Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13971-13980 of 17180 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
819Project ID: 819
DEA: 030C7704
03-PLA-80-R106.4/110.3Overlay concrete roadway, improve drainage and rehab bridge deck.Rte. 8001/20/20101 (01/20/2010)Details CEM-3701 Report
209606Project ID: 209606
Permit Numbers: 0312NSN0282
03-YOL-113-1.1/1.11. EV, Bike, and Ped surface improvements with a bike circle2. relocation/replacement of path lighting within footprint3. traffic signal modification - limited to resetting the bike push button and det. loop on south leg and addition of EV preemption devicesRussell Blvd, Davis04/27/20181 (05/20/2014)Details CEM-3701 Report
214172Project ID: 214172
Permit Numbers: 0417NMC1910 04196DP0966
04-SM-82-9.35/10.07The Peninsula Corridor Joint Powers Board (JPB), which operates the San Francisco Bay Area's Caltrain passenger rail intends to extend 28th Avenue and 31st Avenue west of El Camino Real (SR 82) in the same location as existing driveway access points...S. El Camino Real, San Mateo03/16/20211 (05/22/2019)Details CEM-3701 Report
993207Project ID: 993207
Permit Numbers: 04196SN2825 04206RT1409 04206RT2992 04216RT2271 04226RT0050
04---18.24Install two new traffic signals; one at the intersection of S. First Street and Chestnut Street and the other at the intersection of S. First Street and Valley Glen Drive; the S. First Street and Chestnut Street intersection include ADA ramp, crosswalk, drainage and asphalt updates on State HighwayS. First Street, Dixon10/14/20221 (10/22/2021)Details CEM-3701 Report
4247Project ID: 4247
DEA: 073X6204
07-LA-60-29.5Repair Maintenance Station BldgS. Garey Ave. in City of Pomona10/11/20121 (10/11/2012)Details CEM-3701 Report
215696Project ID: 215696
Permit Numbers: 07206SN2586
07-VEN--New crosswalk and traffic signal modificationS. VENTURA AVENUE & THOMPSON BOULEVARD 1 (04/13/2021)Details CEM-3701 Report
6833Project ID: 6833
DEA: 12A12314
12-ORA-57-17.5Remove HOV Buffer Stripe & Install HOV Ingress/Egress StripeS/B SR-57 HOV Lane08/05/20101 (08/05/2010)Details CEM-3701 Report
6756Project ID: 6756
DEA: 120K3804
12-ORA-57-17.5HOV Lane REMOVE HOV BUFFER STRIPE AND INSTALL HOV INGRESS/EGRESS STRIPES/B SR-57 HOV LANE FROM ROLLING HILLS DR. UC TO NUTWOOD AVE. UC IN THE CITY OF FULLERTON08/05/20101 (08/05/2010)Details CEM-3701 Report
215738Project ID: 215738
DEA: 042Q8304
EFIS: 0419000056
COOP: 042803
04-ALA-680-4.8/5.0Improvements to the State Highway SystemSabercat Bridge and Trail connecting Ohlone College on the east side to future BART Station at Washington/Osgood and Blacow Road on the west, with a bicycle and pedestrian bridge over I-680 2 (09/07/2021)Details CEM-3701 Report
209319Project ID: 209319
DEA: 032F9404
EFIS: 0312000038
Permit Numbers: 0312NSN0800 0314NRT0089 0313NDP0775
03-SAC-99-33/34Traffic signal insallation, intersection and pedestrian improvementsSac 99, Sacramento02/06/20152 (02/14/2014)Details CEM-3701 Report