Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15071-15080 of 17257 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
211616Project ID: 211616
DEA: 050G0404
EFIS: 0500020020
05-SLO,MON-101-63.2/R69.3,R0.0/R1.9ROADWAY REHABILITATION AND BRIDGE CONSTRUCTION.SAN LUIS OBISPO AND MONTERY COUNTIES NEAR PASO ROBLES FROM 0.5 MILE SOUTH OF SAN MARCOS CREEK BRIDGE TO 0.2 MILE SOUTH OF BRADLEY ROAD OVERCROSSING10/29/20201 (09/15/2016)Details CEM-3701 Report
214389Project ID: 214389
DEA: 051G3004
EFIS: 0514000138
05-SLO,SB-1,33,41,58,101,etc.-VariousFURNISH AND INSTALL ROADSIDE SIGNS.SAN LUIS OBISPO AND SANTA BARBARA COUNTIES AT VARIOUS LOCATIONS08/23/20211 (09/06/2019)Details CEM-3701 Report
2870Project ID: 2870
DEA: 050S1804
05-SLO-41-41.2/43.8Overlay existing roadway with Rubberized HMA.SAN LUIS OBISPO AT SHANDON FROM WEST CENTRE STREET TO WEST JUNCTION ROUTE 4604/20/20111 (04/20/2011)Details CEM-3701 Report
1000099Project ID: 1000099
DEA: 051Q4704
05-SLO-58-51.0/57.2PARTIAL DEPTH RECYCLING AND OVERLAY WITH RHMA-G.SAN LUIS OBISPO COUNTY ABOUT 16 MILES WEST OF MCKITTRICK FROM 0.3 MILE EAST OF BOULDER CREEK ROAD TO KERN COUNTY LINE. 1 (02/12/2024)Details CEM-3701 Report
209871Project ID: 209871
DEA: 051A7004
EFIS: 0512000009
05-SLO-1-73.7/74.0CONSTRUCT SOLDIER PILE RETAINING WALLSAN LUIS OBISPO COUNTY ABOUT 19 MILES NORTH OF SAN SIMEON FROM 0.7 MILES TO 1.0 MILE NORTH OF RAGGED POINT VIADUCT02/01/20181 (01/30/2015)Details CEM-3701 Report
213768Project ID: 213768
DEA: 051J2704
EFIS: 0517000078
05-SLO-1-22.6/25.7COLD PLANE AND OVERLAY EXISTING NORTHBOUND LANES WITH RHMA-OSAN LUIS OBISPO COUNTY ABOUT 2 MILES SOUTH OF MORRO BAY FROM EDUCATION DRIVE TO SAN LUISITO CREEK BRIDGE08/20/20191 (08/20/2019)Details CEM-3701 Report
2872Project ID: 2872
DEA: 050S2004
05-SLO-41-43.9/49.6Cold plane and place HMA on existing roadway.SAN LUIS OBISPO COUNTY ABOUT 25 MILES EAST OF PASO ROBLES FROM EAST JUNCTION ROUTE 46 TO 5.7 MILE NORTH OF EAST JUNCTION ROUTE 4604/20/20111 (04/20/2011)Details CEM-3701 Report
208619Project ID: 208619
DEA: 051F0104
EFIS: 0513000035
05-SLO-166-35.0/44.0COLD IN-PLACE RECYCLING AND OVERLAY WITH HOT MIX ASPHALT (TYPE A).SAN LUIS OBISPO COUNTY ABOUT 25 MILES EAST OF SANTA MARIA FROM CUYAMA RIVER BRIDGE TO 0.3 MILE WEST OF CARRIZO CANYON BRIDGE08/21/20181 (10/02/2013)Details CEM-3701 Report
7499Project ID: 7499
DEA: 050R3004
EFIS: 0500000355
05-SLO-166-39.9/40.3CONSTRUCT NEW BRIDGE, REMOVE EXISTING BRIDGE AND REALIGN ROADWAYSAN LUIS OBISPO COUNTY ABOUT 25 MILES WEST OF NEW CUYAMA FROM 1.6 MILES EAST OF CUYAMA RIVER BRIDGE TO 4.0 MILES WEST OF CARRIZO CREEK BRIDGE08/04/20151 (11/15/2012)Details CEM-3701 Report
212269Project ID: 212269
DEA: 051H3004
05-SLO-41-43.9/50.4CONSTRUCT CENTERLINE AND EDGE LINE RUMBLE STRIP.SAN LUIS OBISPO COUNTY ABOUT 30 MILES EAST OF PASO ROBLES FROM ROUTE 46 TO THE KERN COUNTY LINE08/22/2018NOT VERIFIEDDetails CEM-3701 Report