Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14341-14350 of 17992 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
7291 | Project ID: 7291 DEA: 08334884 EFIS: 0800000605 | 08-RIV-215-38.6/39.7 | PLANTING AND IRRIGATION | RIVERSIDE COUNTY IN RIVERSIDE FROM 0.3 MILE WEST OF CENTRAL AVENUE UNDERCROSSING TO 0.3 MILE EAST OF FAIR ISLE DRIVE UNDERCROSSING | 06/13/2016 | 1 (05/07/2012) | Details CEM-3701 Report |
5229 | Project ID: 5229 DEA: 08334874 EFIS: 0800000604 | 08-RIV-215-39.7/43.0 | REPLACEMENT PLANTING, IRRIGATION, AND BOOSTER PUMP INSTALLATION. | RIVERSIDE COUNTY IN RIVERSIDE FROM 0.8 MILE EAST OF MARTIN LUTHER KING BOULEVARD TO DOWN STREET OVERHEAD | 08/04/2016 | 1 (06/26/2012) | Details CEM-3701 Report |
1000501 | Project ID: 1000501 DEA: 081J6104 EFIS: 0818000102 | 08-RIV-215-40.5/42.7 | INDIVIDUAL SLAB REPLACEMENT (RSC), RHMA, AND REPLACE BASE. | RIVERSIDE COUNTY IN RIVERSIDE FROM 0.8 MILE SOUTH OF ROUTE 60/91 SEPARATION TO 0.4 MILE SOUTH OF MARTIN LUTHER KING BOULEVARD UNDERCROSSING | 1 (09/02/2024) | Details CEM-3701 Report | |
5266 | Project ID: 5266 DEA: 08448404 EFIS: 0800000712 COOP: 081488A1 | 08-RIV-91-15.6/21.6 | CONSTRUCT HOV LANES AND WIDEN BRIDGES. | RIVERSIDE COUNTY IN RIVERSIDE FROM ADAMS STREET TO THE ROUTE 60/215 SEPARATION | 07/27/2023 | 1 (04/27/2012) | Details CEM-3701 Report |
1000290 | Project ID: 1000290 DEA: 081N5704 EFIS: 0823000018 | 08-RIV-91-10.8/11.2 | CONCRETE (CHANNEL LINING), MISC IRON AND STEEL, & CHANNEL EXCAVATION. | RIVERSIDE COUNTY IN RIVERSIDE FROM PIERCE STREET UNDERCROSSING TO MAGNOLIA AVENUE UNDERCROSSING | 01/06/2025 | 1 (05/15/2024) | Details CEM-3701 Report |
5228 | Project ID: 5228 DEA: 08334864 EFIS: 0800000603 | 08-RIV-60,91,215-11.5/12.2,20.3/21.6,43.1/43.9 | CONSTRUCT WALLS, REPLACE HIGHWAY PLANTING AND IRRIGATION | RIVERSIDE COUNTY IN RIVERSIDE ON ROUTE 215 FROM DOWN STREET OVERHEAD TO COLOMBIA AVENUE OVERCROSSING ON ROUTE 60 FROM 0.2 MILE WEST OF MAIN STREET OVERCROSSING TO 215/60/91 SEPARATION ON ROUTE 91 FROM 0.2 MILE SOUTH OF UNIVERSITY AVENUE UNDERCROSSING TO 2 | 12/07/2015 | 1 (02/21/2011) | Details CEM-3701 Report |
6861 | Project ID: 6861 DEA: 080P8004 EFIS: 0800020032 | 08-RIV-15-8.0/50.0 | REPLACE VARIOUS SLABS | RIVERSIDE COUNTY IN RIVERSIDE, CORONA AND MURRIETA FROM 0.3 MILE NORTH OF RAINBOW VALLEY BOULEVARD OVERCROSSING TO 0.7 MILE NORTH OF BELLEGRAVE AVENUE. | 11/08/2012 | 1 (03/09/2012) | Details CEM-3701 Report |
4832 | Project ID: 4832 DEA: 080C4514 | 08-RIV-79-PM32.5/33.8 | DRAINAGE IMPROVEMENT, MBGR REPLACEMENT AND MODIFY LIGHTING. | RIVERSIDE COUNTY IN SAN JACINTO ON ROUTE 79 FROM RAMONA EXPRESSWAY TO GILMAN SPRINGS ROAD. | 06/08/2012 | 1 (06/08/2012) | Details CEM-3701 Report |
212311 | Project ID: 212311 DEA: 081G1104 EFIS: 0815000126 | 08-RIV-15-3.0/8.1 | PREVENTATIVE MAINTENANCE TREATMENT - OVERLAY | RIVERSIDE COUNTY IN TEMECULA AND MURRIETA FROM 0.4 MILE SOUTH OF ROUTE 15/79 SEPARATION TO 0.6 MILE SOUTH OF ROUTE 15/215 SEPARATION | 08/16/2023 | 1 (11/02/2017) | Details CEM-3701 Report |
995058 | Project ID: 995058 DEA: 081C5704 EFIS: 0812000332 | 08-RIV-15-3.4/10.5,14.9/16.0 | DRAINAGE IMPROVEMENT, HMA (MISCELLANEOUS AREA), AND EROSION CONTROL. | RIVERSIDE COUNTY IN TEMECULA AND MURRIETA FROM SOUTH JUNCTION ROUTE 79 TO 0.1 MILE SOUTH OF KALMIA STREET UNDERCROSSING AND IN WILDOMAR FROM 0.1 MILE SOUTH OF BAXTER ROAD OVERCROSSING TO 0.3 MILE SOUTH OF BUNDY CANYON ROAD UNDERCROSSING | 12/02/2024 | 1 (08/15/2023) | Details CEM-3701 Report |