Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14731-14740 of 18125 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
819 | Project ID: 819 DEA: 030C7704 | 03-PLA-80-R106.4/110.3 | Overlay concrete roadway, improve drainage and rehab bridge deck. | Rte. 80 | 01/20/2010 | 1 (01/20/2010) | Details CEM-3701 Report |
209606 | Project ID: 209606 Permit Numbers: 0312NSN0282 | 03-YOL-113-1.1/1.1 | 1. EV, Bike, and Ped surface improvements with a bike circle2. relocation/replacement of path lighting within footprint3. traffic signal modification - limited to resetting the bike push button and det. loop on south leg and addition of EV preemption devices | Russell Blvd, Davis | 04/27/2018 | 1 (05/20/2014) | Details CEM-3701 Report |
214172 | Project ID: 214172 Permit Numbers: 0417NMC1910 04196DP0966 | 04-SM-82-9.35/10.07 | The Peninsula Corridor Joint Powers Board (JPB), which operates the San Francisco Bay Area's Caltrain passenger rail intends to extend 28th Avenue and 31st Avenue west of El Camino Real (SR 82) in the same location as existing driveway access points... | S. El Camino Real, San Mateo | 03/16/2021 | 1 (05/22/2019) | Details CEM-3701 Report |
993207 | Project ID: 993207 Permit Numbers: 04196SN2825 04206RT1409 04206RT2992 04216RT2271 04226RT0050 | 04---18.24 | Install two new traffic signals; one at the intersection of S. First Street and Chestnut Street and the other at the intersection of S. First Street and Valley Glen Drive; the S. First Street and Chestnut Street intersection include ADA ramp, crosswalk, drainage and asphalt updates on State Highway | S. First Street, Dixon | 10/14/2022 | 1 (10/22/2021) | Details CEM-3701 Report |
4247 | Project ID: 4247 DEA: 073X6204 | 07-LA-60-29.5 | Repair Maintenance Station Bldg | S. Garey Ave. in City of Pomona | 10/11/2012 | 1 (10/11/2012) | Details CEM-3701 Report |
215696 | Project ID: 215696 Permit Numbers: 07206SN2586 | 07-VEN-- | New crosswalk and traffic signal modification | S. VENTURA AVENUE & THOMPSON BOULEVARD | 1 (04/13/2021) | Details CEM-3701 Report | |
6833 | Project ID: 6833 DEA: 12A12314 | 12-ORA-57-17.5 | Remove HOV Buffer Stripe & Install HOV Ingress/Egress Stripe | S/B SR-57 HOV Lane | 08/05/2010 | 1 (08/05/2010) | Details CEM-3701 Report |
6756 | Project ID: 6756 DEA: 120K3804 | 12-ORA-57-17.5 | HOV Lane REMOVE HOV BUFFER STRIPE AND INSTALL HOV INGRESS/EGRESS STRIPE | S/B SR-57 HOV LANE FROM ROLLING HILLS DR. UC TO NUTWOOD AVE. UC IN THE CITY OF FULLERTON | 08/05/2010 | 1 (08/05/2010) | Details CEM-3701 Report |
215738 | Project ID: 215738 DEA: 042Q8304 EFIS: 0419000056 COOP: 042803 | 04-ALA-680-4.8/5.0 | Improvements to the State Highway System | Sabercat Bridge and Trail connecting Ohlone College on the east side to future BART Station at Washington/Osgood and Blacow Road on the west, with a bicycle and pedestrian bridge over I-680 | 2 (09/07/2021) | Details CEM-3701 Report | |
209319 | Project ID: 209319 DEA: 032F9404 EFIS: 0312000038 Permit Numbers: 0312NSN0800 0314NRT0089 0313NDP0775 | 03-SAC-99-33/34 | Traffic signal insallation, intersection and pedestrian improvements | Sac 99, Sacramento | 02/06/2015 | 2 (02/14/2014) | Details CEM-3701 Report |