Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15131-15140 of 16311 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1611 | Project ID: 1611 DEA: 040A5324 EFIS: 0400000152 | 04-SOL-80-11.4/20.1 | RAMP METERING AND WEIGH-IN-MOTION SYSTEM | SOLANO COUNTY IN FAIRFIELD AT VARIOUS LOCATIONS FROM RED TOP ROAD UNDERCROSSING TO 0.9 MILE EAST OF AIR BASE PARKWAY OVERCROSSING. | 08/29/2012 | 1 (06/01/2011) | Details Personnel CEM-3701 Report |
211364 | Project ID: 211364 DEA: 044J6304 EFIS: 0415000375 | 04-SOL-80-17.2 | BUILD MATERIALS STORAGE BINS WITH CANOPY. | SOLANO COUNTY IN FAIRFIELD MAINTENANCE STATION 2019 WEST TEXAS STREET | 12/21/2017 | 1 (08/24/2016) | Details Personnel CEM-3701 Report |
211387 | Project ID: 211387 DEA: 043J4404 | 04-SOL-12-R23.5/25.5 | HM 1 - COLD PLANE ASPHALT CONCRETE PAVEMENT AND RHMA OVERLAY. | SOLANO COUNTY IN RIO VISTA FROM 0.3 MILE WEST OF SUMMERSET ROAD TO 0.7 MILE EAST OF CHURCH ROAD / AMERADA ROAD | 08/22/2018 | NOT VERIFIED | Details Personnel CEM-3701 Report |
7545 | Project ID: 7545 DEA: 044A0104 EFIS: 0400001101 | 04-SOL-80-30.6/38.7 | REPLACE EXIST CONC PVMT, HMA SURFACING AND UPGRADE MBGR. | SOLANO COUNTY IN VACAVILLE AND DIXON FROM 0.6 MILE EAST OF LEISURE TOWN ROAD OVERCROSSING TO 1.0 MILE WEST OF PEDRICK ROAD OVERCROSSING. | 02/17/2015 | 1 (10/01/2012) | Details Personnel CEM-3701 Report |
213249 | Project ID: 213249 DEA: 043K6704 EFIS: 0417000192 | 04-SOL-505-R0.0/R10.6 | COLD PLANE AC PAVEMENT AND OVERLAY WITH RHMA-G (BWC). | SOLANO COUNTY IN VACAVILLE FROM 505/80 SEPARATION TO YOLO COUNTY LINE | 06/06/2019 | 1 (04/02/2018) | Details Personnel CEM-3701 Report |
1745 | Project ID: 1745 DEA: 040T1454 EFIS: 0400000361 | 04-SOL-29,37-4.7/5.1,7.2/10.5 | Perform Highway Planting And Install Irrigation Systems. | SOLANO COUNTY IN VALLEJO AT ROUTE 37/29 SEPARATION AND ON ROUTE 37 FROM NAPA RIVER BRIDGE TO DIABLO STREET | 04/20/2014 | 1 (12/14/2009) | Details Personnel CEM-3701 Report |
215396 | Project ID: 215396 DEA: 042K8404 EFIS: 0417000031 | 04-SOL-29,80-0.0,0.8/1.6 | HMA, STRUCTURAL CONCRETE, CIDH PILING AND REBAR. | SOLANO COUNTY IN VALLEJO AT ROUTE 80/29 SEPARATION AND ON ROUTE 80 FROM 0.2 MILE NORTH OF CARQUINEZ BRIDGE TOLL PLAZA TO 0.3 MILE SOUTH OF MAGAZINE STREET OVERCROSSING | 1 (01/25/2021) | Details Personnel CEM-3701 Report | |
214562 | Project ID: 214562 DEA: 040J7104 EFIS: 0414000029 | 04-SOL-80-1.8/4.4 | RAISE BRIDGE AND PLACE STRUCTURAL CONCRETE. | SOLANO COUNTY IN VALLEJO AT VARIOUS LOCATIONS | 1 (12/03/2019) | Details Personnel CEM-3701 Report | |
211555 | Project ID: 211555 DEA: 044G5524 EFIS: 0415000087 | 04-SOL-29-0.8/3.0 | CROSSWALK ENHANCEMENTS | SOLANO COUNTY IN VALLEJO AT VARIOUS LOCATIONS BETWEEN CHERRY STREET AND ILLINOIS STREET | 08/07/2018 | 1 (10/27/2016) | Details Personnel CEM-3701 Report |
209482 | Project ID: 209482 DEA: 041A2604 EFIS: 0400000480 | 04-SOL-80-4.0/4.3 | UPGRADE DRAINAGE SYSTEMS. | SOLANO COUNTY IN VALLEJO FROM 0.70 MILE EAST OF TENNESSEE STREET OVERCROSSING TO 0.20 MILE WEST OF REDWOOD STREET OVERCROSSING.. | 02/12/2015 | 1 (06/20/2014) | Details Personnel CEM-3701 Report |