Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14101-14110 of 19103 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 10057 | Project ID: 10057 DEA: 051A9304 EFIS: 0512000042 | 05-SBT-101-.7 | Stabilize and Reconstruct Slope | Near Prunedale at .2 mile north of Cole Rd | 08/27/2018 | 1 (01/04/2016) | Details CEM-3701 Report |
| 15 | Project ID: 15 DEA: 010A6504 EFIS: 0100020324 | 01-HUM-101-41.8 | Repair roadway slipout | Near Red crest, 0.28 miles south of Bear Creek Bridge | 04/09/2013 | 1 (01/05/2011) | Details CEM-3701 Report |
| 8188 | Project ID: 8188 DEA: 024G0104 EFIS: 0213000059 | 02-SHA-299-19.0 | Replace 2- 72" Culverts | Near Redding at Middle Creek Road | 12/14/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 1002145 | Project ID: 1002145 DEA: 010A1114 EFIS: 0116000148 | 01-HUM-101-R53.7/M54.2 | South Fork Eel River Bridge Seismic | NEAR RIO DELL FROM 0.2 MILE SOUTH OF EEL RIVER BRIDGE TO 0.4 MILE SOUTH OF METROPOLITAN HEIGHTS ROAD | 1 (04/22/2026) | Details CEM-3701 Report | |
| 209466 | Project ID: 209466 DEA: 041J6504 EFIS: 0414000313 | 04-SOL-84-12.09 | The required temporary repairs include replacing deteriorated timber planks and stringers, placing corrugated metal over the existing timber deck system, and replacing asphalt concrete surfacing. | Near Rio Vista at the Miner Slough Bridge | 05/26/2016 | 1 (03/31/2014) | Details CEM-3701 Report |
| 212656 | Project ID: 212656 DEA: 100Q1604 EFIS: 1013000255 | 10-SJ-99-0.0/5.7 | Dig-outs, hot mix asphalt and rubberized hot mix asphalt resurfacing | Near Ripon from Stanislaus County Line to 0.2 mile South of Rte 120 Separation | 01/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 214414 | Project ID: 214414 DEA: 081K5704 EFIS: 0819000064 | 08-RIV-60-9.62/10.6 | Repair the washout shoulder and damaged pavement | Near Riverside from 0.07 miles east of Rubidoux Boulevard to 0.08 miles west of Santa Ana River Bridge | 09/10/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 209370 | Project ID: 209370 DEA: 010E4304 EFIS: 0114000067 | 01-MEN-1-92.58 | Stabilize slope, address drainage and construct rock buttress | Near Rockport on Route 1 at 0.05 mile North of Dunn Creek Bridge | 01/30/2015 | 1 (02/20/2014) | Details CEM-3701 Report |
| 210222 | Project ID: 210222 DEA: 043J8104 | 04-SCL-130-4.3/6.9 | Repair Slipouts with RSP and launched soils nails | Near San Jose, at 0.7 and 3.3 miles east of Alum Rock Avenue | 08/22/2018 | 1 (03/09/2015) | Details CEM-3701 Report |
| 210925 | Project ID: 210925 DEA: 040K7604 | 04-ALA-580-R30.59 | Repair Joint Seal Assemblies | Near San Leandro at Route 238 Separation Bridge No 33-0214L | 12/22/2017 | NOT VERIFIED | Details CEM-3701 Report |
