Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15901-15910 of 15952 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213182 | Project ID: 213182 DEA: 030C4724 EFIS: 0314000272 | 03-YOL-16-20.5/21.3, 28.2/31.8 | ADD TURN LANES & ROUNDABOUT, ALIGN CURVE, WIDEN SHOULDER, CULVERT WORK | YOLO COUNTY NEAR ESPARTO FROM 0.3 MILE WEST TO 0.4 MILE EAST OF COUNTY ROAD 79 AND FROM 0.1 MILE EAST OF PLAINFIELD STREET TO 0.1 MILE EAST OF COUNTY ROAD 90 | 10/06/2021 | 1 (07/26/2018) | Details Personnel CEM-3701 Report |
215602 | Project ID: 215602 DEA: 031G9904 EFIS: 0320000140 | 03-YOL-16-15.4/19.8 | REPLACE CULVERTS & INSTALL CURED-IN-PLACE PIPELINERS. | YOLO COUNTY NEAR GUINDA AT VARIOUS LOCATIONS FROM 0.3 MILE EAST OF COUNTY ROAD 68 TO 0.3 MILE EAST OF CACHE CREEK CASINO | 06/27/2022 | 1 (03/29/2021) | Details Personnel CEM-3701 Report |
215405 | Project ID: 215405 DEA: 032G1604 EFIS: 0320000235 | 03-YOL-45-0.6/12.9 | COLD PLANE AC PAVEMENT AND REPLACE WITH HOT MIX ASPHALT. | YOLO COUNTY NEAR KNIGHTS LANDING FROM SYCAMORE SLOUGH BRIDGE TO YOLO COUNTY LINE ROAD | 06/30/2021 | 1 (01/18/2021) | Details Personnel CEM-3701 Report |
214800 | Project ID: 214800 DEA: 031G5204 EFIS: 0318000314 | 03-YOL-505-10.0/21.7 | INSTALL EPDM RUBBER PIPE JOINT SEALS & REPLACE CULVERTS. | YOLO COUNTY NEAR MADISON AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF SOUTH FORK WILLOW SLOUGH BRIDGE TO 0.7 MILE SOUTH OF ROUTE 505/5 SEPARATION | 03/16/2021 | 1 (03/24/2020) | Details Personnel CEM-3701 Report |
1201 | Project ID: 1201 DEA: 033M3104 | 03-YOL-505-3.4/17.5 | Overlay Bridge Decks with Methacrylate and Polyester. | YOLO COUNTY NEAR MADISON AT VARIOUS LOCATIONS FROM CHICKAHMNY SLOUGH BRIDGE TO COUNTY ROAD 14 OVERCROSSING | 06/16/2011 | 1 (04/19/2010) | Details Personnel CEM-3701 Report |
214348 | Project ID: 214348 DEA: 033H4604 EFIS: 0318000002 | 03-YOL-16-3.9/4.2 | INSTALL CABLE NET DRAPERY SYSTEM. | YOLO COUNTY NEAR RUMSEY AT 0.1 MILE EAST OF CACHE CREEK BRIDGE | 10/06/2021 | 1 (09/16/2019) | Details Personnel CEM-3701 Report |
214762 | Project ID: 214762 DEA: 031G6104 EFIS: 0319000055 | 03-YOL-16-0.6/15.0 | REPLACE CULVERTS, HEADWALLS AND INSTALL CONCRETE INVERT PAVING. | YOLO COUNTY NEAR RUMSEY AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF COLUSA COUNTY LINE TO 0.1 MILE NORTH OF COUNTY ROAD 68 | 03/16/2021 | 1 (03/24/2020) | Details Personnel CEM-3701 Report |
210298 | Project ID: 210298 DEA: 030G1404 EFIS: 0314000080 | 03-YOL-16-0.0/18.9 | POLYMER ASPHALTIC EMULSION CHIP SEAL | YOLO COUNTY NEAR RUMSEY FROM COLUSA COUNTY LINE TO 0.2 MILE EAST OF ROAD 78 | 10/28/2015 | NOT VERIFIED | Details Personnel CEM-3701 Report |
214788 | Project ID: 214788 DEA: 032H4604 EFIS: 0317000114 | 03-YOL-84-13.3/15.7 | PLACE HMA AND ROADWAY EXCAVATION. | YOLO COUNTY NEAR WEST SACRAMENTO FROM 3.7 MILES NORTH OF CLARKSBURG ROAD TO 4.0 MILES NORTH OF BABEL SLOUGH ROAD | 03/16/2021 | 1 (03/24/2020) | Details Personnel CEM-3701 Report |
909 | Project ID: 909 DEA: 031A9504 | 03-YOL-505-0.7/r22.4 | REPLACE CONCRETE PAVEMENT AND REHABILITATE SHOULDERS AND RAMPS | YOLO COUNTY NEAR WINTERS FROM 0.3 MILE NORTH OF ROUTE 128/505 SEPARATION TO ROUTE 5/505 SEPARATION | 10/14/2011 | 1 (10/14/2011) | Details Personnel CEM-3701 Report |