Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14981-14990 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993317 | Project ID: 993317 DEA: 11264104 EFIS: 1116000045 | 11-SD-8-2.2 | REPLACE BRIDGE PORTIONS & PLACE STRUCTURAL CONCRETE BRIDGE & BARRIER. | SAN DIEGO COUNTY IN SAN DIEGO AT E8-S163 CONNECTOR OVERCROSSING | 09/14/2023 | 1 (10/27/2021) | Details CEM-3701 Report |
6011 | Project ID: 6011 DEA: 110AA024 | 11-SD-5505- | INSTALLATION OF PHOTOVOLTAIC PANELS | SAN DIEGO COUNTY IN SAN DIEGO AT KEARNEY MESA EQUIPMENT SHOP 11 AT 7179 OPPORTUNITY ROAD | 04/12/2011 | 1 (07/06/2010) | Details CEM-3701 Report |
6010 | Project ID: 6010 DEA: 110AA014 | 11-SD-5722- | Installation of Photovoltaic Panels | SAN DIEGO COUNTY IN SAN DIEGO AT KEARNY MESA MAINTENANCE STATION AT 7181 OPPORTUNITY ROAD | 11/22/2010 | 1 (03/01/2010) | Details CEM-3701 Report |
6012 | Project ID: 6012 DEA: 110AA034 | 11-SD-5530- | INSTALLATION OF PHOTOVOLTAIC PANELS | SAN DIEGO COUNTY IN SAN DIEGO AT KEARNY MESA TRANSPORTATION MANAGEMENT CENTER AT 7183 OPPORTUNITY ROAD | 03/02/2012 | 1 (06/30/2011) | Details CEM-3701 Report |
212648 | Project ID: 212648 DEA: 11414404 EFIS: 1114000023 | 11-SD-94-5.8-9.3 | UPGRADE BRIDGE RAILS, INSTALL SIDEWALK, AND UPGRADE CURB RAMPS. | SAN DIEGO COUNTY IN SAN DIEGO AT KELTON ROAD OVERCROSSING AND IN LEMON GROVE AT GROVE STREET OVERCROSSING | 12/09/2019 | 1 (03/01/2018) | Details CEM-3701 Report |
208736 | Project ID: 208736 DEA: 11264114 EFIS: 1100000225 | 11-SD-163-1.4 | BRIDGE SEISMIC RETROFIT. | SAN DIEGO COUNTY IN SAN DIEGO AT LAUREL STREET BRIDGE OVERCROSSING. | 07/07/2015 | 1 (01/08/2014) | Details CEM-3701 Report |
994170 | Project ID: 994170 DEA: 113A5174 EFIS: 1122000108 MINOR: 11A3428 | 11-SD-805-20.69 | Active Transportation Project - Bike Lane Striping | San Diego County in San Diego at Linda Vista Road Overcrossing (Bridge No. 57-0681) | 1 (08/26/2022) | Details CEM-3701 Report | |
6196 | Project ID: 6196 DEA: 11286604 | 11-SD-8-L1.2 | MODIFY INTERSECTION. | SAN DIEGO COUNTY IN SAN DIEGO AT MIDWAY DRIVE UNDERCROSSING | 05/17/2011 | 1 (10/26/2011) | Details CEM-3701 Report |
993577 | Project ID: 993577 DEA: 112N0854 EFIS: 1119000218 | 11-SD-805-18.9,21.7 | APPLY METHACRYLATE ON BRIDGE DECK, PLACE OVERLAY AND RESURFACE DECK. | SAN DIEGO COUNTY IN SAN DIEGO AT MURRAY RIDGE ROAD OVERCROSSING AND AT BALBOA AVENUE OVERCROSSING | 09/14/2023 | 1 (03/07/2022) | Details CEM-3701 Report |
6372 | Project ID: 6372 DEA: 11401704 | 11-SD-163-0.9 | RAMP REHABILITATION. | SAN DIEGO COUNTY IN SAN DIEGO AT ROUTE 5/163 SEPARATION | 03/08/2011 | 1 (10/26/2011) | Details CEM-3701 Report |