Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13961-13970 of 16097 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
208674 | Project ID: 208674 DEA: 100T7904 | 10-SJ-5-32.7/49.8 | INSTALL SHOULDER RUMBLE STRIP. | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE | 12/05/2013 | 1 (03/22/2013) | Details Personnel CEM-3701 Report |
212937 | Project ID: 212937 DEA: 101G7904 EFIS: 1017000077 | 10-SJ-5-32.7/49.8 | INDIVIDUAL SLAB REPLACEMENT (RSC). | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE | 07/09/2019 | 1 (06/13/2018) | Details Personnel CEM-3701 Report |
208624 | Project ID: 208624 DEA: 100V9204 EFIS: 1000020567 | 10-SJ-26-1.1/4.6,6.0/20.3 | REPAIR FAILED AREAS AND APPLY RUBBERIZED HMA (GAP GRADED). | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM ROUTE 26/99 SEPARATION TO NORD AVENUE AND FROM THOMPSON ROAD TO WIMER ROAD | 07/08/2014 | 1 (03/22/2013) | Details Personnel CEM-3701 Report |
5801 | Project ID: 5801 DEA: 100T8304 | 10-SJ-99-16.9/21.8,29.5/35.6 | Treat bridge decks and replace joint seals. | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM ROUTE 4 CONNECTOR OVERCROSSING TO CALAVERAS RIVER BRIDGE AND IN AND NEAR LODI FROM ROUTE 99/12 SEPARATION TO JAHANT ROAD OVERCROSSING | 05/17/2011 | 1 (05/17/2011) | Details Personnel CEM-3701 Report |
5811 | Project ID: 5811 DEA: 100T9904 | 10-SJ-5-25.4/30.0 | Replace PCC slabs. | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM ROUTE 5/4 SEPARATION TO MARCH LANE UNDERCROSSING | 05/17/2011 | 1 (05/17/2011) | Details Personnel CEM-3701 Report |
5845 | Project ID: 5845 DEA: 100U9504 | 10-SJ-5-25.4/30.0 | REPLACE PCC SLABS. | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM ROUTE 5/4 SEPARATION TO MARCH LANE UNDERCROSSING | 01/04/2013 | 1 (05/02/2011) | Details Personnel CEM-3701 Report |
7547 | Project ID: 7547 DEA: 103A1004 EFIS: 1000000409 | 10-SJ-4,99-R19.5/R20.1,15.0/18.6 | WIDEN FREEWAY, CONSTRUCT BRIDGES, PUMP PLANTS AND INTERCHANGES. | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON ON ROUTE 4 FROM ADELBERT AVENUE TO 0.1 MILE WEST OF GOLDEN GATE AVENUE OVERCROSSING AND ON ROUTE 99 FROM 0.4 MILE NORTH OF ARCH ROAD UNDERCROSSING TO 0.1 MILE SOUTH OF ROUTE 4 WEST/99 NORTH CONNECTOR OVERCROSSING | 09/21/2018 | 1 (12/10/2012) | Details Personnel CEM-3701 Report |
5605 | Project ID: 5605 DEA: 100L5704 EFIS: 1000000102 | 10-SJ-205-1.7/R12.6 | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEMS | SAN JOAQUIN COUNTY IN AND NEAR TRACY AT VARIOUS LOCATIONS FROM 0.3 MILE EAST OF MOUNTAIN HOUSE PARKWAY OVERCROSSING TO ROUTE 205/5 CONNECTOR SEPARATION | 10/31/2014 | 1 (04/14/2010) | Details Personnel CEM-3701 Report |
213951 | Project ID: 213951 DEA: 100X7004 EFIS: 1013000248 | 10-SJ-205-2.3/R9.6 | MVPS, GORE PAVING, SLOPE PAVING UNDER BRIDGES. | SAN JOAQUIN COUNTY IN AND NEAR TRACY AT VARIOUS LOCATIONS FROM HANSEN ROAD OVERCROSSING TO PARADISE ROAD OVERCROSSING | 12/02/2020 | 1 (04/11/2019) | Details Personnel CEM-3701 Report |
213162 | Project ID: 213162 DEA: 101G8104 EFIS: 1017000064 | 10-SJ-205-L0.0/2.6,R5.1/R13.4 | RHMA RESURFACING. | SAN JOAQUIN COUNTY IN AND NEAR TRACY FROM ALAMEDA COUNTY LINE TO 0.2 MILE EAST OF HANSEN ROAD OVERCROSSING AND FROM 0.2 MILE WEST OF GRANT LINE ROAD UNDERCROSSING TO ROUTE 5 | 12/04/2019 | 1 (12/20/2018) | Details Personnel CEM-3701 Report |