Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16921-16930 of 17447 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
3395Project ID: 3395
DEA: 06324504
EFIS: 0600000366
06-TUL,FRE-99-41.3/R53.9,R0.0/R1.2WIDEN 4 LANES TO 6 LANES.TULARE AND FRESNO COUNTIES IN AND NEAR KINGSBURG FROM 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD TO 0.2 MILE NORTH OF ROUTE 99/201 CONEJO AVENUE SEPARATION02/16/20211 (04/11/2012)Details CEM-3701 Report
994577Project ID: 994577
DEA: 060V7604
EFIS: 0616000220
06-TUL,FRE-99-51.8/R53.9,R0.0/R0.3UPGRADE WATER AND WASTEWATER SYSTEMS AT ROADSIDE REST AREA.TULARE AND FRESNO COUNTIES IN AND NEAR KINGSBURG FROM DODGE AVENUE OVERCROSSING TO 0.7 MILE NORTH OF MENDOCINO AVENUE OVERCROSSING 1 (05/10/2023)Details CEM-3701 Report
208620Project ID: 208620
DEA: 060P6104
EFIS: 0612000185
06-KIN,TUL-43-18.2/27.2,9.5/22.7,PLACE RHMA-G AND RBWC-G ON EXISTING PAVEMENT.TULARE AND KINGS COUNTIES NEAR CORCORAN AND HANFORD FROM 0.6 MILE SOUTH OF DEEK CREEK BRIDGE TO KINGS COUNTY LINE AND FROM ROUTE 43/198 SEPARATION TO FRESNO COUNTY LINE01/30/20151 (10/30/2013)Details CEM-3701 Report
8142Project ID: 8142
DEA: 060M8004
EFIS: 0600020012
06-MAD,MAD-65,99-25.2/25.6,23.3/23.8CONSTRUCT THRIE BEAM AND CONCRETE MEDIAN BARRIERTULARE AND MADERA COUNTIES ON ROUTE 65 FROM 0.1 MILES NORTH OF AVENUE 196 TO 0.1 MILES SOUTH OF AVENUE 200 AND ON ROUTE 99 FROM 0.2 MILES NORTH OF CALIFA UNDERPASS TO AVENUE 24 OVERCROSSING05/28/20131 (12/10/2012)Details CEM-3701 Report
213669Project ID: 213669
DEA: 06324524
EFIS: 0617000065
MINOR: 06A2459
06-TUL-52.5-KINGS RIVER MITIGATION PLANT ESTABLISHMENTTulare County11/29/20221 (01/31/2020)Details CEM-3701 Report
993284Project ID: 993284
DEA: 060U7704
EFIS: 0616000035
06-TUL-99-22.3INSTALL WATER/WASTEWATER SYSTEMS AND LANDSCAPE WORK.TULARE COUNTY 3 MILES NORTH OF TIPTON AT THE PHILIP S RAINE SAFETY ROADSIDE REST AREA 1 (10/04/2021)Details CEM-3701 Report
209069Project ID: 209069
DEA: 060N3904
EFIS: 0600020698
06-TUL-245-20.8CONSTRUCT ROCK SLOPE PROTECTION.TULARE COUNTY ABOUT 10 MILES SOUTH OF BADGER AT COTTONWOOD CREEK BRIDGE08/06/20151 (10/15/2014)Details CEM-3701 Report
209146Project ID: 209146
DEA: 06471504
EFIS: 0600000464
COOP: 061549
06-TUL-99-39.6/41.3RECONSTRUCT INTERCHANGE WITH NEW PUMPING PLANT.TULARE COUNTY AT GOSHEN FROM 0.9 MILE NORTH OF ROUTE 99/198 WEST SEPARATION TO 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD03/03/20201 (10/08/2013)Details CEM-3701 Report
3201Project ID: 3201
DEA: 060G9304
06-TUL-65,99,137,190,198,216-VarCONSTRUCT CONCRETE CURB RAMPS AND MODIFY SIGNAL AND LIGHTING.TULARE COUNTY AT VARIOUS LOCATIONS04/27/20111 (04/27/2011)Details CEM-3701 Report
3293Project ID: 3293
DEA: 060K4404
06-TUL-65,99,137,198-VarSEAL BRIDGE DECKS WITH METHACRYLATE, REPLACE JOINT AND CHIP SEALS.TULARE COUNTY AT VARIOUS LOCATIONS12/13/20121 (02/28/2011)Details CEM-3701 Report