Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14271-14280 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214425 | Project ID: 214425 DEA: 051H9404 EFIS: 0517000022 MINOR: 05A2185 | 05-SCR-236- | Boulder Creek Curb Ramps | Rte 9 to Pine Street | 09/30/2019 | 1 (09/30/2019) | Details CEM-3701 Report |
4746 | Project ID: 4746 EFIS: 0000001155 Permit Numbers: 08086DP1215 | 08-RIV-91-12.902-13.187 | Install traffic signals | Rte 91 @ Tyler Street | 12/10/2009 | 1 (12/10/2009) | Details CEM-3701 Report |
212413 | Project ID: 212413 DEA: 120N2704 EFIS: 1213000187 | 12-ORA-91-13.8 | REMODEL RTE 91 WB WEIGH STATION | RTE 91 PERALTA WB WEIGH STATION | 09/09/2021 | 1 (03/22/2018) | Details CEM-3701 Report |
819 | Project ID: 819 DEA: 030C7704 | 03-PLA-80-R106.4/110.3 | Overlay concrete roadway, improve drainage and rehab bridge deck. | Rte. 80 | 01/20/2010 | 1 (01/20/2010) | Details CEM-3701 Report |
209606 | Project ID: 209606 Permit Numbers: 0312NSN0282 | 03-YOL-113-1.1/1.1 | 1. EV, Bike, and Ped surface improvements with a bike circle2. relocation/replacement of path lighting within footprint3. traffic signal modification - limited to resetting the bike push button and det. loop on south leg and addition of EV preemption devices | Russell Blvd, Davis | 04/27/2018 | 1 (05/20/2014) | Details CEM-3701 Report |
214172 | Project ID: 214172 Permit Numbers: 0417NMC1910 04196DP0966 | 04-SM-82-9.35/10.07 | The Peninsula Corridor Joint Powers Board (JPB), which operates the San Francisco Bay Area's Caltrain passenger rail intends to extend 28th Avenue and 31st Avenue west of El Camino Real (SR 82) in the same location as existing driveway access points... | S. El Camino Real, San Mateo | 03/16/2021 | 1 (05/22/2019) | Details CEM-3701 Report |
993207 | Project ID: 993207 Permit Numbers: 04196SN2825 04206RT1409 04206RT2992 04216RT2271 04226RT0050 | 04---18.24 | Install two new traffic signals; one at the intersection of S. First Street and Chestnut Street and the other at the intersection of S. First Street and Valley Glen Drive; the S. First Street and Chestnut Street intersection include ADA ramp, crosswalk, drainage and asphalt updates on State Highway | S. First Street, Dixon | 10/14/2022 | 1 (10/22/2021) | Details CEM-3701 Report |
4247 | Project ID: 4247 DEA: 073X6204 | 07-LA-60-29.5 | Repair Maintenance Station Bldg | S. Garey Ave. in City of Pomona | 10/11/2012 | 1 (10/11/2012) | Details CEM-3701 Report |
215696 | Project ID: 215696 Permit Numbers: 07206SN2586 | 07-VEN-- | New crosswalk and traffic signal modification | S. VENTURA AVENUE & THOMPSON BOULEVARD | 1 (04/13/2021) | Details CEM-3701 Report | |
6833 | Project ID: 6833 DEA: 12A12314 | 12-ORA-57-17.5 | Remove HOV Buffer Stripe & Install HOV Ingress/Egress Stripe | S/B SR-57 HOV Lane | 08/05/2010 | 1 (08/05/2010) | Details CEM-3701 Report |