Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14431-14440 of 17758 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
2574 | Project ID: 2574 DEA: 050H8234 EFIS: 0500000085 | 05-MON-68-13.1/13.6 | Construct road and intersection improvements at San Benicia Rd | Rte 68 in Monterey County | 1 (08/23/2011) | Details CEM-3701 Report | |
6811 | Project ID: 6811 DEA: 120M0604 EFIS: 1200020289 | 12-ORA-74-14.1 | Build Solider Berm Earth Retaining Wall | Rte 74 @ Ortega Hwy | 12/31/2011 | 1 (04/04/2011) | Details CEM-3701 Report |
210324 | Project ID: 210324 DEA: 030H3804 EFIS: 0315000153 | 03-PLA-80,080-41.80 | Culvert Replacement under ramp; installation of riser; cleaning existing pipe; repair and pave ramp | Rte 80 at the eastbound off-ramp to the Gold run Safety Roadside Rest Area | 11/07/2016 | 1 (09/23/2016) | Details CEM-3701 Report |
6839 | Project ID: 6839 DEA: 042G2704 EFIS: 0400020749 MINOR: 04A3834 | 04-SOL-80-2.35 | Repair 24" culvert and abandoned capped drainage inlet | Rte 80/780 interchange | 06/08/2020 | 1 (10/30/2019) | Details CEM-3701 Report |
214425 | Project ID: 214425 DEA: 051H9404 EFIS: 0517000022 MINOR: 05A2185 | 05-SCR-236- | Boulder Creek Curb Ramps | Rte 9 to Pine Street | 09/30/2019 | 1 (09/30/2019) | Details CEM-3701 Report |
4746 | Project ID: 4746 EFIS: 0000001155 Permit Numbers: 08086DP1215 | 08-RIV-91-12.902-13.187 | Install traffic signals | Rte 91 @ Tyler Street | 12/10/2009 | 1 (12/10/2009) | Details CEM-3701 Report |
212413 | Project ID: 212413 DEA: 120N2704 EFIS: 1213000187 | 12-ORA-91-13.8 | REMODEL RTE 91 WB WEIGH STATION | RTE 91 PERALTA WB WEIGH STATION | 09/09/2021 | 1 (03/22/2018) | Details CEM-3701 Report |
819 | Project ID: 819 DEA: 030C7704 | 03-PLA-80-R106.4/110.3 | Overlay concrete roadway, improve drainage and rehab bridge deck. | Rte. 80 | 01/20/2010 | 1 (01/20/2010) | Details CEM-3701 Report |
209606 | Project ID: 209606 Permit Numbers: 0312NSN0282 | 03-YOL-113-1.1/1.1 | 1. EV, Bike, and Ped surface improvements with a bike circle2. relocation/replacement of path lighting within footprint3. traffic signal modification - limited to resetting the bike push button and det. loop on south leg and addition of EV preemption devices | Russell Blvd, Davis | 04/27/2018 | 1 (05/20/2014) | Details CEM-3701 Report |
214172 | Project ID: 214172 Permit Numbers: 0417NMC1910 04196DP0966 | 04-SM-82-9.35/10.07 | The Peninsula Corridor Joint Powers Board (JPB), which operates the San Francisco Bay Area's Caltrain passenger rail intends to extend 28th Avenue and 31st Avenue west of El Camino Real (SR 82) in the same location as existing driveway access points... | S. El Camino Real, San Mateo | 03/16/2021 | 1 (05/22/2019) | Details CEM-3701 Report |