Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13911-13920 of 17447 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
7291Project ID: 7291
DEA: 08334884
EFIS: 0800000605
08-RIV-215-38.6/39.7PLANTING AND IRRIGATIONRIVERSIDE COUNTY IN RIVERSIDE FROM 0.3 MILE WEST OF CENTRAL AVENUE UNDERCROSSING TO 0.3 MILE EAST OF FAIR ISLE DRIVE UNDERCROSSING06/13/20161 (05/07/2012)Details CEM-3701 Report
5229Project ID: 5229
DEA: 08334874
EFIS: 0800000604
08-RIV-215-39.7/43.0REPLACEMENT PLANTING, IRRIGATION, AND BOOSTER PUMP INSTALLATION.RIVERSIDE COUNTY IN RIVERSIDE FROM 0.8 MILE EAST OF MARTIN LUTHER KING BOULEVARD TO DOWN STREET OVERHEAD08/04/20161 (06/26/2012)Details CEM-3701 Report
5266Project ID: 5266
DEA: 08448404
EFIS: 0800000712
COOP: 081488A1
08-RIV-91-15.6/21.6CONSTRUCT HOV LANES AND WIDEN BRIDGES.RIVERSIDE COUNTY IN RIVERSIDE FROM ADAMS STREET TO THE ROUTE 60/215 SEPARATION07/27/20231 (04/27/2012)Details CEM-3701 Report
1000290Project ID: 1000290
DEA: 081N5704
EFIS: 0823000018
08-RIV-91-10.8/11.2CONCRETE (CHANNEL LINING), MISC IRON AND STEEL, & CHANNEL EXCAVATION.RIVERSIDE COUNTY IN RIVERSIDE FROM PIERCE STREET UNDERCROSSING TO MAGNOLIA AVENUE UNDERCROSSING 1 (05/15/2024)Details CEM-3701 Report
5228Project ID: 5228
DEA: 08334864
EFIS: 0800000603
08-RIV-60,91,215-11.5/12.2,20.3/21.6,43.1/43.9CONSTRUCT WALLS, REPLACE HIGHWAY PLANTING AND IRRIGATIONRIVERSIDE COUNTY IN RIVERSIDE ON ROUTE 215 FROM DOWN STREET OVERHEAD TO COLOMBIA AVENUE OVERCROSSING ON ROUTE 60 FROM 0.2 MILE WEST OF MAIN STREET OVERCROSSING TO 215/60/91 SEPARATION ON ROUTE 91 FROM 0.2 MILE SOUTH OF UNIVERSITY AVENUE UNDERCROSSING TO 212/07/20151 (02/21/2011)Details CEM-3701 Report
6861Project ID: 6861
DEA: 080P8004
EFIS: 0800020032
08-RIV-15-8.0/50.0REPLACE VARIOUS SLABSRIVERSIDE COUNTY IN RIVERSIDE, CORONA AND MURRIETA FROM 0.3 MILE NORTH OF RAINBOW VALLEY BOULEVARD OVERCROSSING TO 0.7 MILE NORTH OF BELLEGRAVE AVENUE.11/08/20121 (03/09/2012)Details CEM-3701 Report
4832Project ID: 4832
DEA: 080C4514
08-RIV-79-PM32.5/33.8DRAINAGE IMPROVEMENT, MBGR REPLACEMENT AND MODIFY LIGHTING.RIVERSIDE COUNTY IN SAN JACINTO ON ROUTE 79 FROM RAMONA EXPRESSWAY TO GILMAN SPRINGS ROAD.06/08/20121 (06/08/2012)Details CEM-3701 Report
212311Project ID: 212311
DEA: 081G1104
EFIS: 0815000126
08-RIV-15-3.0/8.1PREVENTATIVE MAINTENANCE TREATMENT - OVERLAYRIVERSIDE COUNTY IN TEMECULA AND MURRIETA FROM 0.4 MILE SOUTH OF ROUTE 15/79 SEPARATION TO 0.6 MILE SOUTH OF ROUTE 15/215 SEPARATION08/16/20231 (11/02/2017)Details CEM-3701 Report
995058Project ID: 995058
DEA: 081C5704
EFIS: 0812000332
08-RIV-15-3.4/10.5,14.9/16.0DRAINAGE IMPROVEMENT, HMA (MISCELLANEOUS AREA), AND EROSION CONTROL.RIVERSIDE COUNTY IN TEMECULA AND MURRIETA FROM SOUTH JUNCTION ROUTE 79 TO 0.1 MILE SOUTH OF KALMIA STREET UNDERCROSSING AND IN WILDOMAR FROM 0.1 MILE SOUTH OF BAXTER ROAD OVERCROSSING TO 0.3 MILE SOUTH OF BUNDY CANYON ROAD UNDERCROSSING 1 (08/15/2023)Details CEM-3701 Report
211876Project ID: 211876
DEA: 081C1404
08-RIV-15-4.8/6.5ROADSIDE SAFETY IMPROVEMENTSRIVERSIDE COUNTY IN TEMECULA FROM 0.2 MILE SOUTH OF RANCHO CALIFORNIA ROAD OVERCROSSING TO 0.1 MILE SOUTH OF WINCHESTER ROAD OVERCROSSING08/01/2018NOT VERIFIEDDetails CEM-3701 Report