Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15151-15160 of 17362 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993262Project ID: 993262
Permit Numbers: 04216DP2468
04-ALA-112-1.6New traffic signal poles, PG&E service, and striping will be installed at the intersection of Davis St. and Carpentier St. in San Leandro, CA.San Leandro at the intersection of Davis St. and Carpentier St. on SR 112.10/14/20221 (09/15/2021)Details CEM-3701 Report
212550Project ID: 212550
DEA: 044H0104
EFIS: 0413000132
04-ALA-880-20.9/22.1ROADSIDE SLOPE AREA PAVINGSAN LEANDRO BETWEEN WASHINGTON AVENUE AND MARIANA BOULEVARD OVERCROSSING10/21/20191 (01/10/2018)Details CEM-3701 Report
2992Project ID: 2992
DEA: 05929974
EFIS: 0500000670
05-SLO--Pacacheo Road Bridge Replacement in Cayucos, CASan Luis Obispo08/27/2019NOT VERIFIEDDetails CEM-3701 Report
2878Project ID: 2878
DEA: 050S3804
05-SLO,MON-101-63.5/R69.3,R0.0/R2.0GRIND AND REPLACE SHOULDERS AND RUMBLE STRIP.SAN LUIS OBISPO AND MONTEREY COUNTIES AT AND NEAR SAN MIGUEL FROM SAN MARCOS CREEK BRIDGE TO 0.1 MILE SOUTH OF EAST GARRISON OVERCROSSING08/29/20121 (09/07/2012)Details CEM-3701 Report
212974Project ID: 212974
DEA: 051J7404
EFIS: 0518000038
05-SLO,MON-101-0.8/69.3,R0.0/R32.0REMOVE TRAFFIC STRIPE AND PLACE 6" TRAFFIC STRIPE.SAN LUIS OBISPO AND MONTEREY COUNTIES FROM ROUTE 101/166 SEPARATION TO ROUTE 101/198 SEPARATION08/20/2018NOT VERIFIEDDetails CEM-3701 Report
214253Project ID: 214253
DEA: 051J0404
EFIS: 0517000054
05-SLO,MON-46,101-49.5,R3.1/R5.2INSTALL ELECTRIC VEHICLE CHARGING STATIONS.SAN LUIS OBISPO AND MONTEREY COUNTIES ON ROUTE 46 AT SHANDON SAFETY ROADSIDE REST AREA AND ON ROUTE 101 AT CAMP ROBERTS SAFETY ROADSIDE REST AREAS09/25/20201 (09/06/2019)Details CEM-3701 Report
211616Project ID: 211616
DEA: 050G0404
EFIS: 0500020020
05-SLO,MON-101-63.2/R69.3,R0.0/R1.9ROADWAY REHABILITATION AND BRIDGE CONSTRUCTION.SAN LUIS OBISPO AND MONTERY COUNTIES NEAR PASO ROBLES FROM 0.5 MILE SOUTH OF SAN MARCOS CREEK BRIDGE TO 0.2 MILE SOUTH OF BRADLEY ROAD OVERCROSSING10/29/20201 (09/15/2016)Details CEM-3701 Report
214389Project ID: 214389
DEA: 051G3004
EFIS: 0514000138
05-SLO,SB-1,33,41,58,101,etc.-VariousFURNISH AND INSTALL ROADSIDE SIGNS.SAN LUIS OBISPO AND SANTA BARBARA COUNTIES AT VARIOUS LOCATIONS08/23/20211 (09/06/2019)Details CEM-3701 Report
2870Project ID: 2870
DEA: 050S1804
05-SLO-41-41.2/43.8Overlay existing roadway with Rubberized HMA.SAN LUIS OBISPO AT SHANDON FROM WEST CENTRE STREET TO WEST JUNCTION ROUTE 4604/20/20111 (04/20/2011)Details CEM-3701 Report
1000099Project ID: 1000099
DEA: 051Q4704
05-SLO-58-51.0/57.2PARTIAL DEPTH RECYCLING AND OVERLAY WITH RHMA-G.SAN LUIS OBISPO COUNTY ABOUT 16 MILES WEST OF MCKITTRICK FROM 0.3 MILE EAST OF BOULDER CREEK ROAD TO KERN COUNTY LINE. 1 (02/12/2024)Details CEM-3701 Report