Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13941-13950 of 18150 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993410 | Project ID: 993410 DEA: 120Q3204 EFIS: 1216000129 | 12-ORA-22-R10.7/R12.7 | REPLACE CONCRETE BARRIER & SIGN PANEL; & MODIFY LIGHTING SYSTEM. | ORANGE COUNTY IN SANTA ANA AND ORANGE FROM 0.2 MILE WEST OF BEDFORD ROAD OVERCROSSING TO 0.2 MILE WEST OF TUSTIN AVENUE UNDERCROSSING | 01/03/2024 | 1 (12/15/2021) | Details CEM-3701 Report |
212513 | Project ID: 212513 DEA: 120N0804 EFIS: 1213000100 | 12-ORA-5,22,57-33.3/34.5,9.8/11.0,10.6/11.3 | PLANTING, IRRIGATION, ROCK BLANKET, MINOR CONC, MGS AND CONC BARRIER | ORANGE COUNTY IN SANTA ANA AND ORANGE ON ROUTE 5 FROM 0.3 MILE SOUTH OF BROADWAY OVERCROSSING TO SANTA ANA RIVER BRIDGE, ON ROUTE 22 FROM SANTA ANA RIVER BRIDGE TO MAIN STREET OVERCROSSING AND ON ROUTE 57 FROM ROUTE 5 TO 0.1 MILE NORTH OF CHAPMAN AVENUE U | 1 (03/22/2018) | Details CEM-3701 Report | |
6645 | Project ID: 6645 DEA: 120H5504 | 12-ORA-5,57-33.2/34.0,10.9/11.2 | IMPROVING SIGNING AND STRIPING | ORANGE COUNTY IN SANTA ANA AND ORANGE ON ROUTE 5 FROM MAIN STREET OVERCROSSING TO ROUTE 57 SEPARATION AND ON ROUTE 57 FROM ROUTE 5 SEPARATION TO 0.7 MILE SOUTH OF CHAPMAN AVENUE UNDERCROSSING | 10/29/2010 | 1 (03/15/2011) | Details CEM-3701 Report |
209956 | Project ID: 209956 DEA: 120J6404 EFIS: 1212000103 | 12-ORA-10,710-7.6/9.9 | CONTROL SOURCE OF SEDIMENT; IMPLEMENTATION OF EROSION CONTROL MEASURES | ORANGE COUNTY IN SANTA ANA AND TUSTIN FROM 0.2 MILE SOUTH OF DYER RD UNDERCROSSING TO 0.1 MILE SOUTH OF MCFADDEN AVENUE OVERCROSSING | 12/04/2015 | 1 (01/06/2016) | Details CEM-3701 Report |
210510 | Project ID: 210510 DEA: 120H8904 | 12-ORA-55,5-9.6/12.0,29.6/31.1 | ROADSIDE SAFETY IMPROVEMENT | ORANGE COUNTY IN SANTA ANA AND TUSTIN ON ROUTE 55 FROM MCFADDEN AVENUE TO 17TH STREET AND ON ROUTE 5 FROM NEWPORT AVENUE TO 4TH STREET | 05/10/2016 | 1 (06/29/2021) | Details CEM-3701 Report |
6513 | Project ID: 6513 DEA: 120E2504 | 12-ORA-55-7.0/7.9 | Widen freeway. | ORANGE COUNTY IN SANTA ANA FROM 0.1 MILE NORTH OF MACARTHUR BOULEVARD UNDERCROSSING TO 0.2 MILE SOUTH OF DYER ROAD UNDERCROSSING | 12/02/2011 | 1 (12/02/2011) | Details CEM-3701 Report |
211905 | Project ID: 211905 DEA: 120N2804 EFIS: 1213000191 | 12-ORA-5-33.6/34.1 | GRIND & GROOVE CONC PVMT, HMA PAVING, SLAB REPLACEMENT & LIGHTING | ORANGE COUNTY IN SANTA ANA FROM 0.4 MILE SOUTH TO 0.1 MILE NORTH OF ROUTE 22/5 SEPARATION | 10/16/2017 | 1 (04/24/2017) | Details CEM-3701 Report |
214195 | Project ID: 214195 DEA: 120N5104 | 12-ORA-5-31.0/33.3 | CONSTRUCT MINOR CONCRETE AND INSTALL IRRIGATION SYSTEMS AND PLANTING. | ORANGE COUNTY IN SANTA ANA FROM FOURTH STREET OVERCROSSING TO BROADWAY OVERCROSSING | 01/18/2022 | 1 (09/12/2019) | Details CEM-3701 Report |
213615 | Project ID: 213615 DEA: 120N5004 | 12-ORA-22,55-R11.7/R13.2,12.0/13.4 | CONST SLOPE PAVING, MINOR CONC IN NARROW AREAS, MAINT ACCESS ROADS | ORANGE COUNTY IN SANTA ANA, AND TUSTIN ON ROUTE 55 FROM 0.3 MILE SOUTH OF 17TH STREET TO 0.06 MILE SOUTH OF SANTIAGO CREEK AND ON ROUTE 22 FROM ROUTE 55 TO 0.03 MILE WEST OF SANTIAGO CREEK | 02/19/2020 | 1 (09/10/2018) | Details CEM-3701 Report |
6787 | Project ID: 6787 DEA: 120L1104 | 12-ORA-5-31.4/42.5 | REMOVE AND REPLACE PAVEMENT DELINEATION | ORANGE COUNTY IN SANTA ANA, ORANGE, FULLERTON, ANAHEIM, AND BUENA PARK FROM 0.4 MILE SOUTH OF GRAND AVENUE UNDERCROSSING TO 0.6 MILE NORTH OF MAGNOLIA AVENUE OVERCROSSING | 12/19/2011 | 1 (12/19/2011) | Details CEM-3701 Report |