Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14661-14670 of 17616 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
211918 | Project ID: 211918 DEA: 081E0804 EFIS: 0813000142 | 08-SBD-18-88.9/89.6 | CONSTRUCT RAISED-CURB MEDIAN | SAN BERNARDINO COUNTY IN APPLE VALLEY FROM NAVAJO ROAD TO KIOWA ROAD | 08/09/2018 | NOT VERIFIED | Details CEM-3701 Report |
215039 | Project ID: 215039 DEA: 081H4004 EFIS: 0817000031 | 08-SBD-40-0.4 | MINOR CONCRETE (MINOR STRUCTURE). | SAN BERNARDINO COUNTY IN BARSTOW AT 0.4 MILE EAST OF ROUTE 15 | 06/30/2021 | 1 (10/21/2020) | Details CEM-3701 Report |
5093 | Project ID: 5093 DEA: 080M5004 | 08-SBD-40-S0.0/S0.8 | COLD PLANE AND PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | SAN BERNARDINO COUNTY IN BARSTOW FROM 0.2 MILE WEST OF MAIN STREET OVERCROSSING TO EAST MAIN STREET | 10/28/2011 | 1 (10/28/2011) | Details CEM-3701 Report |
210379 | Project ID: 210379 DEA: 081F5304 EFIS: 0814000244 | 08-SBD-15-70.1/75.3 | REHABILITATE PAVEMENT, FOG SEAL SHOULDERS | SAN BERNARDINO COUNTY IN BARSTOW FROM ROUTE 58 TO 0.2 MILE NORTHEAST OF RIVERSIDE DRIVE | 06/13/2016 | 1 (10/15/2015) | Details CEM-3701 Report |
213105 | Project ID: 213105 DEA: 080R4314 | 08-SBD-38-50.4/59.4 | ROUTE 38 SEDIMENT CONTROLS WITH HYDROMULCH & GRAVEL (PHASE 1) | SAN BERNARDINO COUNTY IN BIG BEAR LAKE AT VARIOUS LOCATIONS FROM NORTH DIVISION DRIVE TO ROUTE 18 | 02/22/2019 | 1 (04/09/2018) | Details CEM-3701 Report |
5076 | Project ID: 5076 DEA: 080M0204 EFIS: 800000454 | 08-SBD-5712- | CONSTRUCT COMPRESSED NATURAL GAS (CNG) FUELING STATION. | SAN BERNARDINO COUNTY IN BLOOMINGTON AT MAGANA-ORTEGA MAINTENANCE STATION | 05/29/2014 | 1 (05/09/2011) | Details CEM-3701 Report |
211904 | Project ID: 211904 DEA: 081C6004 | 08-SBD-71-R6.9/R7.8 | SEDIMENT STABILIZATION, EROSION CONTROL | SAN BERNARDINO COUNTY IN CHINO AND CHINO HILLS FROM 0.4 MILE SOUTH OF PINE AVENUE TO 0.2 MILE NORTH OF EUCLID AVENUE | 01/06/2020 | 1 (01/07/2019) | Details CEM-3701 Report |
994215 | Project ID: 994215 DEA: 081K7904 EFIS: 0819000103 | 08-SBD-83-5.9/11.1 | MODIFYING SIGNAL AND LIGHTING SYSTEMS, TRAFFIC STRIPING AND MARKINGS. | SAN BERNARDINO COUNTY IN CHINO AND ONTARIO FROM CHINO AVENUE TO ROUTE 10/83 SEPARATION | 11/30/2023 | 1 (08/02/2023) | Details CEM-3701 Report |
5141 | Project ID: 5141 DEA: 080P3704 | 08-SBD-83,210-0.0/7.2,30.2/33.2 | REPLACE ASPHALT CONCRETE AND FOG SEAL | SAN BERNARDINO COUNTY IN CHINO AND SAN BERNARDINO ON ROUTE 38 FROM THE 71/83 SEPARATION TO ROUTE 60/83 SEPARATION AND ON ROUTE 210 FROM 5TH STREET UNDER CROSSING TO ROUTE 210/10 SEPARATION | 08/09/2011 | 1 (01/05/2012) | Details CEM-3701 Report |
993302 | Project ID: 993302 DEA: 081J2104 EFIS: 0817000240 | 08-SBD-60-R1.4 | PLACE LCB RAPID SETTING AND JOINTED PLAIN CONCRETE PAVEMENT. | SAN BERNARDINO COUNTY IN CHINO AT RAMONA AVENUE OVERCROSSING | 08/01/2024 | 1 (10/27/2021) | Details CEM-3701 Report |