Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15731-15740 of 17616 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214945 | Project ID: 214945 DEA: 051G1304 EFIS: 0514000110 | 05-SB-1-M29.9/49.2 | COLD PLANE AC PAVEMENT, PLACE RHMA-G & HMA (TYPE A). | SANTA BARBARA COUNTY NEAR SANTA MARIA FROM CALIFORNIA BOULEVARD TO ROUTE 166 | 10/21/2022 | 1 (09/03/2020) | Details CEM-3701 Report |
2817 | Project ID: 2817 DEA: 050Q6504 | 05-SB-101-82.2/84.3 | Construct concrete median barrier, widen shoulders and rumble strip. | SANTA BARBARA COUNTY NEAR SANTA MARIA FROM CLARK AVE OVERCROSSING TO SOUTH SANTA MARIA UNDERCROSSING. | 09/06/2011 | 1 (01/06/2012) | Details CEM-3701 Report |
995176 | Project ID: 995176 DEA: 051H3104 EFIS: 0516000060 | 05-SB-154-R5.7/R6.2 | CONSTRUCT ROUNDABOUT, CURB RAMPS, RUMBLE STRIP AND LIGHTING SYSTEM. | SANTA BARBARA COUNTY NEAR SANTA YNEZ FROM 0.3 MILE EAST OF EDISON STREET/BASELINE AVENUE TO 0.2 MILE WEST OF EDISON STREET/BASELINE AVENUE | 1 (10/02/2023) | Details CEM-3701 Report | |
208979 | Project ID: 208979 DEA: 050T0004 EFIS: 0500000471 | 05-SB-154-R7.8/R8.3 | CONSTRUCT RURAL ROUNDABOUT. | SANTA BARBARA COUNTY NEAR SANTA YNEZ FROM 0.3 MILE NORTH OF ROUTE 246 TO 0.2 MILE SOUTH OF ROUTE 246 | 08/04/2015 | 1 (01/13/2014) | Details CEM-3701 Report |
211365 | Project ID: 211365 DEA: 051C8304 EFIS: 0512000238 | 05-SB-154-R5.9/22.9 | COLD IN-PLACE RECYCLING AND RHMA (GAP GRADED) RESURFACING. | SANTA BARBARA COUNTY NEAR SANTA YNEZ FROM BASELINE AVENUE TO COLD SPRING CANYON BRIDGE | 02/09/2018 | 1 (10/26/2016) | Details CEM-3701 Report |
208617 | Project ID: 208617 DEA: 051A4004 EFIS: 0500020324 | 05-SB-246-31.4/34.6 | RUBBERIZED HMA (GAP GRADED) OVERLAY ON EXISTING ROADWAY. | SANTA BARBARA COUNTY NEAR SOLVANG FROM ENTRANCE ROAD TO ROUTE 154 | 01/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
1856 | Project ID: 1856 DEA: 041A1404 | 04-SCL-130-1.21 | Silver Creek Bridge | Santa Clara | 03/23/2020 | 1 (05/03/2011) | Details CEM-3701 Report |
1000263 | Project ID: 1000263 DEA: 042Y4604 EFIS: 0423000118 | 04-SCL,ALA-680-M8.5/M9.9,M0.0/M0.1 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND OVERLAY WITH RHMA-G. | SANTA CLARA AND ALAMEDA COUNTIES IN MILPITAS AND FREMONT FROM JACKLIN ROAD UNDERCROSSING TO SCOTT CREEK ROAD UNDERCROSSING | 1 (04/15/2024) | Details CEM-3701 Report | |
212786 | Project ID: 212786 DEA: 042537C4 EFIS: 0415000189 | 04-SCL,ALA-680-M7.6/M9.9, M0.0/M1.9 | REPLACEMENT HIGHWAY PLANTING | SANTA CLARA AND ALAMEDA COUNTIES, IN MILPITAS AND FREMONT FROM ROUTE 237 SEPARATION TO EAST WARREN AVENUE UNDERCROSSING | 06/22/2022 | 1 (02/13/2018) | Details CEM-3701 Report |
210381 | Project ID: 210381 DEA: 100W1404 EFIS: 1012000042 | 10-SCL,MER-152-R35.0/R35.0,R0.0/R2.4 | RECONSTRUCT SHOULDERS AND CONSTRUCT MEDIAN BARRIER. | SANTA CLARA AND MERCED COUNTIES ABOUT 16.0 MILES WEST OF LOS BANOS FROM 0.1 MILE EAST OF FIFIELD ROAD TO 0.1 MILE WEST OF VISTA POINT | 04/19/2017 | 1 (08/14/2015) | Details CEM-3701 Report |