Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13911-13920 of 14597 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActionsSample
      
213818Project ID: 213818
Permit Numbers: 11186MC0444 11196RT0258
11---4.53/-1enter upon State Highway right of way in San Diego County, City of Oceanside on Route 76, post mile R4.53, to install new traffic signals at the intersection of Mission Gate Drive and Mission Avenue, as shown on the attached plans, in accordance with the requirements and conditions contained hereinState Route 76, Oceanside 1 (06/14/2019)DetailsPersonnelView Sample
4760Project ID: 4760
Permit Numbers: 0808NMC0594 0809NRT0367 08096DP05163
08-RIV-79-29.88/29.88Enter onto State Route 79 (Ramona Expressway) right-of-way at Sanderson Avenue intersection, in City of San Jacinto, to provide street improvements by adding an additional left-turn lane and through-lane on all four approaches of the intersection, AC overState Route 79 (Ramona Expressway), San Jacinto07/03/2009NOT VERIFIEDDetailsPersonnelView Sample
4791Project ID: 4791
EFIS: 0000001155
Permit Numbers: 0809NMC0225
08-RIV-79-7.6/8Enter onto State Route 79 (Winchester Road) right-of-way at Clinton Keith Road/Benton Road, in the City of Murrieta, to widen the southbound State highway and to add the fourth leg of the street intersection (Clinton Keith Road) which include but not limitState Route 79 (Winchester Road), Murrieta08/30/20122 (08/30/2012)DetailsPersonnelView Sample
5195Project ID: 5195
DEA: 080K4004
EFIS: 0800000345
Permit Numbers: 0811NMC0640 0811NMC0640
08-RIV-79-7.63/8.44Enter onto State Route 79 (Winchester Road) at and near Thompson Road, in the City of Murrieta, to widen the State highway including but not limited to the construction of a new AC pavement, curb & gutter, sidewalk, handicapped ramps, storm drain pipes, landscape, street lights, and traffic sigState Route 79 (Winchester Road), Murrieta07/31/2018NOT VERIFIEDDetailsPersonnelView Sample
5196Project ID: 5196
DEA: 08464614
EFIS: 0800001041
Permit Numbers: 0811NMC0714 0812NDP0176 0812NRT1148
08-RIV--12.2/15.8Enter onto State Route 79 (Winchester Road) right-of-way between Scott Road and Domenigoni Parkway, near Murrieta area, to widen one side of the State highway from two to four lanes, including but not limited to drainage, erosion control, signal & ligState Route 79 (Winchester Road), Murrieta area 1 (05/17/2012)DetailsPersonnelView Sample
7273Project ID: 7273
EFIS: 0000001155
Permit Numbers: 08126RT0181
08-RIV-79-18.47/18.472Enter onto State Route 79 right-of-way at Stetson Avenue, in Winchester area, Riverside County, to perform roadway improvements including pavement widening, AC overlay, sidewalk, curb gutter, street lights, pedestrian access ramps, traffic signal.State Route 79 (Winchester Road), Winchester01/07/20071 (01/07/2007)DetailsPersonnelView Sample
4742Project ID: 4742
EFIS: 0000001155
Permit Numbers: 08086CD0771
08-RIV-79-14.8/15.6Enter onto State Route 79 right-of-way between Temecula Creek Road and Horizontal View Street, near Temecula area, to construct street improvement which includes AC pavement, curb, sidewalk, signs, striping, concrete raised median, catch basin, storm drainState Route 79 , Temecula Area06/08/2012NOT VERIFIEDDetailsPersonnelView Sample
208633Project ID: 208633
Permit Numbers: 0811NRW1041 0811NMC0027 0811NUM0028 08126DP0175 0811NRW1042 0812NRT1145 0812NRT1144 08126RT1146
08-RIV-79-13.8/13.8Enter onto State Route 79 right-of-way at Craig Road to extend the existing 16\" diameter steel casing and the 10\" diameter water pipeline beyond the State\'s Right-of-Way using open trench method as per plans date stamped February 15, 2011 by the DepartState Route 79, County06/11/20131 (02/26/2013)DetailsPersonnelView Sample
7214Project ID: 7214
DEA: 08464624
EFIS: 0800001042
Permit Numbers: 0812NMC0088
08-RIV-79-R13.5/R19.2,R24.0/R24.4Enter onto State right-of-way to widen State Route 79/Winchester Road from Abelia Street (PM 10.40) to 250 m north of Scott Road (PM 12.24) and widening from 355 m south of Newport Road to Newport Road (PM 15.15). Modified signal and lighting plans for AbState Route 79/Winchester Road, Riverside County 1 (03/26/2013)DetailsPersonnelView Sample
213176Project ID: 213176
DEA: 044G6044
EFIS: 0416000117
COOP: 042684
04-SM-82-20.9/21.6Grand Boulevard Initiative Complete Streets Program, construct median landscaping and other sustainable green features in SSFState Route 82 (El Camino Real) from approximately 250' south of Kaiser Way to the McLellan Drive intersection 2 (11/04/2019)DetailsPersonnelView Sample