Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15661-15670 of 16001 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215132 | Project ID: 215132 DEA: 051M6404 EFIS: 0520000045 | 05-SLO-101-37/46, 37.0-46.0 | Atascadero Slab Replacement - replace JPCP with precast pavement panels (Procast) | US 101 near Atascadero | 08/23/2021 | 1 (08/26/2020) | Details Personnel CEM-3701 Report |
212318 | Project ID: 212318 DEA: 044H4604 EFIS: 0413000210 COOP: 042631 | 04-SM-101-14.5/14.9 | US 101 PENINSULA AVE IN SAN MATEO COUNTY ON ROUTE 101 | 2 (04/05/2017) | Details Personnel CEM-3701 Report | ||
210897 | Project ID: 210897 Permit Numbers: 0514NSN0626 05156DP0590 0516NRW0032 | 05-SB-101-24.79/24.79 | Modify pavement delineation and traffic signals on Storke Road and US Highway 101 southbound on and off ramp intersection to reduce traffic congestion and enhance vehicle and bicycle traffic operation as shown on the attached plans and as directed by the permit provisions in US Highway 101 right of | US 101, goleta | 10/15/2019 | 1 (01/07/2016) | Details Personnel CEM-3701 Report |
993307 | Project ID: 993307 Permit Numbers: 0421NDP2901 | 04---40.4/41 | US-101/ De La Cruz Boulevard interchange improvement.Re-construct the US 10 I /De La Cruz Boulevard/ Trimble Road Interchange to improve traffic operations and connectivity for pedestrians and bicyclists. Work includes:i) Replacement of the existing De La Cruz Boulevard bridge overcrossing with an | US 101/ De La Cruz , San Jose | NOT VERIFIED | Details Personnel CEM-3701 Report | |
993308 | Project ID: 993308 Permit Numbers: 0421NOP2843 | 04---40.4/41 | US-101/ De La Cruz Boulevard interchange improvement. | US 101/ De La Cruz , San Jose | NOT VERIFIED | Details Personnel CEM-3701 Report | |
210439 | Project ID: 210439 DEA: 041G6204 EFIS: 0415000236 COOP: 042578 | 04-SM-101-8.1/8.6 | Improvements to US 101/Holly Street Interchange | US 101/Holly Street Interchange in San Mateo County | 2 (10/26/2015) | Details Personnel CEM-3701 Report | |
213132 | Project ID: 213132 DEA: 03372814 EFIS: 0314000301 Permit Numbers: 0317AOP0994 0318ADP0096 | 03-ED-50-16/16.6 | Western Placerville Interchanges Project Phase 2. Construction of EB auxiliary lane Forni Road, EB off ramp at Ray Lawyer Drive, a storm water detention basin and a signalized intersection at Ray Lawyer Drive. | US 50, Placerville | 07/27/2020 | 2 (02/16/2018) | Details Personnel CEM-3701 Report |
2508 | Project ID: 2508 Permit Numbers: 05086DP0450 | 05-SB-101,217-Various | Install Santa Barbara Airport guide signs. RELATED PERMIT: 05-07-N-MC-0631 | US Highway 101 and State Route 217 | 09/17/2018 | NOT VERIFIED | Details Personnel CEM-3701 Report |
1765 | Project ID: 1765 EFIS: 0000001155 Permit Numbers: 0410NMC0628 | 04-MRN-101-18.6/19.1 | Construction of class 1 bike path 3,200 in length. | US Highway 101, Novato | 01/21/2019 | NOT VERIFIED | Details Personnel CEM-3701 Report |
213884 | Project ID: 213884 DEA: 051F1004 EFIS: 0513000057 Permit Numbers: 0519NOP0704 0520NDP0091 | 05---82.18/-1 | Re-align on and off-ramps at NB interchange. Signalize the intersection, revise pavement delineation and markings on Clark Avenue, minor pavement rehabilitation, guardrail replacement and widening at southbound off-ramp.Construct interchange improvements at US Highway 101 and Clark Avenue accordin | US Highway 101, Orcutt unincorporated | 08/17/2022 | 1 (02/18/2020) | Details Personnel CEM-3701 Report |