Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16691-16700 of 17778 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
215362Project ID: 215362
Permit Numbers: 10206MC0075 10216RT0422
10---8.152Modify westbound MacArthur I-205 off ramp work which includes adding a new 12-foot left-turn pocket to match existing structural pavement section and to conform to the existing grade, new shoulders, striping of left turn pockets and through lanes under the freeway, and modification of traffic signaSR 205, Tracy03/03/20221 (12/10/2020)Details CEM-3701 Report
215480Project ID: 215480
Permit Numbers: 10196MC0702
10---1.373Construct approximately 150' concrete curb & gutter, AC grind & overly, and replace electrical loops located at International Parkway and I-205 eastbound on-ramp intersection in the City of Tracy. All work shall conform to the approved plans and special provisions per Caltrans Standard SSR 205, Tracy03/03/20221 (02/12/2021)Details CEM-3701 Report
1793Project ID: 1793
DEA: 040G4604
EFIS: 0400000334
COOP: 042314
Permit Numbers: 0411NMC0901 0411NRW1894
04-SCL-237-4.69/9.33Caltrans is proposing to construct the project which involves conversion of existing high occupancy vehicle (Hov)direct connector ramps at the SR 237/ I-880 Interchange to express lanes, with single occupant vehicles permitted by paying a toll.SR 237, I-880, Var08/21/20181 (07/05/2011)Details CEM-3701 Report
208632Project ID: 208632
DEA: 050T9204
EFIS: 0500020194
COOP: 05CA0254
Permit Numbers: 0512NSN0241
05-SB-246-8.78/9.15Install traffic signal, safety lighting, signal interconnect, and reconstruct four curb ramps at the intersection of State Route 246 and R Street as shown on the attached plans, as directed by cooperative agreement 05-CA-0254 and as directed by the permiSR 246, Lompoc09/17/20182 (03/14/2013)Details CEM-3701 Report
209006Project ID: 209006
Permit Numbers: 10136UL0322
10-SJ-26-1.38/1.38Trench to place one 26"x55"x4' high cabinet on 6'x9' concrete pad; from new cabinet location, trench 10'east to existing joint pole, bore 160' east along edge of right of way to existing cabinet, and trench 132' west along edge of right of way to existingSR 26, Stockton12/04/20181 (08/07/2014)Details CEM-3701 Report
210422Project ID: 210422
DEA: 07297604
EFIS: 0713000212
07-LA-27-13.3/13.7Westfield West Valley Offsite ImprovementsSR 27 Topanga Canyon Boulevard Widening08/17/20212 (10/01/2014)Details CEM-3701 Report
215111Project ID: 215111
Permit Numbers: 0220NSN0268 0219NUE0397 02216DP0201 0221NRT0548
02---52.5/52.65New encroachment for signalized intersection construction for Phase 2 of County Road 266 (lance Gulch Road aka East Connector) where it intersects with State Highway 299 and Glen Road. Work includes removal of existing stop signs, flashing beacons, and intersection lighting, construction of new trSR 299 / Glen Road / Lance Gulch Road, Weaverville04/11/20241 (08/23/2021)Details CEM-3701 Report
210055Project ID: 210055
Permit Numbers: 1012NMC0750
10-SJ-4-17.61/17.61Install Emergency Vehicle Preemption System at the intersections of State Highway 4 westbound ramps and Wilson Way, and State Highway 4 eastbound ramps and Wilson, as shown on the approved plans. The work also includes the installation of a City of Stockton Pan-Tilt Zoom (PTZ) Closed-Circuit TelevSR 4, Stockton02/06/20151 (11/17/2014)Details CEM-3701 Report
212923Project ID: 212923
Permit Numbers: 1016NMC0531 1017NRT0598
10---18.6Install and maintain in perpetuity the Emergency Vehicle Preemption System at the intersection of Filbert Street and the on/off ramps of State Route 4 in Stockton, as shown on the approved plans. The preemption system will include the installation of Optical detectors on the traffic signal poles,SR 4, Stockton01/22/20201 (12/05/2017)Details CEM-3701 Report
213900Project ID: 213900
Permit Numbers: 10186RC0212 1019NRD0156 10196RT0567 10196RW0626
10---19.866Construct a commercial driveway located at the intersection of Stagecoach and East Farmington Road/ State Highway 4 in the City of Stockton. Work includes removing existing driveway and culvert, installing new driveway and culverts, installing driveway curb, valley gutter, curb cut, removing traffiSR 4, Stockton11/09/20211 (08/15/2019)Details CEM-3701 Report