Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13761-13770 of 17288 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
5267 | Project ID: 5267 DEA: 08449314 EFIS: 0800000715 | 08-RIV-60,215-R19.7/21.9,R61.3/62.7 | ADD HOV LANE IN EACH DIRECTION AND REPLACE STRUCTURES. | RIVERSIDE COUNTY IN MORENO VALLEY ON ROUTE 215 FROM 0.9 KM NORTH OF EUCALYPTUS AVENUE UNDERCROSSING TO 0.5 KM WEST OF BOX SPRINGS ROAD OVERCROSSING AND ON ROUTE 60 FROM 60/215 SEPARATION TO 0.4 KM EAST OF DAY STREET OVERCROSSING | 04/03/2015 | 1 (04/13/2011) | Details CEM-3701 Report |
213416 | Project ID: 213416 DEA: 081C1604 | 08-RIV-60,215-R38.3/38.9,12.1/21.5 | INSTALL ROCK BLANKET AND IMPROVE IRRIGATION SYSTEM. | RIVERSIDE COUNTY IN MORENO VALLEY ON ROUTE 60 FROM 215/60 SEPARATION TO THEODORE STREET AND ON ROUTE 215 FROM 0.3 MILE NORTH OF BOX SPRINGS ROAD TO 0.6 MILE SOUTH OF BOX SPRINGS ROAD | 06/23/2021 | 1 (12/31/2018) | Details CEM-3701 Report |
995060 | Project ID: 995060 DEA: 081J2604 EFIS: 0818000012 | 08-RIV-215-R13.5/R19.5 | RHMA, REPLACE AC SURFACING, ROCK BLANKET, AND COMPOST. | RIVERSIDE COUNTY IN MURRIETA AND MENIFEE FROM 1.0 MILE NORTH OF CLINTON KEITH ROAD TO 1.0 MILE NORTH OF NEWPORT ROAD | 1 (08/15/2023) | Details CEM-3701 Report | |
994591 | Project ID: 994591 DEA: 081J6704 EFIS: 0818000090 | 08-RIV-15-9.4/16.3 | MINOR CONCRETE, MODIFYING SIGNAL AND LIGHTING SYSTEMS, HMA AND JPCP. | RIVERSIDE COUNTY IN MURRIETA AND WILDOMAR AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF MURRIETA HOT SPRINGS ROAD OVERCROSSING TO BUNDY CANYON ROAD UNDERCROSSING. | 1 (06/20/2023) | Details CEM-3701 Report | |
994587 | Project ID: 994587 DEA: 081G8904 EFIS: 0816000099 | 08-RIV-15-8.2/13.9 | STAMPED CONCRETE, ROCK BLANKET, MGS, AND VEGETATION CONTROL. | RIVERSIDE COUNTY IN MURRIETA AND WILDOMAR FROM 0.5 MILE SOUTH OF ROUTE 15/215 SEPARATION TO 0.3 MILE NORTH OF CLINTON KEITH ROAD | 1 (07/28/2023) | Details CEM-3701 Report | |
213816 | Project ID: 213816 DEA: 081G8704 EFIS: 0816000094 | 08-RIV-215-R12.7-R15.0 | PLACE MIDWEST GUARDRAIL SYSTEM ON ROUTE NB 215 | RIVERSIDE COUNTY IN MURRIETA FROM 0.2 MILES NORTH OF CLINTON KEITH ROAD OVERCROSSING TO 0.5 MILES SOUTH OF SCOTT ROAD OVERCROSSING | 09/30/2019 | 1 (09/30/2019) | Details CEM-3701 Report |
213309 | Project ID: 213309 DEA: 081H0904 EFIS: 0816000141 | 08-RIV-15-43.5 | CONSTRUCT A SECOND LEFT-TURN LANE | RIVERSIDE COUNTY IN NORCO AT SECOND STREET UNDERCROSSING. | 12/12/2019 | 1 (09/05/2018) | Details CEM-3701 Report |
213604 | Project ID: 213604 DEA: 080R3014 EFIS: 0817000223 | 08-RIV-111-47.2/55.3 | CONSTRUCT & RECONSTRUCT CURB RAMPS. | RIVERSIDE COUNTY IN PALM SPRINGS AT VARIOUS LOCATIONS FROM GOLF CLUB DRIVE TO GATEWAY DRIVE | 11/12/2019 | 1 (12/12/2018) | Details CEM-3701 Report |
1000289 | Project ID: 1000289 DEA: 080R7904 | 08-RIV-111-T53.9 | SIGNAL AND LIGHTING SYSTEM. | RIVERSIDE COUNTY IN PALM SPRINGS AT VISTA CHINO | NOT VERIFIED | Details CEM-3701 Report | |
5119 | Project ID: 5119 DEA: 080N2904 | 08-RIV-111-T53.0/56.2 | Cold Plane And Overlay Rhma (open Graded) | RIVERSIDE COUNTY IN PALM SPRINGS FROM 0.1 MILE NORTH OF SUNRISE WAY TO 0.3 MILE NORTH OF CHINO CANYON CREEK | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |