Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15261-15270 of 17771 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215522 | Project ID: 215522 DEA: 112N0994 EFIS: 1121000028 | 11-SD-8-R32.0/R44.0 | REPLACE INDIVIDUAL SLABS AND JOINT SEAL, COLD PLANE AND PAVE WITH HMA. | SAN DIEGO COUNTY NEAR ALPINE FROM 0.2 MILE EAST OF VIEJAS CREEK BRIDGE TO 0.9 MILE WEST OF SUNRISE HIGHWAY OVERCROSSING | 08/02/2022 | 1 (06/03/2021) | Details CEM-3701 Report |
6263 | Project ID: 6263 DEA: 112M0804 | 11-SD-8-R31.8/R39.7 | Replace concrete slabs, grind pavement, and replace shoulders. | SAN DIEGO COUNTY NEAR ALPINE FROM VIEJAS CREEK BRIDGE TO HORSETHIEF CREEK UNDERCROSSING | 04/21/2011 | 1 (10/26/2011) | Details CEM-3701 Report |
993318 | Project ID: 993318 DEA: 11423704 EFIS: 1116000059 | 11-SD-8-R31.8/R41.7 | PLACE CRCP, HMA, MGS, AND WATER POLLUTION CONTROL SYSTEM. | SAN DIEGO COUNTY NEAR ALPINE FROM VIEJAS CREEK BRIDGE TO PINE VALLEY CREEK BRIDGE | 1 (10/27/2021) | Details CEM-3701 Report | |
209503 | Project ID: 209503 DEA: 11257154 EFIS: 1100020489 | 11-SD-76,15-R46.2/R46.8, R12.1/R17.7 | CONSTRUCT 4 LANE HIGHWAY. | SAN DIEGO COUNTY NEAR BONSALL AND FALLBROOK ON ROUTE 15 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 76/15 SEPARATION AND ON ROUTE 76 FROM 0.4 MILE WEST OF SOUTH MISSION ROAD TO 0.5 MILE EAST OF ROUTE 76/15 SEPARATION | 08/16/2021 | 1 (08/25/2014) | Details CEM-3701 Report |
213239 | Project ID: 213239 DEA: 11257164 | 11-SD-15,76-R46.2/R46.8R12.1/R17.1 | ESTABLISH EXISTING PLANTING AND EROSION CONTROL, AND HYDROSEEDING. | SAN DIEGO COUNTY NEAR BONSALL AND FALLBROOK ON ROUTE 15 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF THE ROUTE 76/15 SEPARATION AND ON ROUTE 76 FROM 0.4 MILE WEST OF SOUTH MISSION ROAD TO 0.5 MILE EAST OF ROUTE 76/15 SEPARATION | 09/12/2023 | 1 (06/16/2020) | Details CEM-3701 Report |
7415 | Project ID: 7415 DEA: 11257144 EFIS: 1100020469 | 11-SD-15,76-R46.1/R47.3,R16.7/R17.7 | MODIFY AND WIDEN INTERCHANGE. | SAN DIEGO COUNTY NEAR BONSALL AND FALLBROOK ON ROUTE 15 FROM 0.4 MILE SOUTH TO 0.8 MILE NORTH OF ROUTE 76/15 SEPARATION AND ON ROUTE 76 FROM 0.5 MILE WEST TO 0.5 MILE EAST OF ROUTE 76/15 SEPARATION | 08/22/2018 | 1 (09/11/2012) | Details CEM-3701 Report |
210014 | Project ID: 210014 DEA: 11407004 EFIS: 1100020392 | 11-SD-105,170-R61.2/R77.8 | COLD PLANE, RHMA OVERLAY, AND REPLACE APPROACH SLABS. | SAN DIEGO COUNTY NEAR BOULEVARD AND JACUMBA FROM 0.1 MILE EAST OF CRESTWOOD ROAD UNDERCROSSING TO THE IMPERIAL COUNTY LINE | 09/07/2018 | 1 (04/08/2015) | Details CEM-3701 Report |
994616 | Project ID: 994616 DEA: 112N1654 EFIS: 1122000152 | 11-SD-8-R61.0/R68.0 | PLACE RHMA-G(BWC) OVERLAY, PAVEMENT MARKING, & RUMBLE STRIP. | SAN DIEGO COUNTY NEAR BOULEVARD FROM 0.1 MILE WEST OF CRESTWOOD ROAD UNDERCROSSING TO 0.2 MILE EAST OF MCCAIN VALLEY ROAD UNDERCROSSING | 06/11/2024 | 1 (07/18/2023) | Details CEM-3701 Report |
211971 | Project ID: 211971 DEA: 11409004 EFIS: 1112000042 | 11-SD-94-46.9,R58.9 | UPGRADE BRIDGE RAILS AND GUARDRAILS. | SAN DIEGO COUNTY NEAR CAMPO AT CAMPO CREEK BRIDGE (57-0118) AND AT CAMPO CREEK BRIDGE (57-0686) | 08/16/2021 | 1 (06/05/2017) | Details CEM-3701 Report |
7132 | Project ID: 7132 DEA: 112M2004 EFIS: 1100020098 | 11-SD-79-L0.3/10.0 | COLD PLANE AND RHMA-G OVERLAY, REPLACE CONCRETE PAVEMENT. | SAN DIEGO COUNTY NEAR DESCANSO FROM 0.3 MILE NORTH OF ROUTE 8/79 SEPARATION TO 0.7 MILE NORTH OF PASO PICACHO CAMPGROUND | 12/05/2012 | 1 (06/21/2012) | Details CEM-3701 Report |