Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14541-14550 of 16960 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994202 | Project ID: 994202 DEA: 114C0044 EFIS: 1122000099 | 11-SD-5-12.8/13.2 | CONSTRUCT NON-MOTORIZED PATHWAY, PRIVACY WALL AND LIGHTING. | SAN DIEGO COUNTY IN SAN DIEGO FROM 32ND STREET OVERCROSSING TO 0.1 MILE SOUTH OF 28TH STREET OVERCROSSING | 1 (01/27/2023) | Details CEM-3701 Report | |
214011 | Project ID: 214011 DEA: 112N0524 EFIS: 1118000248 | 11-SD-163-0.53/R11.66 | REMOVE AND REPLACE EXISTING TRAFFIC STRIPE AND PAVEMENT MARKINGS. | SAN DIEGO COUNTY IN SAN DIEGO FROM A STREET TO 0.5 MILE NORTH OF ROUTE 163/15 SEPARATION | 11/06/2019 | 1 (06/21/2019) | Details CEM-3701 Report |
210636 | Project ID: 210636 DEA: 112T1904 EFIS: 1100020291 | 11-SD-15-M5.6/R6.0 | CONSTRUCT BIKE FACILITY W/HMA-A, WALLS, BARRIERS, LIGHTS AND OH SIGN. | SAN DIEGO COUNTY IN SAN DIEGO FROM ADAMS AVENUE OVERCROSSING TO CAMINO DEL RIO SOUTH UNDERCROSSING | 06/11/2021 | 1 (03/11/2016) | Details CEM-3701 Report |
210457 | Project ID: 210457 DEA: 112M7504 EFIS: 1114000088 | 11-SD-163-0.6/4.0 | COLD PLANE AND PAVE WITH RUBBERIZED HOT MIX ASPHALT. | SAN DIEGO COUNTY IN SAN DIEGO FROM ASH STREET TO SAN DIEGO RIVER BRIDGE | 01/15/2016 | 1 (03/08/2016) | Details CEM-3701 Report |
210402 | Project ID: 210402 DEA: 112T0414 | 11-SD-88,12-26.8/27.3 | INSTALL HIGHWAY PLANTING, EROSION CONTROL AND IRRIGATION SYSTEMS. | SAN DIEGO COUNTY IN SAN DIEGO FROM CARROLL CANYON ROAD BRIDGE TO 0.2 MILE NORTH OF MIRA MESA BOULEVARD UNDERCROSSING | 05/10/2019 | 1 (06/21/2016) | Details CEM-3701 Report |
6992 | Project ID: 6992 DEA: 112T0954 EFIS: 1100000454 | 11-SD-15-M15.0/M16.4 | CONSTRUCT DIRECT ACCESS RAMPS TO I-15 MANAGED LANES AND TRANSIT STA. | SAN DIEGO COUNTY IN SAN DIEGO FROM CARROLL CANYON ROAD OVERCROSSING TO 0.5 MILE NORTH OF MIRA MESA BOULEVARD UNDERCROSSING | 03/14/2016 | 1 (07/25/2012) | Details CEM-3701 Report |
994947 | Project ID: 994947 DEA: 112T3644 | 11-SD-56-0.3/3.0 | CONSTRUCT JPCP, HMA, RHMA-G, SIGNS, BARRIERS, LANDSCAPE, & ELECTRICAL. | SAN DIEGO COUNTY IN SAN DIEGO FROM EL CAMINO REAL UNDERCROSSING TO 0.3 MILE WEST OF CARMEL VALLEY ROAD OVERCROSSING | NOT VERIFIED | Details CEM-3701 Report | |
8154 | Project ID: 8154 DEA: 11403704 EFIS: 1100000785 | 11-SD-163-5.8/6.4,8.5/8.8 | PLACE OUTER SEPARATION BARRIER AND HIGH SURFACE FRICTION TREATMENT. | SAN DIEGO COUNTY IN SAN DIEGO FROM GENESEE AVENUE UNDERCROSSING TO MESA COLLEGE DRIVE OVERCROSSING AND FROM 0.5 MILE NORTH OF BALBOA AVENUE OVERCROSSING TO CLAIREMONT MESA BOULEVARD OVERCROSSING | 08/01/2018 | 1 (12/10/2012) | Details CEM-3701 Report |
213368 | Project ID: 213368 DEA: 11419904 EFIS: 1115000038 | 11-SD-805-27.1/28.9 | GRIND PCC PAVEMENT, COLD PLANE, RHMA OVERLAY, AND SLAB REPLACEMENT. | SAN DIEGO COUNTY IN SAN DIEGO FROM MIRA MESA BLVD UC TO 0.4 MILE NORTH OF ROUTE 5/805 SEPARATION | 02/19/2020 | 1 (09/14/2018) | Details CEM-3701 Report |
208903 | Project ID: 208903 DEA: 11404304 EFIS: 1100020014 | 11-SD-4,99-R23.9/R25.5 | CONSTRUCT OUTER SEPARATION BARRIER, WIDEN SHOULDER, MODIFY DRAINAGE. | SAN DIEGO COUNTY IN SAN DIEGO FROM MISSION BAY DRIVE OVERCROSSING TO 0.5 MILE SOUTH OF LA JOLLA PARKWAY VIADUCT | 06/02/2015 | 1 (10/30/2013) | Details CEM-3701 Report |