Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14921-14930 of 15895 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
212923Project ID: 212923
Permit Numbers: 1016NMC0531 1017NRT0598
10---18.6Install and maintain in perpetuity the Emergency Vehicle Preemption System at the intersection of Filbert Street and the on/off ramps of State Route 4 in Stockton, as shown on the approved plans. The preemption system will include the installation of Optical detectors on the traffic signal poles,SR 4, Stockton01/22/20201 (12/05/2017)Details Personnel CEM-3701 Report
213900Project ID: 213900
Permit Numbers: 10186RC0212 1019NRD0156 10196RT0567 10196RW0626
10---19.866Construct a commercial driveway located at the intersection of Stagecoach and East Farmington Road/ State Highway 4 in the City of Stockton. Work includes removing existing driveway and culvert, installing new driveway and culverts, installing driveway curb, valley gutter, curb cut, removing traffiSR 4, Stockton11/09/20211 (08/15/2019)Details Personnel CEM-3701 Report
993216Project ID: 993216
Permit Numbers: 10206MC0848 1021NRD0810 10226RT0042
10---15.078Improve State Highway 4 right of way located at the intersection of Fresno Avenue in the City of Stockton. Work includes pavement widening, new and improve pedestrian facilities, replacing existing pork chop divider, construction of new curb ramps, traffic signal modifications, drainage improvementSR 4, Stockton08/29/20221 (08/25/2021)Details Personnel CEM-3701 Report
215737Project ID: 215737
Permit Numbers: 0418NOP1441 0420NRT2951 0420NRT2952
04---11.2/15.5The project proposes widening the inside median of SR4 in both directions from east of Milano Way/Glacier Drive to east of SR242.Widen State Route 4 from inside median in both direction from east of Milano/Glacier Drive to State Route 242, outside widening of State Route 4 of both directions from PSR 4/680 Interchange and SR4 widening , Martinez and Concord NOT VERIFIEDDetails Personnel CEM-3701 Report
211078Project ID: 211078
DEA: 060U2604
EFIS: 0615000267
Permit Numbers: 0614AOP0910
06-FRE-41-3.0/3.2Riverstone Village Development Project: Riverstone Village, as part of its residential development proposes to construct a second left turn pocket on northbound State Route 41 at Avenue 12. Improvements include a median and striped bicycle lane between the thru and right turn lanes. Additionally, AvSR 41 & Avenue 1210/30/20172 (02/23/2016)Details Personnel CEM-3701 Report
3354Project ID: 3354
DEA: 060M0904
06-KER-41-0.3SLIDE REMOVAL & SLOPE STABILIZATIONSR 41 0.3 MILES EAST OF KERN/SLO COUNTY LINE. SLIDE REMOVAL & SLOPE STABILIZATION **DIRIECTORS ORDER**11/04/20111 (11/04/2011)Details Personnel CEM-3701 Report
210136Project ID: 210136
DEA: 060T3204
EFIS: 0615000062
COOP: 061607
06-FRE-41-23.1/23.5CONSTRUCT AUXILIARY LANE ON SB 41 DISTRICT 06-1657SR 41 FROM O STREET TO TULARE AVENUE12/07/20181 (02/05/2015)Details Personnel CEM-3701 Report
213271Project ID: 213271
DEA: 101J6804
10-MPA-49-31.0/R34.6Slipout Repair at Multiple locationsSR 49 in Mariposa County post mile 31.0/R34.6 1 (07/22/2019)Details Personnel CEM-3701 Report
210284Project ID: 210284
Permit Numbers: 10136MC0280 10156RW0096
10-CAL-49-7.68/7.92Replace five wooden street light poles with 14? Charleston Style 5? extruded aluminum street light poles. The street lights are located along east side of State Highway 49 between Bret Hart Road and Mark Twain Road in the City of Angels Camp. All working schedule shall be per attached Traffic WindoSR 49, Angels Camp04/27/2018NOT VERIFIEDDetails Personnel CEM-3701 Report
214016Project ID: 214016
Permit Numbers: 10176SN0297 10196DP0239 10196RT0412 10196RT0868 10196RW0869 10196RT0870 10206RW0024 10206RT0557
10---8.06Install new signal at the intersection of Stanislaus Avenue and State Highway 49 in the City of Angels Camp in Calaveras County. Work also includes reconstruction of curb return, curb ramps, signing, and pavement delineation. All work shall conform to the approved plans and special provisions per CSR 49, Angels Camp10/28/20211 (03/12/2019)Details Personnel CEM-3701 Report