Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15521-15530 of 16311 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993434 | Project ID: 993434 Permit Numbers: 02196RP0386 02216DP0288 02216RT0507 | 02---20.93/21.32 | Construct, utilize and maintain a public road connection as additional access to the Salt Creek Heights Subdivision including highway and shoulder widening, curb, gutter, sidewalk, and ADA and drainage improvements. | State Route 299, Redding | 1 (11/30/2021) | Details Personnel CEM-3701 Report | |
211940 | Project ID: 211940 Permit Numbers: 03146SN0400 | 03--32-12.16/12.62 | Widening Roadway. | State Route 32, Chico | 01/08/2019 | 1 (01/20/2017) | Details Personnel CEM-3701 Report |
215439 | Project ID: 215439 Permit Numbers: 03206SN1076 0321ARD0544 03216RT1448 0322ARW0154 | 03---12.273/12.657 | Install signal | State Route 32, Chico | 1 (05/26/2021) | Details Personnel CEM-3701 Report | |
209929 | Project ID: 209929 DEA: 060T0404 EFIS: 0615000007 COOP: 061599 | 06-FRE-33,180-62.2,23.5 | Construct Roundabout | State Route 33 and State Route 180 in the City of Mendota | 2 (01/02/2015) | Details Personnel CEM-3701 Report | |
209660 | Project ID: 209660 DEA: 042J0304 EFIS: 0415000047 COOP: 042540 | 04-CC-4-22.4/27.2 | HIGHWAY PLANTING PROJECT | STATE ROUTE 4 | 09/28/2021 | 1 (09/09/2019) | Details Personnel CEM-3701 Report |
4959 | Project ID: 4959 DEA: 080J0204 | 08-SBD-40-80.42/97.62 | TEMPORARY SHORING UNDER BRIDGE | STATE ROUTE 40, PM 97.62 NEAR ESSEX, SANBERNARDINO COUNTY AT MUSTANG WASH BRIDGE# 54-0893R | 07/29/2010 | 1 (07/29/2010) | Details Personnel CEM-3701 Report |
214187 | Project ID: 214187 Permit Numbers: 0318NSN0541 0319NRW0241 0319NRW0693 0319ARD0967 | 03---2.19 | Widen Combie Rd at the intersection of SR-49 | State Route 49, Auburn | 12/04/2020 | 1 (06/17/2019) | Details Personnel CEM-3701 Report |
5523 | Project ID: 5523 EFIS: 0000001155 Permit Numbers: 1007NLC0798 1007NDP0976 | 10-AMA-49-7.2/10.6 | SR49 Sutter Creek Bypass Landscape TEA Project | State Route 49, Sutter Creek | 02/24/2014 | NOT VERIFIED | Details Personnel CEM-3701 Report |
212631 | Project ID: 212631 Permit Numbers: 09176SN0060 09176DP0135 09176DP0127 | 09--58-94.162/94.162 | Construct roadway improvements and traffic signal modifications as shown on the attached plan set (Pilot Flying J).Notwithstanding General Provision # 4, your contractor is required to apply for and obtain an encroachment permit prior to starting work.A Pre-Construction meeting with the District 9 | State Route 58, Tehachapi | 08/10/2018 | 1 (09/07/2017) | Details Personnel CEM-3701 Report |
5177 | Project ID: 5177 DEA: 08323004 EFIS: 0800000592 Permit Numbers: 0810NMC0120 | 08-RIV--18.1/18.8 | Enter onto State Route 60 right-of-way at Nason Street Interchange in City of Moreno Valley, within Riverside County, to construct interchange and street improvement, as per plans date stamped February 23, 2010 by the Department of Transportation, Distric | State Route 60, Moreno Valley | 07/31/2018 | NOT VERIFIED | Details Personnel CEM-3701 Report |