ROUTE 108 FROM YOSEMITE JUNCTION TO MONTEZUMA ROAD AND ON ROUTE 120 FROM 0.2 MILE WEST OF LANCASTER ROAD TO MOCCASIN CREEK BRIDGE07/09/20191 (12/13/2018)Details CEM-3701 Report
213586Project ID: 213586
DEA: 100Y7904
EFIS: 1015000006
10-TUO-120-48.8SLOPE REPAIRTUOLUMNE COUNTY ABOUT 5 MILES EAST OF BUCK MEADOWS AT 2 MILES EAST OF SOUTH FORK TUOLUMNE RIVER BRIDGE08/02/20191 (12/20/2018)Details CEM-3701 Report
213515Project ID: 213515
DEA: 101C5404
EFIS: 1015000029
10-TUO-108,120-L0.0/L0.4,11.6/12.2WIDEN INTERSECTION AND INSTALL SIGNAL LIGHTS.TUOLUMNE COUNTY ABOUT 5.8 MILES WEST OF JAMESTOWN ON ROUTE 108 FROM ROUTE 120 TO 0.4 MILE EAST OF ROUTE 120 AND ON ROUTE 120 FROM 0.2 MILE NORTH OF O'BYRNES FERRY ROAD TO 0.1 MILE EAST OF ROUTE 10801/22/20201 (12/20/2018)Details CEM-3701 Report
6946Project ID: 6946
DEA: 100S2404
EFIS: 1000000228
10-TUO-108-58.8CONSTRUCT SOLDIER PILE WALLTUOLUMNE COUNTY ABOUT 8.5 MILES EAST OF DARDANELLE AT 0.9 MILES EAST OF KENNEDY MEADOWS ROAD10/28/20131 (06/11/2012)Details CEM-3701 Report