Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15471-15480 of 17605 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
2995 | Project ID: 2995 MINOR: 05A1359 | 05-SLO--1.4 | Installation of Flashing Beacons and Guard Railing | San Luis Obispo County, Near Atascadero, From 1.4 Miles North of Bear Bridge Road to Cerro Alto Road | 03/18/2020 | 1 (11/11/2019) | Details CEM-3701 Report |
1372 | Project ID: 1372 DEA: 04042244 EFIS: 0400000046 | 04-SM,ALA-92-R14.5/R18.8,R0.0/R2.6 | REPLACE AND UPGRADE EXISTING 12KV ELECTRICAL SWITCHGEAR | SAN MATEO AND ALAMEDA COUNTIES IN FOSTER CITY AND HAYWARD ON THE SAN MATEO-HAYWARD BRIDGE | 11/03/2014 | 1 (05/11/2009) | Details CEM-3701 Report |
210112 | Project ID: 210112 DEA: 041J5204 EFIS: 0414000249 | 04-SM,ALA-84-R28.8/R29.3,R0.5 | INSTALL SIDEWALK, SITE FURNISHINGS, SIGNS, NATIVE PLANTING, IRRIGATION | SAN MATEO AND ALAMEDA COUNTIES IN MENLO PARK AND FREMONT AT PM 29.3 AND PM 0.5 | 10/21/2019 | 1 (09/15/2015) | Details CEM-3701 Report |
1889 | Project ID: 1889 DEA: 041E0204 | 04-SM,SF-1,280-VAR | Treat bridge decks with methacrylate and replace joint seals. | SAN MATEO AND SAN FRANCISCO COUNTIES AT VARIOUS LOCATIONS | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
8003 | Project ID: 8003 DEA: 044A9254 EFIS: 0412000425 | 04-SM,SCL-101,84,101,109,114-6 | INSTALL TRAFFIC SYSTEM INFRASTRUCTURE. | SAN MATEO AND SANTA CLARA COUNTIES AT VARIOUS LOCATIONS | 08/07/2018 | 1 (12/10/2012) | Details CEM-3701 Report |
7341 | Project ID: 7341 DEA: 042E5504 EFIS: 0400021090 COOP: 040497 | 04-SM,SCL-35-0.0/21.0 | PLACE ASPHALT-RUBBER SEAL COAT. | SAN MATEO AND SANTA CLARA COUNTIES IN AND NEAR PALO ALTO AND WOODSIDE FROM SANTA CLARA COUNTY LINE TO 2 MILES SOUTH OF SOUTH JUNCTION ROUTE 92 | 06/21/2013 | 1 (07/19/2012) | Details CEM-3701 Report |
210371 | Project ID: 210371 DEA: 042J7104 | 04-SM,SCL-35-0.0/21.0 | RESURFACE ROADWAY WITH SAND COVER (SEAL). | SAN MATEO AND SANTA CLARA COUNTIES IN AND NEAR PALO ALTO AND WOODSIDE FROM SANTA CLARA COUNTY LINE TO 2 MILES SOUTH OF SOUTH JUNCTION ROUTE 92 | 12/27/2017 | 1 (05/27/2015) | Details CEM-3701 Report |
2133 | Project ID: 2133 DEA: 042A5424 | 04-SM,SCL-280,35-Var | UPGRADING VISTA POINT FOR ADA COMPLIANCE. | SAN MATEO AND SANTA CLARA COUNTIES ON VARIOUS FREEWAYS AT VARIOUS LOCATIONS | 06/08/2011 | 1 (04/26/2011) | Details CEM-3701 Report |
210527 | Project ID: 210527 DEA: 041G8504 EFIS: 0400020617 | 04-SM,SOL-92,780-varies | INSTALL MIDWEST GUARDRAIL SYSTEM. | SAN MATEO AND SOLANO COUNTIES AT VARIOUS LOCATIONS | 12/27/2017 | 1 (09/15/2015) | Details CEM-3701 Report |
208584 | Project ID: 208584 DEA: 04041004 EFIS: 0400000044 | 04-SM,ALA-92-R14.4/R18.8,R0.0/R2.6 | Polyester Concrete Overlay. | San Mateo Bridge 04-SM,Ala-92-R14.4/R18.8,R0.0/R2.6 | 12/22/2016 | 1 (02/06/2013) | Details CEM-3701 Report |